Original source · versioned page text
Apdx 3 - Civil Eng Plans
Plans and drawings: the text below has words only, no drawings.
Original PDF page 5, section 2. The text section number identifies this passage in the reader.
19.4
19.2
19.6
19
19.8
+ FSL 20.25
FFL 20.45
20.2
PIPES IN ACCORDANCE WITH
20
20.4
E(OH)
TW 21.70 + 21.48 FFL 20.45
+ H0.30
+ H0.20
+ H0.35
+ H1.30
20.6
+ H1.0
+ H0.8
+ H0.40
+ H0.10
20.8
Ø100 uPVC SN8
W
21.50 + + FSL 20.40 Ø100 uPVC SN8 IPWEAQ STD DRG RS-081
21
21
21
S
SW SW
.2
SW SW
S
SW SW 18.95
.4
21.41 SW SW SW SW SW SW SW
20.42 SW SW SW SW
20.05 19.86 SW
19.11
20.19 +
20.74 +
20.74 +
20.57 +
20.40 +
E(OH)
20.74
20.20 +
20.00 +
19.85 +
Nail in Kerb
1 2 3 MAX SITE DISCHARGE
W
18.98
PROPOSED POOL 3 3 3
S
S
18.97 14L/S AT 5% AEP
(BY OTHERS) PROPOSED POOL 19.12
E(OH)
PER KERB ADAPTER
PROPOSED STORMWATER AND SITE LEVEL LAYOUT (BY OTHERS)
125x75x3 RHS GALV RHS
SCALE 1:150 @ A3
221304-OPW-01-220519.DWG
SCALE APPROVAL ISSUE DATE DESCRIPTION BY CHKD DRAWING DETAILS PROJECT NUMBER
PROJECT CLIENT 1 19-05-22 FOR APPROVAL DTB DK
PROPOSED DUPLEX KUMAR MAHADEVAN 0 1.5 3.0 4.5 6.0 7.5m
.................
DATUM
DESIGN
AHD
DK
221304
23 CORAL TREE AVENUE NOOSA HEADS
DANIEL KENNA DRAWN DK SHEET ISSUE
TITLE SCALE 1:150 A3 (RPEQ 15522)
PROPOSED STORMWATER AND SITE LEVEL LAYOUT PLAN
e [email protected] ABN 99 642 485 363 This drawing is not to be copied or amended without written permission from DRAWING STATUS DESIGN CHECK DK C05 1
a PO Box 988 Maroochydore 4558 p 0404 157 187 Ingeniir Pty Ltd FOR APPROVAL DATE 19-05-22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.