Original source · versioned page text
6.5.22 - Council meeting 19 April
0121345ÿ7899 11ÿ911 20ÿ9 2 1 ÿ ÿ435ÿÿ
ÿ
ÿ
ÿÿÿÿÿ!"ÿ
#$"ÿ%ÿ&ÿ&'ÿ(ÿ))ÿÿ**)*ÿ+ÿÿÿ*&ÿ)ÿ)ÿÿÿ
*ÿÿÿ, "ÿ-ÿÿ, ÿÿ.'*ÿÿÿ/*ÿ'!0ÿÿ&ÿ
)*'&12345ÿ7892ÿ:;ÿ35ÿ1<<4=>15<;ÿ?32@ÿ2@;ÿA=152;;B9ÿ9215>1=>ÿ;19;7;52ÿ2;=79CÿD=1E2ÿ
&ÿ)*'&ÿ&'ÿ(ÿ'(&)ÿÿ.'*ÿÿ)&"ÿ
#F"ÿ%ÿ+Gÿ&'ÿ(ÿGÿ*ÿÿ!ÿHÿÿ)ÿ&ÿÿÿ'(I*ÿ)0ÿ
'ÿ)ÿ+ÿÿ+ÿ(!ÿÿ, "ÿ
1JKLMNOKPQÿJRSÿ3TLJURURVÿWJXXQÿ
#Y"ÿ%ÿÿ)ÿ*)ÿ(ÿ&'ÿ(ÿ')Gÿÿ**)*ÿ+ÿÿZÿ-Gÿ
/0ÿ)ÿ(ÿ!ÿÿ**)*ÿ+ÿ)+ÿ["ÿF$\]^_`aaY0ÿb/ÿcÿ
)ÿ(!ÿdZeÿÿ))ÿF$ÿf*ÿFaFFÿ)ÿÿ/)ÿ)ÿ/ÿÿ
ÿ&))ÿ(!ÿ*)ÿ"ÿdÿ+Gÿ&'ÿ(ÿ*&)ÿÿÿÿÿÿ
ÿ'/!ÿÿÿgÿF"ÿ
hJiJVTÿLOÿTKjUkTQÿJRSÿ4QQTLQÿ
#l"ÿ%!ÿ)&ÿ*')ÿÿHÿ/*ÿ)ÿÿÿÿ'ÿÿÿ)/&ÿ+Gÿ
&'ÿ(ÿ)ÿÿÿ*ÿÿÿÿ+ÿÿÿ+ÿ&mÿ
"ÿ +ÿÿ)&ÿ+')ÿ*'ÿÿn)ÿÿ)ÿÿ/*ÿ!0ÿ&&)!oÿ
ÿ
("ÿ +ÿ+0ÿ'ÿ*&ÿÿÿ+Gÿ*)ÿ+ÿÿ)/&"ÿ
%!ÿÿ+Gÿ+*ÿÿÿÿÿ&ÿÿ/ÿÿHÿ/*ÿ)ÿÿ
&'ÿÿ(ÿ )ÿÿÿ/ÿ/*ÿ'!ÿÿ/"ÿ
c"ÿ p*')ÿÿ+ÿ!ÿÿÿÿ98:q;<2ÿr=4r;=2sÿ35ÿt485<3uB9ÿr=4r;=2sÿ=;<4=>ÿ
!&mÿ
345vwwÿxÿKOyTKLzÿ4kkTQQÿhKUjTNJzÿÿ
$"ÿ dÿ+ÿÿÿÿÿ/)ÿmÿ
`/ÿ.0ÿ+ÿ)ÿ*/ÿ'*ÿÿ)ÿÿ*ÿ**ÿ
{'&ÿ!ÿÿÿ*ÿÿ)"ÿ.*ÿ.'*|ÿ̀ÿe&ÿÿe"ÿ
345vwwxÿKOyTKLzÿ4kkTQQÿ
F"ÿ dÿ+ÿÿÿÿ/)ÿÿ$0ÿF0ÿYÿ)ÿ\mÿ
[ÿ/*ÿ**ÿÿ&)ÿÿÿ!ÿ&ÿÿf*}ÿe/"ÿ
345vwwxÿKOyTKLzÿ4kkTQQÿ
Y"ÿ dÿ+ÿÿÿÿÿ/)ÿmÿ
dÿ**ÿ)ÿÿÿ!ÿ&!ÿ(ÿ*'ÿ)'ÿ)ÿ)"ÿ[ÿ/ÿ**ÿÿ
/("ÿ
345vwwÿ~ÿTVTLJLUORÿKOLTkLUORÿ7OjTRJRLÿ
l"ÿ dÿ+ÿÿÿÿÿ/)ÿmÿ
%ÿÿ`*ÿ./ÿÿÿÿ"ÿ[ÿ*ÿÿ/ÿÿÿ**'ÿ
+ÿÿ*/)ÿ0ÿH*ÿ+ÿÿ**)*ÿ+ÿÿ&ÿÿÿ*/"ÿ
345vwwÿ~ÿ1kOXOVUkJXÿKTQTKjJLUORÿ
\"ÿ dÿ+ÿÿÿÿÿ/)ÿmÿ
dÿ'ÿÿ*ÿÿ/ÿÿÿ0ÿ!ÿ)+ÿÿÿÿÿ{')ÿ(!ÿ
.'*ÿ%/ÿb%F$aaYYÿÿ(ÿ*'*)ÿ+ÿÿ(')ÿ/ÿ&)ÿÿ
ÿ/)ÿÿb*'ÿÿÿÿ.'*ÿÿ*ÿb%F$aaYY"ÿ
[OCR of page images]
GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022
61.
62.
63.
64.
against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and be generally in accordance with drawing No. 21598-P003, Revision B
prepared by TOD engineering dated 21 March 2022 and the approved flood investigation or
as amended by conditions herein. The earthworks must be completed prior to the sealing of
the survey plan for Stage 2.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Include the following property notes against the subject property in Council's property record
system:
RAL21/0033 - Property Access Driveway
The following notation applies to the approved lots:
Private Certifiers, owners and prospective purchasers are notified that special access
requirements apply to this parcel of land. Contact Council's Planning Department for Details.
RAL21/0033- Property Access
The following notation applies to approved lots 1, 2, 3 and 5:
No vehicle access is permitted to this property from the McKinnon Drive.
RAL21/0033- Property Access
The following notation applies to the approved lots:
The access road to this property may be cut during flood periods. No alternative access is
available.
RAL21/0033 — Vegetation Protection Covenant
The following notation applies to the approved lots:
A Vegetation Protection Covenant applies to this lot. No clearing of vegetation is to occur
within the covenanted area, except where in accordance with the terms of the covenant.
RAL21/0033 — Ecological Preservation
The following notation applies to the approved lots:
To ensure the protection of vegetation on this lot, any dwelling on this lot is required by
Council Approval RAL21/0033 to be constructed within the building envelope nominated on
the approved Lot Reconfiguration proposal plan (see Council file reference RAL21/0033).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.