Rehabilitation of ecologically important areas Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Rehabilitation of ecologically important areas
PO10 AO10.1 AO10.1
Development provides Landscaping and The development proposal will include
for ecologically important areas to rehabilitation complements and site works to restore and rehabilitate
areas affected by building work and to
be restored and enhanced through: supports ecologically important
match existing ground surface levels.
areas by:
1. designing landscaped areas to
complement and enhance 1. utilising local native species;
existing vegetation and ecologi 2. utilising suitable plant species
cal linkages; identified in PSP2 Landscaping;
2. removing species likely to 3. restoring degraded ecosystems
displace native flora species or to achieve a functional
degrade fauna habitat; ecosystem state that requires
3. replanting and rehabilitating minimal human intervention;
degraded habitat; 4. replicating adjacent remnant
4. replacing habitats of the same type,
any vegetation removed with including the
suitable local native species; understorey vegetation;
5. providing for fauna habitat; and 5. creating or enhancing linkages
6. avoiding the planting of pest between existing habitats;
plant species. 6. avoiding the use of pest plant
species listed in PSP2 -
Landscaping;
7. planting riparian zones to filter
stormwater run-off, stabilise soil
and provide for wildlife habitat;
and
8. providing ground and arboreal
structures for fauna, which may
include ground depressions,
rocks, hollows, nesting boxes
and in-stream habitat.
AO10.2 AO10.2
Vegetation cleared is replaced with: NA
No vegetation clearing is proposed as
1. plantings of equivalent area that part of this development.
replicate the floristic structure of
the vegetation removed; or
2. where this is not possible due to
the characteristics of
the site and the development,
plantings twice the number of
the removed trees and plants.
Editor’s Note — Revegetation and
rehabilitation works are to be carried
out in accordance with an approved
Revegetation and Rehabilitation
Management Plan, as referred to
in PSP3 Ecological assessment
guidelines.
DA forms guide: Planning report template | July 2017 Page 41 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.