Original source · versioned page text
Attachment G - Tectonic Addendum Letter
27 May 2021 Project No. 18151-003-Rev0 Doonella Street Pty Ltd C/- Project Urban Attention: Mr Mick Sheppard Email: [email protected] 30-32 DOONELLA STREET, TEWANTIN Dear Mick, As requested, an experienced geotechnical engineer from Tectonic (A. Davey) has reviewed civil design drawings prepared for a proposed commercial development at the above site by Alta Projects (Ref. A6035/21/L01 to W01 [20 sheets], various revisions and dates, latest being 25 May 2021). We advise that the recommendations of our geotechnical report (Ref. 18151-001-Rev0, dated 22 June 2018) remain appropriate for the proposed development. It is noted that our geotechnical advice regarding such measures as temporary batter slopes, sheet pile retention and drainage has been incorporated into the civil design. Your attention is drawn to the document Limitations, which is attached to this letter. We trust that this information meets your requirements. Please contact the undersigned should you wish to discuss any of the above matters. Yours faithfully TECTONIC GEOTECHNICAL PTY LTD Ashley Davey BEng (Geological) RPEQ 8159 Director/Principal Geotechnical Engineer Attachments: Limitations Tectonic Geotechnical Pty Ltd PO Box 899, Buderim, QLD 4556 Office: 07 5478 9016 Email: [email protected] www.tectonicgeo.com.au A.B.N. 83 165 727 828
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment G - Tectonic Addendum Letter.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.