Original source · versioned page text
6.5.22 - Council meeting 19 April
0121345ÿ7899 11ÿ911 20ÿ9 2 1 ÿ ÿ435ÿÿ
ÿ
ÿ
4ÿÿÿÿÿ434ÿ! !ÿ"ÿÿ
ÿ
ÿ
ÿ
[OCR of page images]
GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022
Attachment 2 - excerpt from SARA response —
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
the State Development Assessment Provisions (SDAP) [v2.6]. If a word remains undefined it
has its ordinary meaning.
Encroachment into adjacent water allocation - 160 on N21859
2. It is noted that the structure is shown as 17cm into the adjacent property boundary. The
requirements of the Coastal Protection and Management Regulation 2017, administered by the
Department of Environment and Science (DES), is a separation of 1.5m. It is recommended
that this is reviewed.
3. Whilst there are no specific vessel dimensions mentioned in the referenced drawings, the town
planning report discusses in broad details 2x 5m vessels.
It is possible that one vessel would moor to the south and the second to the west which would
be inside the adjacent property allocation. Whilst this is clear of the navigation corridor, it may
impact current and future amenity access to the adjoining property. It is recommended that this
be considered by the assessment manager.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.