Skip to the record
Every meeting, every word.

Council archive · source document

07/0557 - MCU - Multiple House Type 1 [As Published] · 132007.557

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

qm NEeeKw we Checklist - Applications Involving Land
on Development & Land Use Sections
IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

 

 

1. APPLICATIONFORMS ~~ cere 2 “)
4.1. Form1 PartA
1.1.1. Ensure that the form is fully completed. VM

 

 

 

1.1.2. In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1. If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form‘ Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.

2. REFERRAL INFORMATION, — 0 LT AI
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. [YZ]

3. ENVIRONMENTALLY RELEVANT ACTIVITIES. *__ ae SO

 

3.1. Ensure that Part G is completed if EPA referral is required.

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. “FORM 2’- REQUEST.TO CHANGE APPROVAL » ce ea

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

 

5. PLANS . my we oo , Se
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational 34
Works) accompanies the application. In addition ensure that each set is complete. ,
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is ~
unbound. J

woe - ” . nee

6. SUPPORTING INFORMATION a . . ar |

6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

7. FEE™ . - . Pe

7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

vw
7.2. Ensure that the fee which has been paid is recorded on the application form. 4

 

 

 

 

 

 

 

 

 

 

 

Receiving Officer ........ (£8 Mewes Rx segs eeeeeenenes Date AS] BI a) ee

Having completed this form and accepted the applidgtion, please deliver both to the following IDAS Application Receiving

trays:-

e  {f the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

e — {f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

*  {fthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2 in the
Land Development Section.

* Inail other circumstances —- AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ani\forms\application checklist.doc

 

 
Full text of the other 22 pages

Page 2

 

 

INTEGRATED PLANNING ACT 1997

 

 

The completion of afl apofica’

  

Description of land

Allland the subject of the appficaton, must be
identified. However, a description of the land is nat

required, and by one (1) or more other com
Any information requested in the form may be provi

1.

   
  

ns on Part A is mandatory for all applications. Part A must be accompanied by the COM
ipleted parts of the Form as required. For more Information on the parts of the Form fl
ded in an attachment to the application. For further information about completing the following

Street address: factudinghouse number, street name, suburtfocality name & postcode) {if applicable)
[22 dot Bnet Cons, Castor, £603 |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ERA 2. Name of water body or watercourse, within which the development is proposed: (if appicable)
see ae |. | |
is proy a or

watecourse, 3. Lot on plan description (eg. Lot 123 on RP 4567)/ GPS coordinates:
Advice for completing 03 - Most land can be
end ya on pn descrpbon, Toso deta | tog Ml oy &F &St3¢C _|
can be sind om ie doomonts rtrowmh Be | 4 The above description is for: (ck applicable box)
However, ifthe land on which the development is Wa the land on which the development is proposed; or
Grocer eS Bet nae an oe fie. (Gi) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
1 tha ton pen deer . C dil) the water body or watercourse.

“o Sater nd | oo ecton Bay). 5. Shop / tenancy number. 6. Storey / level: 7. Total area of land: (m? or ha):
Advice for completing Q7 - Q7 does ifthe
Ai casos | L ] L/ ~ [he > _|
(eitee ts Someta Oe oo aoa 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (f applicable)
re camemmmeman,| [weesa |

ents afea UNeSs

Local Government Act 1993,” 9. Port authority for the strategic port land or strategic port land tidal area on which the

for comeietng 2 poten ar etetogie development is proposed: (eg. Port of Brisbane, Port of Townsvile) (if applicable)
port land tidal area. For more details refer to Guide 1) [ |
Proposal details 10. Existing use of the land: eg. vacant, single house, shop efc.)
tna sinaiien con waitin eaismeyte | | Ky hie A$ (De Tipe

11. Proposed use of the land: (eg. 6 uni apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released Into waters etc).
[ Ry hin 06%; Dev fire. . |
Other applicable parts of Form 1 12, Other parts of Form 1 completed as part of this application: (eg. Part D, Part, etc)
tareletnd pata Farm 1 Forintrmatonebut L
orm 1. For

when a part of Form 4 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
srintnon/ atte he omer a ela [Mew AiCaed7 |) [4aetHiGeus7 |
When signing and todging this application 14. Contact number: 16. Facsimile number/e-mail address:

“The i ibid for ensuring the
Han poe scared Te se Li Sfe2 Gror | [nine [email protected]. We
manager, any referral & the Chi fi :
(whore appt) vty Of this information wien | 17. Postal address:
Te anpentisarmpert-acood ones (22 Wont tans Cover Correy, S63 |
must be shown, 18. Signature: 19. Date:

 

 

 

 

 

 

Page 3

 

 

INTEGRATED PLANNING ACT 1997

Land owner’s consent (if applicable}

Section 3,2,1{3) of tha IPA prescribes that an
‘@pplication must contain, or be supported by, the
writen of the land owners, if the applicafion
involves:

i) a material change of use;

{®) reconfiguration of a lot,

{@) work on land below high-water mark & not within a
canal as defined under the Coasta! Protection and
Management Act 1995;0r

(1) work on rail corridor land definéd under the
Transport Infrastructure Act 1994,

Section 3.8,1{2}{a) of the IPA provides that
tandowner’s consent is pot required for a mobile or
temporary ERA

For more information refer to Guide 4

     
   
      
     
   
   
   
   
   
   
   
   
     
  

Part A, Version 2.4, 29 May 2006-
20. Land owner's consent to the making of this application:

 

Signature

 

 

 

 

 

 

 

Resource entitlement (if applicable)
Section 3.2.1{5} of the IPA requires evidence of
resource entitlement be given for applications that
involve a prescribed State resource.
Section 3.2.1(10}(2)(i) of the IPA prescribes that an
application cannot be taken to be properly made
without evidence of the resource entitlement.

24 &.
Refer to schedule 10 of the Integrated Planning

Regulation 1998 that prescribes the nature of evidence]

required by the State in support of the lodging of this
development application.

Advice for completing 023

The information in (i) - (v) is mandatory if evidence is
fequired under Q22 (ji) of (ii) above.

The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where the
application involves any water or riverine quarry
material under the Water Act 2000.

Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used, Q23 (vi) must be
completed if the evidence is time limited.

Assessment triggers

This checklist does not apply if the application requires:

the completion of Pats A and B of the Form only. It
must be completed for all other applications.

21. Does this application involve a State resource prescribed under a regulation (other than involving

quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
LINO -90 to 024 (YES - goto. q22

This application is accompanied by evidence: (tick applicable bax)

C1 (i) of the allocation of, or entitlement to, the resource - attach evidence end go to 023(vi)

(Qi) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitement to, the resource - go
fo Q23

(iii) the chief executive of the department administering the resource is satisfied the

development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo Q23

 

23. Evidence of the resource entitlement:

. (i) Resource entitement / “te details
Name of a officer

Position of “ae officer
Signature of delegated officer

cs
Date

(vii) Official stamp of the department e@
administering the resource (if
applicable)

 

(ii)
(ii)
(iv)

(v)

(vi) Ce date of evidence —

Is the IDAS Assessment Checklist completed and attached to this application?

(Yes (CI NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made

 

 

 

24.

 

Plans/drawings/reports accompanying this application:

 

 

 

 

 

 

 

 

 

Plans | drawings | reports 25.
prlosorrepie pred sghes hor aba Plan / Drawing / Report Number Title Date
manager, referral agencies and any person viewing , .
the application during public scrutiny or pubic () e2-bD7J+-o “re.
nofficaton to understand the scope of the proposal veneer Ta Te ften ete ace perce rent entsrnnssasnsnerensccccces sco AD FC.
and any potential impact. (i)

(iii)

()
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A

and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable fo assessment manager's)

 

 

 

= DATE RECEIVING OFFICER'S "| REFERENCE _
[FEO 575 [| _ geceiven | 22/3/22 | ees 47 Sea 5 | Seow [o?/ss9 |
Notification of Engagement of Private Certifier (Optional tone}
To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

fof

Date of engagement:

Accreditation Number.

 

__ Name: Signature:

 

           
           
    
          
     
      
    
     
    
     
      
      

 

Page 4

 

 

 

INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004

    
   

Form 1 Development Application

 

Material change ofuse _ —

assessable against a local government’s planning scheme “

 

Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local govemments planning scheme.

 

Nature of the application 1. This application is for: (tick 1 or both ff applicable)
A development permit authorises [A Preliminary approval for a material change of use of premises including conceptual
Sole Sent hear a preity design for any associated works that require approval under the planning scheme (te.
and does not authorise development to oocur. ___ Sonsideration of the proposal concep)

AND/OR

{Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

The subject'land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)

For the definition of “ floor area” go to r

the planing scheme against which the [bot ft eu KPIS 47342 ]
application will be assessed.

 

3. Existing gross floor area: (i applicable) [ |

 

4. Are there any existing easements on the land?

[7.NO
(1 YES - attach plans of the location and details of the purpose of the easement

 

Material change of use details 5. Details of the change to the use of the land: (eg. vacant land fo shopping centre, house to Sspariment buiiding,
vacant land fo industry {tyre manufacturing} etc.)

| _|

6. Number of employees: [ : |

 

 

 

 

7. Operating days and hours: [ |

Associated building works details (if |g — Site cover. [t—‘“SSOCOCCCCCCSY

applicable) :

aganstwnich the appication willbe 10. Number of on-site car parking spaces: | ]
11. Number of storeys / maximum height above natura! ground:
12. Number of employees []

13. Hours and days the use will operate [ ‘|

Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.) °
{if applicable)

 

 

 

 

 

 

 

 

 

 

 

PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager}
DATE RECEIVED

 

REFERENCE
NUMBER/S

 

 

 

 

 

 

Page 5

 

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

VY Form 1 Development Application
IDAS Assessment
Checklist

(Formerly the “Referrals Checklist’)

    
 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checklist.was formerly referred to as the “Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Appfication Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council ete.).

3, This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant 10
determine the assessment manager’ for the application.

Therefore, the completion of al questions i in section 1 of this checklistis mandatory for all applications (other than those requinng the completion of Parts A & B only). -
{tis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identity |
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the .

application triggers referral coordination?. |
9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.gld.gov.au. Guide 25 explains the role of the IDAS

Assessment Checkfist in the IDAS application process, and its relationship to the Ferm 1 development application.

|
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from |

 

SNA

www.ipa.qid.gov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006:

 

 

‘SECTION 1- STATE ASSESSMENT. (completion mandatory) _

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006. .

 

 

 

 

 

Environmentally relevant activity 1. The application involves: {tick applicable box/es)
For more information refer to Guided. (14) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered ‘none ofthe above o Ot, has not been made - complete Part G of Form 1

1 application requires assessment by ihe - a. . . .
admbotern authority? C1 (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than,the administering Made - complete Part G of Form 1
authority, is thé assessmeht manager for the iii none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Nate: An application involving ERA 19 and/or 20
will also require Completion of Part Ks of Form 1
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf ©

 

PLEASE NOTE: © The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable fo assessment manager)
DATE RECEIVED * REFERENCE NUMBERIS, ©

 

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application i is prescribed in schedule 8A of the IPA.

2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?"

3° The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devoived ERA) of the Queensland Deparment of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

 

 

Page 6

 

 

INTEGRATED PLANNING ACT 1997

State-controlled road matters

For more information refer to Guide 3.

Unless you answered “none of the above” to 02,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.

in cerlain circumstances DMR will be an advice
agency, while In other circumstances DMR wil
be a concurrence agency.

Schedule 2 of the IP Requlation wit! assist you to
determine where DMR is an advice or
concurrence agency for the application.

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves: {tick appicable boxes)
C1 (i) development on land contiguous" to a State controlled road and for -
(J (a) material change of use assessable against the planning scheme;
(1 (b) reconfiguring a fot unless -
+ the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
C1 (¢) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
« associated with access to a State-controlied road; or
+ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

. CO fii) development on tand not contiguous to a State-controlled road and -

(1 (a) material change of use -
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the 1P Regulation and exceeding the thresholds set by
that schedule;
( (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule:
(CO) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}—
+ assessable against the locat government's planning scheme; and
» mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule. .

OH) none of the above

 

Clearing vegetation

For more information refer to Guide 12.

Unless you answered “none of the above” to Q3,
the application requires assessment by the
Oepartment of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manaoer for the anolicatian, NRW is 2

to this matter.

If you licked Q3{i) or (il), your apptication requires:
fefesral to NRW for assessment regardiess of
whether vegetation clearing is proposed or not.

The application involves: (tick applicable boxes)
(1) material change of use -
: (a) assessable against the planning scheme;
(b} on a lot containing -

* a category 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if thara is nn nennarty man of accaceahle vanatatian fnr tha lat . ramnant uonatatian:

AYP TS tre Carney Gee Or Ue FUT I FUT UF COUTIGING! U9G, an

{d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 4

reconfiguring a lot - ;

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger,

(c) where 2 or more lots are created; and

{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

{b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a fot mentioned in (ii) - complete Part J of
Form 4

wi (iv) none of the above.

Odi)

Diiy

 

Strategic port land

For more information refer to Guide 11.

if you ticked (i) - the relevant Port Authority is the
assessmeni manager for the application.

Hf you ticked (ii) Queensland Transport is a
concurrence agency for ihe application.

 

The application involves:
C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part t of Form 1

O (ii) a material change of use that is inconsistent with the land use plan approved under the
Ti Act for the strategic port land - complete Part | of Form 1

(iii) none of the above

 

 

4 Land contiguous to a State-convolied road is defined in schedule 14 of the IP Reguiation to mean land - if part of the land is within 100m of the State-controtled toad; or that is part of a future Stata

controtled road.

 

Page 2

 

 

 

 

Page 7

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007
Acid sulfate soils 5. The application involves development on land situated in an identified’ local government area
For more information refer to Guide 10, and where the surface of the land is: (tick appiicable box)
Untess you answered “none of the above" to 05, [1 @) below 20m AHDS and the development will involve the excavation of 1000m? or more of
Deoarnenl Netra Resaunes an Water oor can aes sessment by soil or sediment at or below 5m AHD, or
(NRW), LC @i) at or below 5m AHD and the development will involve filling the site with 100m? or more

 

- Ita agency olhes than NRW is the 48séserient
: Manager for the application, NRW Is an advice
{agency for the’ ‘application | In relation to this
matter,” rt

of material
hati) none of the above

 

major hazard facilities - -
For more information refer to Guide 17. ~
Ht you answered "YES" to Q6, the application
"requires assessment by the Department of
Emergéhcy Services (DES).
tf an agency other tha DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
+ felation to this matter,

 

Water Act 2000-

For more information about items (a) ~ (f}, refer

to Guide 1§,+ For méré-information about item
49), refer to Guide'14 Does my application ,;

involve assessment of a referable dam?

Unless you answered “none of the above’ to Q7,

thé application requires assessment by the

Department of Natural Resources and Water

{NRW).

if an agency other than NRW is the assessment

manager for the application, NRW is a

concurrence agency for the application in

relation to this matter.

Major hazard facilities. or possible 6.

Water relatéd development under the |7,

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

IUAo

(YES - complete Part £ of Form 1

The application involves:

[i operational work, for taking or interfering with water under the Water Act 2000, that is:

(tick applicable box/es)

(2) ina watercourse, take or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ks, Ks, or Ke of Form 1 whichever is applicable,

(J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part

. K; of Form 1; .

(1 (0) fora subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
USe - complete Part Ks of Form 1;

(2 qd) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part Ks of Form 1;

(1 (e) for taking overland flow water in certain areas covered by a water resource plan
~ complete Part Ks of Form 1;

(1 (f)_ for interfering with overland flow water in a drainage and embankment area -
complete Part Ky of Form 1

(9) for constructing a referable dam? or works that will increase the storage capacity
of areferable dam by more than 10% - completa Part Ks of Form’t; OF

none of the above.

 

watercourse -
For more information refer to Guide 16.

If you answered "YES" to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
retation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse Is also an
Environmentaily Relevant Activity (ERA).

 

Removal of quarry material from a 8.

Does the application involve development for the removal of quairy material from a watercourse?
tequiring an allocation notice under the Water Act 2000?

}O
(17 YES - complete Parts Ky and G of Form 1

 

6 Austratian Height Datum (AHD).

8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.

 

7 The declared ground water areas are listed in Guide’13 Development in 3 declared catchment area,

§ The entifed local goverment areas are: Aunskun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Calms, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Doungias, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tlaso, Torres, Townsville, Whitsunday.

Page 3

 

Page 8

 

INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tida! areas refer to Guide 24.
Unless you answered “none of the above’ to 09,
the application requires assessment by the
Environmental Protection Agency (EPA}.

If an agency other than EPA is the assessment
manager for the application, EPA Is a
concurtence agency for the application in
elation to this matter.

Loca! government is the assessment manages
for af prescribed tidal work.

   

   
 

IDAS Assessment Checklist, Version 19.0, 2 March 2007
9. The application involves operational work that is: ( tick the applicable box/es)

(1) {i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
Dw

tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; of
Diii)

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form t if any box/es {a} to (i) below are ticked.

[1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal? intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal fand above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

Tfemoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

Ob)
“Do
Ow:
Oe)
Dg”
O@)

Dt)
OF

zo

 

Operational work below high water
mark
For more informdlion refer to Guide 18. For
more Information about prescribed tidal work In
local government tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to

ng ransport Mari fe
Qid) as a concurrence agency. .
Local government is the assessrnent manager
for all prescribed tidal work.

 

10. The-application involves operational work that is: ( tick the applicable box/es)

(1 (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 {the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; 0f
O (iii) carried out within a coastal management district'S under the Coastal Act and for -
(1) disposing of dredge spoil or other solid waste material in tidal water — complete Part

Mof Form 1;
(1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
Oe

constructing a canal'2, if the canal is associated with reconfiguring a lot - comptete"

Dart 8b al Caren 1°

MZ) (IV) None oF Ine apove.

 

Coastal management

For more information refer to Guide 18,

Untess you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
Fetation (o this matter.

 

11. The application involves: (tick the applicable box/es)

C1 (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's

OO (ii) a material change of use assessable under a planning scheme involving building
work, cartied out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA" of at least 1000m?
+ the enlargement of the GFA of existing premises by more.than 1000m2

D1 (ii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

CI (iv) reconfiguring a lot"? assessable under schedule 8 of the IPA and in connection with

the construction of a canal? - complete Part M of Form
none of the above

Hw

 

10 Tidal work is defined In sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Reguiation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work Is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local govemment tidal area.

15 Coastal management district Is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and. Management Act 1995, other than an area dectared as a
coastal management district under section 47(2) of that Act. .

16 GFA is defined in sch 14 of the IPA tp mean the gross floor area. For a definition of how to calculaied GFA, go to the planning scheme against which the application is being assessed.

17 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an avtificial waterway, must be
‘accompanied by the application for the operational works to construct the artificial waterway.

Page 4

 

 

  
   
       
        
        
        
       
        
  
  
       
  
 
       
      
        
    
      
        
           
      
        
   

 

Page 9

 

 

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

thformation about prescribed tidal work refer to

ide 24, .

If you answered "YES" to Q12, the application -

triggers referral to the Port Authority. oe

“The Port Author iys aconourence agency he

_ development is-

“© within 200r of a shipping channel or an éntty
and exit shipping Corridor for the port

© within 1000m of a swing basin, a commercial
shipping wharf, a snoring, anchorage or spoil
grounds, . :

© within 1000m of a. panned port facility ”
identified in a land use plan approved under
the Transport infrastructure Act 1994,

in all other situation the Port Authority is an

advice agency. .

yoy ve

Marinas”
For more information refer to Guide'18, For
information about whether a marina is prescribed
tidat work refer to Guide 24.. The local’ - p,
governtrient is the assessment manager fori all
prescribed tidat work.”

{f you answered “YES* to 013, the application
triggers referral to Queensland ‘te and Rescue,
; Senvice 88 an advice agency. ca

12.

113.

IDAS Assessment Checklist, Version 19.0, 2 March 2007

Does the application involve development below high water mark’? and withiri the limits of a port
on the Transport Infrastructure Act 19942

NO.
(1 YES - complete Pat M of Form 1, or Part P of Form 1 if the work is prescribed tidal work”

Does the application involve operational work thal is tidal work for a marina’® with more e than 6
vessel berths? :

NO .
(71 YES - complete Part M of Form 1, or Part P of Farm 1 if the tidal work is prescribed tidal work

 

 

4,

Dogs the application involve tidat works within a strategic port land tidal area20?

 

 

Tidal works in strategic port land tidal} 4

areas NO

For mote information refer to Guide 8 Cyes- complete Part M of Form 1

Unless you answered "NO" to Q14, the relevant .

Port Authority is the assessment manager for the

application and the Environmental Protection

Agency (EPA) and Queenstand Transport (QT)

aré concurrence agencies for the application, ve

Heritage 15. Does the application invalve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?

Ifyou answered “YES" to ots, the application no

triggers referral to the .

Councit as concurrence ueei for the (YES - complete Part C of Form 1

application. .

Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and

For more information, including a list of the
declared catchment areas wilhin Queensland,
refer to Guide 13.

Unless you answered “none of the above" to
Q16, the appiication requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment |
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

 

involves: (tick the applicable box/es)
(1 (i) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;

(1 (i) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
TMi :

none of the above

 

18 High water mark is defined in tha Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regutation 1995,
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 10

 

INTEGRATED PLANNING ACT 1997
Contaminated land

Applications involving material change of use
and! or reconfiguring alot may tigger this
referral.

For more information refer to Guide 5.

Unless you answered "none of the above" to
‘Q17, the application requires assessment by the
Environmental Protection Agency {EPA).1f an
agency alher than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
felation to this matter.

17. The application involves: (tick the applicable box/es)

IDAS Assessment Checklist, Version 19.0, 2 March 2007

C1 (i) reconfiguring a fot for. which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2-
« item 5, including the exemption otherwise provided for by paragraph (d);
+ item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum -
activity; or
(b) in an area for which an area management advice has been ngiven for unexploded
ordnance - complete Part N of Form 4

Cl (ii) a material change of use -
{a) made assessable under the. IPA, schedule 8, part 1, table 2, items 5 to 7; or

{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

cyt none of the above

 

 

 

 

Etectricity infrastructure

For more information refer to schedule 2of the IP
Requtation.

Unless you answered "none of the above” to
Q18, the application triggers referral fo the

agency to which the easement is qranted in

favour of as advice agency.

18.

The application involves: (tick the applicable box/es)

C1 (i) reconfiguring a fot where any part of the lot is ~ .

* subject to dn easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply rietwork under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if —

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against,a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

SCH

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring alot, if-

Oiti

Diy

   

Arte nnd “film nen etinns te

 

HaHONNoIVI GHUY UNUGI WIG CICLUILIY AGC 1994 att IIe WOIK IS 10Caled WNOIY OF pany in
the easement;
the work is located wholly or partly within 10m of a substation site;

ww none of the above.

 

 

Land designated for community
infrastructure

Applications involving devetopment on land
designated for community infrastructure may
\rigger this referral.

For more information refer to schedule 2 of the
IP Regulation,

* Ifyou answered “YES" to 019, the application
fequires assessment by the chief executive of
the department administering the Act authorising
the development for the designaled purpose.

If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

19.

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

{i) intended to be supplied by a public sector entity; and
(i) on land not owned by or on behalf of the State; and
(iii) other than development —

(a) for the designated purpose; or

) carried out by, or on behalf of, the designator.
¢YNO

C1 Yes

 

 

 

 

Page 11

 

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
(P Requtation. /
Refer to Chapter 2, parl SA and schedule 10 of

_ the Sntegrated Planning Act 1997, and schedule

2 of the Regulatory Provisions for relevant
definitions,

Unless you answered ‘none of the above’
Q20, the application requires assessment by the
Office of Urban Management (OUM).

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007

20. The application involves (tick appicable box/es} -
0 i) amaterial change of use of premises -

(a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(1 inanarea included in a structure plan where the IPA, section 3.1. 6
applies;
(1 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
¢ impact assessment is required under the relevant planning scheme

(1 (ii) . intensive animal husbandry, or
LD (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
4 {ii residential development involving a rural residential purpose and not
specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in-section 2.8(2);

(d) in the Investigation Area for —
(1 (i) anurban activity and not specified in section 2.10(2);

L (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or

LJ (il) intensive animal husbandry

C1 (ii) reconfiguring a lot-

ds

iii) none of the above

On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2),

 

Fisheries matters

For more information refer to schedule 2of the |P
Requtation. .

Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Elsherles

, (DPI&F).

If an agency other than DPI&F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
relation fo itams (i) — (iv) and an advice agency
In relation to item (v).

 

21,

The application involves: (tick the applicable box/es)

Oi
O (i)

Diii)
Ow
Ow

au

an assessable material change of use for aquaculture - complete Part O; of Form 1;

assessable operational work that is the construction or raising of a waterway barrier -
complete’ Part Os of Form 1;

assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1, .

assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

none of the above.

 

Page?

 

Page 12

 

INTEGRATED PLANNING ACT 1997
Integration of fand use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
Application triggers referral to QT as a
concurrence agency.

 

: IDAS Assessment Checklist, Version 19.0, 2 March 2007
22. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
~ schedule.

C1 (il) reconfiguring a tot—

La) ‘on land that is completely or partly within a public transport corridor, and the
total number of lots increases; :

(1) (b) on land that is completely or partly within a future public transport corridor or

: an airport's public safety area;

(J (©) onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1d) fora residential purpose within the 25 ANEF contour for an airport;

LI (e) for a residential purpose resulting in 100 or more allotments.

C1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

[1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) _ will result in work that encroaches into an airport's operational airspace.

wn

none of the above.

 

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the |P Requiation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.

Moonie to Brisbane pipeline

For more information refer to schedule 2et the IP
Requtation.

Unless you answered “none of he above’, the
application triggers referral to the holder of
Pipeline licence No 1 issued under the Petraleum
Act 1923, currently Santos QNT Pty Lid, for
advice,

 

23, The application involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

O (ii) reconfiguring a lot—

(J (a) on tand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1) (b) on and that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

C(c) on tand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

*  fand and an easement abutting the corndor or tuture railway land is created;

Ce) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

C1 (f) for a residential purpose resulting in 100 or more allotments.

(C (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m°, on land that—

C1 (a) is completely or partly within rail corridor land or commercial corridor land, and

the work is not for rail transport infrastructure or other rail infrastructure;
[1 (b) _ is completely or partly within future railway land, or a railway tunnel easement; @
(J (c) abuts rail corridor land, commercial corridor tand or future railway land, and

the work is within 25m of the railway boundary.
in none of the above.

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure ar work will be located wholly or partly in the
easement.

OO (ii) reconfiguring a tot

(1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

{iv) none of the above.

 

 

 

 

 

Page 13

 

INTEGRATED PLANNING. ACT 1997
Koala habitat area . .
For more information, refer to Guide 26 and
schedule 2 of the {P Regutation.

Unless fou answered “néhe of the above", the
application requires referral to the Environmental
Protection Agency as:a concurrence agency.

 

 

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007

25. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use of premises in a koala ‘conservation area or koala
sustainability drea made assessable under a planning scheme, that is not for a domestic
activity and will result in -

(a) clearing of native vegetation over an area greater than 2500m?;

(1 () anew building and any reasonably associated structure with a total footprint
greater than 1000m?;

LD (ec) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than: 1000m2,

(2) extracting gravel, rock or sand from an area greater than 5000m?;

[1 (e). excavating or filling an area greater than 5000m2;

(1 (f). additional traffic in a koala conservation area or koala sustainability ; area,

between 6p.m. on a day and 6a.m. on the following day.

Oi) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -

(] (a) an increased number of lots;
(1 (b) clearing of native vegetation over an area greater than 2500m?.

C1 (iti) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

Co (wv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (ii) above) that i is not for a domestic activity
and will result in -

‘(1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m?;

, [1 (c) excavating or filing an area greater than 5000m?.
wm none of the above.

 

Wild river area
For more information, refer to Guide 27,

tf you answered YES to Q26, you must also
complete section 2 of this checklist. This will
sable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
“Wild Rivers Code, or if the proposed
development fs “prohibited” in a wild fiver area.

Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act

we
NO

C1 Yes

 

Referral coordination

An information request requires referral
coordination if the application involves —
(i) Sor more concurrence agencies; or
(ii). a facility or area assessable under a
“ ‘planning scheme and prescribed in
Schedule? or 8 of the IP Regulation; or
(iii) development which is.subject to an
application for preliminary approval
mentioned in s3.1.6 of the PA.

For more information go to Guide 2 and Guide 6.

27. Doeg/the application trigger referral coordination?
ro
(J YES, as the application: (tick the applicable box/es)

(1 (i) _ triggers 3 or more concurrence agencies;

CJ (ii) “involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

O{iti) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under-a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;

LA (iv) is for a preliminary approval mentioned in $3.1:6 of the IPA

 

Referral agency responses prior to
lodgement

Under s3.3,2 of IPA a referrat agency may give @
referral agency response on a matter within its
jurisdiction about a proposal before an
application for the proposal is made to the
assessment manager.

_ This is commonly the case where an application.
fequires referral to a building referral agency (eg.
Olt Fire and Rescue Service).

 

28. Did areferral agency give a referral agency response under s3.3.2 of the IPA before the
no was made to the assessment manager?

NO
LI YES - attach a copy of the referral agency/s response/s

 

Page 9

 

 

Page 14

 

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

' SECTION 2 - ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)

 

suns

 

Wild River Area

tt the responsibility of the applicant to
determine if the development is proposed In
awildriverarea,  ~

Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.now.qid.gov.au or
contacting the department by email on: .
wild [email protected]

Note on Referrals

Referrals for development in a wild siver area
{other than for agricultural activities and animal
husbandry activities) are not changed from the
existing referrat arrangements.

Notes on development assessable
against the Wild Rivers Code

For Information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27. The relevant wild siver
declaration will provide Information regarding
which types of development must be assessed
against the Wild Rivers Code, andinsome =
cases which types of development are exempt
from wild river requirements.

The notes on development assessable agains!
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas, The refevant
declaration will provide the information applying
to each wild river area,

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for devetopment activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant

Environmentally relevant activities
(ERAs) in a designated urban area

lf you answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no ather aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.

If you answered NO to Q2, ptease complete the
temaining questions in Section 2.

1.

2.

Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the appicable box/es}
(Ji) a high preservation area (HPA); |

[Jil a preservation area (PA) ;

(iii) a wild river floodplain management area (FMA);

(J iv) awild river nominated waterway;

(J v) a designated urban area (DUA).

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild. river declaration)?

i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
LJ no. [7] YES (ensure you have completed Part G of Form 1)

 

~ Clearing native vegetation

IF YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.

 |FYES and you ticked 04 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked 4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river cequirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions

 

in Section 2.

\s the application operational work for clearing native vegetation in a HPA?
O NO oO YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

LC) i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

CO ii) ina HPA outside a registered area of agriculture?

 

 

 

 

 

Page 15

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

It you answered YES to O5, and ticked any ~

boxes in (6), your application is required to be

assessed against and must comply wilh the Wid
» Rivers-Code.

iyo anseeted YES to OS and tied bax} in :
Q6; your application is required toba referred to
the EPA.

Note: If specified works are proposed in a locat

. govemment area, itis prescribed tidal work - the
felevant locat govemment will be the
assessment manager with the EPA as a
concurrence agency

tf you answered YES to Q5, and ticked box ii) or

if) in 06, your application requires refetral to
DPIF.

if you answered NO.to Q5 and.ticked box j} in
Q6, the application will not be accepted.

if you answered-NO to O85, ticked box ii}in O6
and the development Is necessary to Instalt
authorised works or infrastructure where a”
development permit is not fequired, or if a
required permit is held, the application must be
assessed against and must comply with the Wild.
Rivers Code. Apptications for purposes other”
than specified works or as described above will”
not be accepted.
If you answered NO at Q5 and ticked box fil) In
Q6, the appiicalion may be made if the works are
ina PA. These applications must be assessed

~ against and must comply withthe Wild Rivers
Code. The application will ndt be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

JNO (CJ yes

The application is for one or more of the following:

(J i) Operationat works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1), OF

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Past O2 of Form 1); OF

Oo iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

Residential, commercial or industrial
development

tf you answered YES to Q7, your application Is
not subject to wild river requirements. Provided
there are no other aspects of this development
ihat require assessment against the relevant wild
diver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q? and ticked either box
i) or il} in Q8, the assessing agency ts the
relevant focal government. The application must
be assessed againsi and must comply wilh the
Wild Rivers Code.

ls the application for residential, commercial or industrial development in a designated urban

area?
(no (yes

If NO, does the application for residential, commercial or industrial development involve:

Ol i} a material change of use made assessable in a local government planning scheme
9g
(ensure you have completed Part D of Form 4); or

(J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

If you answered YES to Q9 your application
Tequires assessment against and must comply
with the Witd Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if propased in a
HPA. For more details and 3 definition of animat
husbandry aclivities see the Wild Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

Dno -L1 YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

tf you answered YES to Q10, your application
fequires assessment agains! and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
2. .

The production of fodder in a PA, and pasture
improvement using tow impact sdil disturbance
techniques is not an agricuitural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2006) in
a PA?

LJno

If YES is the application for.
[J i) 2 material change of use; or
(2 ii) operational works.

: oO YES {ensure you have completed Part Q of Form 1)

 

 

 

Page 11

Page 16

 

 

 

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that lake overland flow water are either
self assessable of assessable, of are exempt
from wild river requirements.
If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
- and must comply with ihe coda.
if you ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
‘is required and must be assessed by NRW
against the relevant part of the Wild Rivers Coda
and must comply with the code.
Mf you ticked Q13 iii) your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, selt-assessable or
exempt will not be accepted,

13.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

LJ No CI YES (ensure you have completed Part Ks of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
(J ii) self-assessable works

- Lit) exempt works

 

Works that interfere with overland
flow water

‘The relevant wild river declaration will state
works thal interfere with overland flow water that
are either self assessable, assessable of exempt
from wild river requirements,

If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked (15 ji) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable devetopment for which an application
Is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code,

If you ticked Q15 iii) your application is not
subject to wild river requirements.

_ Applications for development that Is other than
that stated to be assessable, self-assessable or
exempt will not be accepted,

Does the application involve works that interfere with overland flow water in a FMA?
CI] No LI YES (ensure you have completed the relevant Part K of Form 1}

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
(J ii) self-assessable works

(iil) exempt works , : @

 

Applications for building or raising waterway
barrier works in a HPA will not be accepied.
Ifyou answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

on - - ‘ 1

oO NO oO) YES {ensure you have completed Part O3 of Form 1) |

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be | .

accepted,

Wf you answered YES to Q17, your application
* must be assessed by DPIF against the Wild

Rivers Code and must comply with the code,

17,

Does the application involve aquaculture in a PA?
(no (71 YES (ensure you have completed Part O; of Form 1)

 

Works that interfere with water in a
watercourse

Note: if the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways,
If you ticked box ii} in Q19, your application will
nol be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
tiver requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website

www nnw.qid.qov.au or contacting the
department by email on:

wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

me) (J Yes (ensure you have completed the relavant Part K of Form 1)

If YES,
Oo i) The application is for an instream dam or weir; or

1
(1 ii) The application is for operational works that interfere with water ina watercourse, and is |
for development other than a dam or weir. |

'

 

 

 

 

Page 17

 

INTEGRATED PLANNING ACT 1997

Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved fo DPIF, NRW .or delegated
focal goverment (see EPA website for more
~ information on devolved ERAS).
iF you answered NO to 020 you do not need to 1
complete Os 21-24, =

If you answered YES to 020 and the ‘
development is in a PA, your application must be
assessed by the administering authority??

_ against the Widd Rivers Code and must comply

"with the code, unless the proposal is for
development where an application will nal be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for he development by answering Q2t - Q24.
If you answered NO to Q21, you do riot need fo
complete 22.: If you answered YES to Q21 you
are required to complete 022.

If you answered NO to Q22, the application will

Nat be accepted.’ If you answered YES to Q22;

“" the ‘application must be assessed by NRW
agalnst the Wild Rivers Code and must comply
with the code.

If you answered NO to 023 and the development
Is propesed in the HPA the apptication will not be
accepted. Ifyou answered YES to 023, the
application must be ‘assessed by the EPA oF
NRW (2s prescribed in schedule BA of the IPA)
agairist the Wiki Rivers Code and must comply

- with the code.

_ lf you ariswered YES to 024 the application will
not be accepted. If you answered NO to 024,
your application must be assessed by NRW
against the Wid Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

(fthe development is proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with lhe
Wild Rivers Code (other than exempt ERAs in a
designated urban area).

 

20.

21.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Dees the application involve an ERA?

Oo NO Oo YES (ensure you have completed Part G of Form1)

ls the application for an ERA 20 instream?

(no Dyves

. Is a quarry allocation notice held for the proposed ERA 20 instream?

[ino - Dyes

. Does the application involve any of the following in a HPA?

i} a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)

i) Low inipact ERA 20 (out of stream) for specified works or a residential complex (as defined i in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

LJno CyYes

. Is the proposed development for ERA 20 (out of stream) and;

— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.

(Jno ‘Dyes

 

‘Documentation

if you answered NO to Q25, your application

may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

Lno LyYes

 

2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 13

Page 18

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

SECTION 3 ~ BUILDING REFERRALS (completion not mandatory)

 

Below is a list of the'referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

Special fire services - generally 1.
For more information go to schedule 2 table 1 and
schedule 2A of the IP Reaulation. :
Assessment period 15 days. No response is 2
deemed refusal.

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia. .

 

-| Fire safety for budget accommodation | 2.
For more informnation go to schedule 2 of the {P
Regulation .

«the subject of the application requires the installation of a fire safety system for a budget accommodation

An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work

building. ‘

 

Spray painting . “43.
For moxe information go to schedule 2 of the IP
Regulation .

An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
if the application involves a workplace incorporating spray painting. .

 

Retail meat premises 4.
For more information go to schedule 2 of the (P
Requlation

An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
retail meat premises,

 

Private health facitities 5.
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Health as a concurrence agency if the application
involves a private health facility.

 

Workplace area less than 2.3m? 6.
For more information go to schedule 2 of the IP.
Requiation

An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
application involves a work place area less that 2.3m?.

 

Land contiguous to a State-controlled | 7.
road

For more information go to schedule 2 of the IP
Requiatlon

An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
agency if the application involves land contiguous to a State-controlled road,

 

Pastoral workers accommodation 8,
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency
if the application involves pastoral workers accommodation.

 

Child care centre 9,
For more information go to schedule 2 of the IP
Regulation

An application may trigger referral to the Department of Communities as a concurrence agency if the
application involves a childcare centre. : .

 

Coastal development 10.
For more information go to schedule 2 of the IP
Requtation

tree on
For mare information go to schedule 2 of the |P
Regulation

An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
if the application involves land completely or partly seaward of a coastal building line22,

AU GYpHLaUUH Inay WYyYyel IeeliAt 1 Wie Mellage LOUNCI! as a Concurrence agency It the application
involves a heritage registered place.

 

Fisheries matters 12.
For more information go to schedule 2 of the IP
Requtation

- habitat area.

An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
concurrence agency if the application involves assessable building work in a declared fish habitat area; or
as an advice agency if the application involves assessable building work on tand that adjoins a declared fish

 

(Integration of land use and public 13,
transport

For more information go to schedule 2 of the (P
Regulation

An application may trigger referral to Queensland Transport as a concurrence agency if the application’
involves existing or future public transport corridors, or airport operational airspace?3.

 

 

Railway safety and efficiency 14,
For more information go to schedule 2 of the IP
Regulation

 

An application may trigger referral to Queenstand Transport as a concurrence agency if the application
involves future railway land.

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For alt
other applications the assessment period is 15 days. If no response is received from the local goverment for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no

_ Tesponse is taken to be a deemed approval,

 

 

Amenity and aesthetic impact of 15.
particutar building work for single
detached class 1 building or class 10
building or structure

For more information go to schedule 2 table 1 of the
IP Regulation.”

Assessment period 15 days. No response is a
deemed approval.

 

An application will trigger a referral to the local government if it is :
* fora single detached class 1 building or class 10 structure; and
the local government has declared by resolution the following:
— the appearance of the building or structure will have an extremely adverse impact on the amenity of
the locality; and :
— the appearance of the building or structure would be in extreme conflict with the character of the
locality. :

 

 

 

” Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
Operational airspace is as defined in State Planning Policy 1/02 "Development in the Viclnity of Certain Airports and Aviation Facilities".

Page 14

 

 
  

   
   
 
         

    

 

 
 

     
    
    
    
 

   
     
     
    
         
  
    
      
        
      
      
     
     
       
 
    
      

 

Page 19

 

.

 

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

 

 

 

 

 

 

designated rainwater tank area

For more information 90 to schedute 2 table 1 of the
and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal,

 

INTEGRATED PLANNING ACT 1997 :

Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.

For more information go to schedule 2 table 4 of the : .
| Assessment pertod 15 days. No response is a

deemed refisal.

Design, and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For thoce b tion go fo sree 2 bbls 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
IP Reauiaton. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period.5 days. No response Is @ ‘ does not comply with the qualitative statement for building clearance and site. cover:

deemed refusal,“ * « : 19, An application may trigger referral to the focal government as the concurrence agency if the building work

does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
ve, -Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
Accommodation buildings’. building will comply with the fire safety standard under the Building Act 1975 when the building work has
For mi tration goto schedule 2 table forthe: been completed.
AP Requlation.

Assessment period 15 days.” No response is a *

deemed refusal. .

Higher risk personal appearance “124, An application may trigger referral to the local government as the concurrence agency to determine if the
services building work

For mofe infarmation go to schedule? table’1 of the * complies with the performance criteria of the Queensland Development code part 15; and

IP Redutaton and the QDC part 15. ¢ the work does not comply with an acceptable solution stated in the part.

Assessment periad : 45 days. ‘No response ba .

deemed refusall., : .

Building work for residential service {22. An application for building work for premises in which residential care service under the Residential

For more information §o to schedule 2iable tof the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

JP Requtation and the QDC part 20. teferral to the local government as the concurrence agency.

Assessment period 15 days. No response is a .

deemed refusal, .

Building work for removal or 23. An application for the removat and/or rebuilding at another site of a building or other structure, will trigger
rebuilding - teferrat to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

IP Regutation.

Assessment period 5 days. No response is a

deemed refusal,

Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

© Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

© Under the Queensland Development Code, part 25, the. rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 15

 

Page 20

 

 

 

 

 

 

 

 

 

; [COMMENTS 1,
Des Ig ned for General notes: All construction shall conform
. > ae . \
— N3 Wind Loads a oe odes Code of Australia and ail relevant
we ene Existing. 7

 

   

 

Termite treatment: In accordance with AS 3660
Trusses: Prefabricated trusses at 900c/s. Erect,
tie down and brace trusses in accordance

with truss manufacturers spec's.

Battens:

38 x 75 F14 at 900c/s - fix with 1/75 x

No.14 Type 17 screws to every support.

Roof Beams:

RB1: 195 x 65 Hynebeam 17C

RB2: 260 x 85 Hynebeam 17C

 

 

 

 

 

 

 
  
  

SNRRoPS
2x Mi2 Bors

ee ce a ad Wall Framing: Internal
3905 » Wo. Studs: 90 x 35 mgp10 @450c/s
DEEP Conc. .
Trexeneo FAD feo ne Top Plates: 45 x 90 mgp12.
RAB (Keren DETAIL) Bottom Plates: 45 x 90 mgp10

Slab: 100mm thick

Slab concrete: 25mPa, 70mm slump

Footings:

Footing concrete: 20mPa, 100mm slump
A: 23.1KN

[ Bracing= 28.1 KN
B: 14.7KN

Bracing= 23kN
Tie Downs and Bracing
o - Denotes 12mm diam.tie down rods
Bracing - 4mm F14 ply with rods
where noted oo
Lintels:
L1: 120 x 35 F17 K/D - 1/ 90x35 mgp10 jamb studs
L2: 90 x 35 F17 K/D - 1/90x35 mgp10 jamb studs
L3: 120 x 35 F17 K/D - 1/ 90x35 mgp10 jamb studs
L4: 90 x 35 F17 K/D - 2/90x35 mgp10 jamb studs
2 170 x 35 F17 K/D - 2/90x35 mgp10 jamb studs
. | oe i ot r . SOT DATTENS. L6: 90 x 35 F17 K/D - 1/90x35 mgp10 jamb studs .
cpt 1950“, sao Mlk 3) a 2270 fee a2 Ngo ' de rr L7: 120 x 35 F17 K/D - 2/ 90x35 mgp10 jamb studs

6
as ; BARDI- BD . , TOMATH. ig. ;
| ; : bore, putes tr ENoaNe L8: 140 x 35 F17 K/D - 2/90x35 mgp10 jamb studs
A

15 13 =, | CLEARWATER
oe NG : DESIGN
PROJECT.

Clearwater Pty Ltd: License No. 10878033
B } Telephone/Fax: 5474 8449 Mobile: 0413 878 970

Soo nH in . [Client: |

SUR. (Som COMER) Mr/s. M. & H. McCarthy

 

 

 

 

 

 

RiPES TLE
AINSOLATION . ALES TS MATTH EASTING U5

 

; $520 3000 L
REO} | IoD 120 Py, t200 | VP |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N
:

 

 

 

 

 
  

 

 

 

  

 

00 Th) so Th
08 Bomm |
SSEMK Fall 7 |

Kitchen. :. Z

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7 So Q . , |
Bedfoom . ¢ * Living/Diring Ay Patio tt . _ [Project address ]
Wa 3 FEIN. Conc. 4148 | AN Yomm || oo ree eeeeerteerremeere : —| 22 North Eden Court |
|
|

} Fd. i2eoxboo, 207800 2100x1200 _ 900 TTT come, xin. come SUA® cone ooTNes Cooroy
a Bhi | op oe wrerapenne sone B SNe (RERER DETAIL) ; [Project ] |
~—-tL__.._ 16 ____ p BN : Foren COMPRETED SAD Proposed new Granny Flat

. Nfo | oo, TO 1900) N90 | aro lB50 | boo
Registered Professional Engineer 98263

20 Pse09 ! pteet | I To I I
| - «}) A - fr Sob Norden
FLOOR PLAN. i - SECTION A-A os rene

4 f
Signature. fe cereccccerccseee Date... Levee
anata on the NPER-3 in the Category of

 

 

 

 

 

 

 

 

_ BICO® Woo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| ‘Scale: 1-100 |
Drawn by: Murray Lyons
Date: March 2007 |
Job No: 054
Drawing No: 01-074-07 ‘ : |

 

 

 
  
 

Sheet No: 10f1

 

 

Page 21

 

 

 

 

 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  
   
   
      
     

 

 

 

    

 

 

 

 

 

350

“? Goram COMPACTED BEDDING SAND

SECTION._ B-B

SCALE: 1:

SITE. PLAN

 

 

 

 

 

 

 

 

 

 

Pia et

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Me, |

 

0.2 MEMBRANE

> _EPRUENT pisresa
AREA AS PER Loca
COUNCIL FEDDIREMENTS

NEW, fos a
oF SRT.

 

7 350 ,

 

NORTH EDEN court

 

  

287" 37'o"
43.316

 

fK—~—-~ 00 x 100 AWD POST

 

 

 

 

 

 

 

 

 

T--- im
GAN. BRact
7 ay miz Bours, !
iit |
fH 3
“7 Lee
tt g :
\ beef ——o f- NIZ r 7S
f 4 4 Mw.
| Vy i @
bootie g 9 or
350 fb I a " 1
Rote” ‘ 3 L
Loo *

 

 

 

 

 

 

 

‘SLAB/ FOOTING PLAN -

Li lao

RPD: LOT Al on RP 854340

 

Og EE IE zy a -_——---=
ee i
m4 [ i f 100 SLAB !
) i! ' SL82 TEP
| ly Bo evER)
Jt ae ° if g \
lteo a { ;
‘= TTI PIS So mm FALL {
pT i) —>
if ! ’
\ 350 { |
\ { |
i | | |
benno nna
feoTnNG/SLAB ED >
RD EUERERE 7d 2D
A
[COMMENTS 7

 

 

Registered Professional Engineer ¢.-
Mr John Norden

  

   

 

tlonal Professional Engineers Register Section Taree +

 

CLEARWATER
DESIGN
PROJECT

| Clearwater Pty Ltd: License No. 10878033 |
Telephone/Fax: 5474 8449 Mobile: 0413 878 970

 

 

 

 

[Client: |
Mr/s. M. & H. McCarthy
[Project address }.
24 North Eden Court
Cooroy .

. [Project ‘|
Proposed new Granny Flat

 

 

 

 

Scale: 1: 20, 1:200, 1: 100

Drawn by: Murray Lyons

Date: March 2007 4
Job No: 054

Drawing No: 02-074-07

Sheet.No: 2 of 1

 

 

 

Page 22

 

 

xa . LAND USE SECTION FEES
NOOSA —

 

 

 

 

 

 

 

 

 

 

; RECEIPT TYPE
SALE OF DOCUMENTS . : . '
Superseded Planning Scheme Documentation . . 520
Copy of Permit/Approval Letter ‘ , . ‘ 110.
The Noosa Plan Documentation : 414"
APPLICATION FEES ~
Material Change of Use Godelimpact - .
mae OC IZ§S. 521
ee . —
“consistent : . . . §21
Assessment under Superseded Planning Scheme . _ 521
. Modification to a Development Permit . 521
Extension of a Currency Period §21
Operational Works - Landscaping 521
Bidg Work assessable against the Planning Scheme __. 521
E LODGEMENT REVIEW
Half Hour . 522 —
One Hour : , . §22
ADVERTISING
Purchase Advertised Applications . 523
JETTIES , ; .
Jetty Application Fee , . 524
Jetty Bond- : ‘ : ASI 0)
BONDS BS a
: “ Performance Bond : . ; : 50
SIGNS .
Registration Fee : . . : 222
‘SEARCH FEE : . 7
. Search of Land Use Section file . oe 112
e . Liquor Licensing Request : 113
TOTAL § ! 35
NAME: «fy \ MC Cap
. a)
ADDRESS: 22 Nb themes Xa Ck
a CrP Roy @®D Uy t%e 3
FILE NO: 2t{ Ss] DATE: 253/3/<9
RECEIPT NO: 2 , LS | Ley _Signature of TP Officer: f S een
AUTHORITY.NO: _ : 6

[3 %ae7) S57], :

 

Page 23

CALCULATION OF FEES

 

APPLICATION FEE

 

MCU - CODE ASSESSMENT
Details of Development

{Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development .

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPFRATIONIA! \Ainnire

vetalis or Vevelopment

 

FEE CALCULATION

 

 

 

_. ; $
TOTAL FEES , , . . $. @ ‘

 

 

 

 

 

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0557 - MCU - Multiple House Type 1 [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.