Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
MH
STREET
MH
COOYAR
MH
MH
MH
MH
H
MH
H
H
MH
MH
LOT 9
SP225312 MH
MH
H
MH
MH
MH
MH
H
MH
MH
MH
LOT 127
H
SP276620
MH
SES .
LEVEL DATU
ST
D
EXISTING SERVICES EXISTING LEVELS
D
Noo
LOT 128
SP276620
O
ST
D AS S A o
IN ASSO IATION WIT OOLLA CONSTRUCTIONS CIVIL D N A1
ST
o D J N 1 500 0 5 10 15 20 25
A PRELI INARY ISSUE HJD E 2 0 24 OZCARE NOOSA Jo N . D No. R o
THIS DRAWING IS COPYRIGHT © DO NOT
R D o B A D 80 COOYAR STREET, NOOSA HEADS E SCALE DRAWING ORIGINAL DRAWING IS A1
o
A o SIZE. THIS DRAWING IS NOT TO BE USED FOR STP24-0253 C 01 A
D T E CONSTRUCTION UNLESS THE APPROVED
A END ENTS SOIL EROSION SEDI ENT CONTROL - CONSTRUCTION PHASE SIGNATURE HAS BEEN ADDED. NOT FOR CONSTRUCTION
R E No.
D ST
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗