Original source · versioned page text
Planning-report-12 Figbird Court 1 Dec 2021 Final
Very large file: it may take a few minutes
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Performance outcomes Acceptable outcomes Response
Management of impacts
on landward horizons along
coastal areas and known marine
turtle nesting beaches.
AO4.4
Clearing of vegetation does not AO4.4
involve clearing that may cause or Vegetation clearing is not required
contribute to hillslope erosion, bank to facilitate [proposed development.
erosion, or slippage.
Connectivity Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Connectivity
PO5 AO5 AO5
Development is designed and operated Development is designed and operated The proposed development is located
to maintain and enhance connectivity to maintain ecological linkages and in an existing cleared area and
between and across ecologically maximise opportunity for connectivity clearing of vegetation is not required
important areas and connecting habitat and the movement of fauna by: to facilitate the proposed
and support unimpeded and safe development.
movement of terrestrial and aquatic 1. ensuring protection of wildlife
fauna. refuges; The image below shows the lot in
2. maintaining vegetation in patches of 2008.
the greatest possible size and
within the smallest possible edge-
to-area ratio;
3. enhancing connectivity through
planting and rehabilitation works,
including across property
boundaries, to areas of
national park, state forest or
reserve;
4. avoiding the creation of physical
barriers and safety hazards (such
as roads, pedestrian access and
instream structures) along and And in 2019
within the ecological linkage;
5. providing mitigation measures such
as wildlife movement infrastructure,
fauna exclusion and directional
fencing, underpasses/overpasses
and traffic calming devices, signage
and lighting; and
6. where offsets are necessary,
delivering offsets that support and
enhance ecological linkages.
Connectivity is gradually being
restored over time. As no clearing is
proposed and over 90% of the lot is
retained as open area and connectivity
has improved over time additional
measures to allow safe movement of
fauna are not considered necessary as
part of this development proposal.
DA forms guide: Planning report template | July 2017 Page 37 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.