6.5.22 - Council meeting 19 April

of 16

Page text shows just the words. Original shows the document exactly as it was published.

0121345ÿ7899 11ÿ911 20ÿ9 2 1 ÿ                                                  ÿ435ÿÿ
ÿ
ÿ
    ÿ ÿÿ !ÿ"#ÿ$%&'ÿ
    ÿ ÿÿ()*ÿ+ ,-ÿ.****/ÿ-ÿ0  /ÿ1#'ÿÿ
    ÿ -#ÿ&ÿÿ&*)&ÿ&ÿ&)ÿÿ&2 ÿ *ÿ-ÿÿ !ÿ#'ÿ-ÿ
    3ÿ ÿÿ4)/ÿ&ÿ//)/ÿ56/ÿ/ÿÿ-&ÿ%&&ÿÿ#&ÿÿ
          ÿ&//&ÿ&)- 7ÿ&ÿÿ2&ÿ%&&ÿ&2 *ÿ
    !ÿ -#ÿ7ÿ))ÿÿ&)-ÿÿ8 #ÿ&)- *ÿ&ÿÿ*ÿ&ÿÿ) ÿ-#7ÿÿÿÿÿ
    #ÿ ##&9ÿÿ-2#&%ÿ-ÿ*ÿ%*2*ÿ&ÿ/ ÿÿ #&ÿ9ÿÿ
          :&2 ÿ. *ÿ&ÿ##ÿ;&*ÿ-)ÿÿÿ/  ÿ%&-ÿÿ
55ÿ"ÿ2&ÿ%&&ÿ&2 ÿ *ÿ9ÿ ÿ;&ÿ/)*ÿ*)#ÿÿÿ ÿ&ÿ&ÿ#**ÿ
     ÿÿ *ÿ-#-ÿ9ÿÿ<=>?@ABCÿ?EFÿGABHÿI@?EJÿKLMNOPIQQLÿRHSÿTÿ%% -ÿ7ÿ
    "&-ÿ:&*)#ÿU*ÿ-ÿ1&3ÿ0  *ÿ-ÿ*ÿ/--ÿ7ÿ&-&*ÿ&ÿ*ÿ
      %%&2#ÿ
56ÿVÿÿ%&2*&ÿ#)--ÿÿÿ&2 ÿ-&)/ÿ*ÿ4)*&-ÿ&ÿ)*-ÿ*&ÿ7ÿ
    ÿ#2ÿ#*ÿ)&7Wÿÿ*)*)ÿ%&2*&ÿ/)*ÿÿ#)--ÿÿÿ-&)/ÿ9ÿ
      *ÿ #7ÿ*ÿ%#ÿ--***ÿÿ&32ÿ*&)ÿ7ÿÿ4)*&-ÿ&ÿ)*-ÿ
    %&2*&ÿ"ÿ9&-ÿ&ÿÿ*)*)ÿ%&2*&ÿ/)*ÿÿ-ÿ7ÿ:&)#ÿ
      XYZ[\Zÿ
5]ÿ"ÿ-2#&%/ÿ*ÿ&ÿÿ*-ÿÿ&- ÿ9ÿÿ;&#7ÿ-ÿ$ÿ1#*ÿ65^_`a1bb5ÿ
    c2ÿ(ÿ%% -ÿ7ÿ"&-ÿ:&*)#ÿU*ÿ-ÿ1&3ÿ0  *ÿ-ÿ*ÿ/--ÿ7ÿ
    &-&*ÿ&ÿ*ÿ%%&2#ÿ9ÿ%&%&*-ÿ;&ÿ`ÿ4)ÿ #&ÿ&ÿÿ*##-ÿÿ
      &- ÿ9ÿÿd%& #ÿe&!*ÿ.%%&2#ÿ%&ÿ&ÿÿ* #ÿ&ÿÿ$)27ÿ1#ÿ&ÿ
    $ÿ5ÿ
5fÿ$ÿ6ÿ ÿ/)*ÿÿ/ -ÿ-ÿ/  -ÿ)#ÿ&///ÿ&ÿ$ÿ6ÿ&ÿ&ÿ)*ÿ
    2&/#ÿ/% *ÿ#)-ÿ)ÿ&ÿ#/-ÿ&ÿ&*&ÿ -ÿ*-/ÿ&&#Wÿ9-ÿ
    2*&ÿ&&#Wÿÿ/ &ÿ/ *)*ÿgÿ/&9ÿ**hÿ
    5Y\iÿ3jkYl[m[XYX[n\ÿ
5^ÿc #&ÿ9&!*ÿ/)*ÿÿ)-!ÿÿ &- ÿ9ÿÿ.%%&2-ÿo&ÿ
    0  /ÿ-ÿ:&2 ÿ. ÿc #&ÿ:&%ÿ%#ÿ-ÿÿ&- ÿ9ÿÿ
    d%& #ÿe&!*ÿ%%&2#ÿ-ÿÿp&&*ÿ1#ÿ6b6bÿ-ÿ1#ÿ$/ÿ1&#7ÿaÿ1$1ÿ6ÿ
    ; -*%ÿ9ÿÿ8%&ÿ&'ÿ
    5^5ÿÿ"ÿ#)*&ÿ&ÿ--& #ÿ/  ÿ*-)#ÿ4)/*ÿ9ÿÿo&ÿ
          0  /ÿ-ÿ:&2 ÿ. ÿc #&ÿ:&%ÿ%#ÿ#)-qÿ
          5^55ÿ e-ÿ/  /ÿ&ÿ/ ÿÿ9-ÿÿ,&ÿ&)-ÿ ÿ%#-ÿ
                      )*&!Wÿ/)#ÿ%#*/ÿ9ÿ4)-ÿe ÿ9ÿ4)-ÿ
          5^56ÿÿ "ÿ) -ÿ&ÿ*%*ÿ*)*%#ÿ&ÿ) ÿ- / ÿ
          5^5]ÿ c%#/ÿ&ÿ##ÿ- -ÿ)*&!ÿ
          5^5fÿÿ ]ÿ0&#7ÿg&ÿ*ÿ4)-hÿ9-ÿ/  ÿ9ÿÿ***-ÿ )#ÿ
                      &ÿ *ÿ
    5^6ÿ"ÿ#)*&ÿ&ÿ--& #ÿ #&ÿ1&/ ÿd32*ÿ#)-qÿ
          5^65ÿ c #&ÿ9&!*ÿ/)*ÿ/ÿÿ&##&9ÿ1&/ ÿ:ÿ&qÿ
                  ÿ r ÿdÿsÿ56ÿ/&*ÿÿ*##&tÿ
                      ÿ 1#-ÿ*ÿ 2ÿ2-ÿÿ2ÿÿ&ÿ5/ÿÿ
                      ÿ 1#-ÿ*)*ÿ 2ÿ2-ÿÿ2ÿÿ&ÿbf/ÿ
                ÿ r ÿ"9&ÿaÿ6fÿ/&*ÿÿÿ*##&qÿ


[OCR of page images]
GENERAL COMMITTEE MEETING MINUTES 19 APRIL 2022

 

11.

12.

13.

14.

15.

reference the Firebreak Trail Specification;

@

h. reference the Bushfire Hazard Assessment and Management Plan;
i. detail no fence construction to occur in covenant areas and fire break trail; and

j. reference the requirement for minimum 1.2m metre high dog proof fence along the
entire common boundary of the vegetation protection covenants.

k. detail any future fencing around the external boundaries of the site to be fauna friendly.

I. allow the developer and his representatives to maintain the rehabilitation within the
Covenant Areas on all Lots during the entire maintenance period.

The vegetation protection covenant areas within each Lot must result in an area of not less
than the areas detailed within the Locality and Site Plans 21598-P001 Rev B prepared by
Tod Consulting Engineers and Project Managers and as amended by conditions of this
approval.

If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.

Staging

The development is to be staged in accordance with the Locality and Site Plans 21598-P001
Rev B prepared by Tod Consulting Engineers and Project Managers and as amended by
conditions of this approval with proposed Lot 8 requiring rehabilitation to be installed in
accordance with an Operational Works Approval prior to the sealing of the Survey Plan for
Stage 1.

Stage 2 area must be maintained and managed until commencement of Stage 2 to not cause
environmental impacts including but not limited to erosion and sediment control, weed
invasion control, fire mitigation measures (e.g. mown grass).

Land Rehabilitation

Rehabilitation works must be undertaken in accordance with the Approved Vegetation
Management and Covenant Area Rehabilitation Concept plan and in accordance with an
Operational Works approval and the Noosa Plan 2020 and Planning Scheme Policy - PSP 2
Landscaping with the exception of;

15.1 The inclusion of additional maintenance schedule requirements within the Vegetation
Management and Covenant Area Rehabilitation Concept plan including:

15.1.1 Weed management to maintain a weed free zone around each planted
tubestock, mulch replenishment when required. Watering when required.

15.1.2 Tree guarding of species susceptible to fauna damage.

15.1.3 Replacement of all dead tubestock.

15.1.4 3 Monthly (or as required) weed maintenance within the assisted natural

regeneration areas.
15.2 The inclusion of additional rehabilitation Performance Objectives including:
15.2.1 Rehabilitation works must meet the following Performance Criteria for:
a. Year One — 12 months after installation:
i. Planted trees have achieved an average height of 1m.
ii. Planted shrubs have achieved an average height of 0.4m.

b. Year Two - 24 months after the installation:
Log in to download the original file

6.5.22 - Council meeting 19 April.pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗