OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
12 TRAFFIC MANAGEMENT
The management of traffic generated by the construction activities for this project will be in conjunction
with this CMP, WHSMP and EMP for the project.
The following sections previously covered within this CMP are proposed to have minimal impact on local
traffic and the public/pedestrians and will be continually monitored throughout the project. If a
requirement for traffic control of any kind is identified throughout the project a Guidance Scheme and
Traffic Control will be implemented as required to manage the issues.
Construction vehicle routes to & from the site.
Loading and unloading of vehicles.
Concrete Pours
Crane Lifting
Impact on traffic movement in the area.
Parking for Construction vehicles.
Woollam Constructions’ main objective will be to manage these activities to minimise or negate the impact
of the project on public roadways and pedestrian activity within and near the project.
These activities will continue to be reviewed and monitored, prior to and during the construction phase.
Woollam Constructions Page 11 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.