Planning-report-12 Figbird Court 1 Dec 2021 Final

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 Performance outcomes                      Acceptable outcomes               Response

 Waterways and wetlands
                                                                             and which will not adversely impact on
                                                                             the biodiversity and ecosystem values
                                                                             of the waterway and the riparian area.


4.2.4 Regional Infrastructure Overlay – Area subject to Water resource catchment
and Water supply buffer area
Table 8.2.9.3 Criteria for assessable development – Water Resources
 Performance outcomes                      Acceptable outcomes               Response
 Water catchment
 PO1                                                                         PO1
 Development does not cause                No acceptable outcomes provided   The proposed development is part
 adverse effects on:                                                         located within the Water resource
                                                                             catchment and the Water supply
                                                                             buffer areas.
 1. the quality and quantity of
    water entering Lake
    Macdonald, Cedar Pocket
    Dam or its tributaries, or the
    Mary River drinking water
    intake;
 2. flow regimes, flooding levels or
    flood volumes outside the
    boundaries of the site; and
 3. the environmental values, land
    resources and natural systems
    in these catchments.

 Editor’s Notes—                                                             The proposed development is a
 Requirements relating to water                                              modest 146.74 SQM three-bedroom
 quality, stormwater management                                              extension to an existing dwelling
 and effluent disposal are                                                   house to allow the existing 82.4
 contained in the Water Quality and                                          SQM two-bedroom dwelling to be
 Drainage Code in Part 9.                                                    used as a secondary dwelling.

                                                                             The proposed development will be
 Requirements relating to
                                                                             connected to the existing 10 EP
 excavation and filling are                                                  Advanced secondary effluent HSTP
 contained in the Earthworks                                                 and treated waste water will be
 Code in Part 9.                                                             pumped to a new surface irrigation
                                                                             area outside the Lake Macdonald
 Requirements relating to flooding                                           catchment.
 and environment protection and
 waterways management are                                                    Surface water and roof drainage is
                                                                             planned to be discharged to a legal
 contained in the Flood Hazard
                                                                             point of discharge via a rubble pit.
 Overlay Code and the Biodiversity,
 Waterways and Wetlands Overlay                                              No new driveway areas are
 Code in Part 8.                                                             proposed and driveway drainage is
                                                                             diverted away from the Water
                                                                             resource catchment and the Water
                                                                             supply buffer areas.




DA forms guide: Planning report template | July 2017                                                        Page 18 of 48
Log in to download the original file

Planning-report-12 Figbird Court 1 Dec 2021 Final.pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.