Council archive · source document
07/0557 - MCU - Multiple House Type 1 [As Published] · 132007.557
INTEGRATED PLANNING ACT 1997 Environmentally relevant activities Most applications for an ERA in a HPA will not be accepted. Applications which may be made require referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devolved fo DPIF, NRW .or delegated focal goverment (see EPA website for more ~ information on devolved ERAS). iF you answered NO to 020 you do not need to 1 complete Os 21-24, = If you answered YES to 020 and the ‘ development is in a PA, your application must be assessed by the administering authority?? _ against the Widd Rivers Code and must comply "with the code, unless the proposal is for development where an application will nal be accepted, or is exempt from wild river requirements (see Q2). You will be able to determine if an application will not be accepted for he development by answering Q2t - Q24. If you answered NO to Q21, you do riot need fo complete 22.: If you answered YES to Q21 you are required to complete 022. If you answered NO to Q22, the application will Nat be accepted.’ If you answered YES to Q22; “" the ‘application must be assessed by NRW agalnst the Wild Rivers Code and must comply with the code. If you answered NO to 023 and the development Is propesed in the HPA the apptication will not be accepted. Ifyou answered YES to 023, the application must be ‘assessed by the EPA oF NRW (2s prescribed in schedule BA of the IPA) agairist the Wiki Rivers Code and must comply - with the code. _ lf you ariswered YES to 024 the application will not be accepted. If you answered NO to 024, your application must be assessed by NRW against the Wid Rivers Code and must comply with the code. Exempt ERAs in a designated urban area (fthe development is proposed in a designated urban area there may be no wild river requirements. See Section 2 Q2. Note: All applications that can be accepted must be assessed against and must comply with lhe Wild Rivers Code (other than exempt ERAs in a designated urban area). 20. 21. IDAS Assessment Checklist, Version 19.0, 2 March 2007 Dees the application involve an ERA? Oo NO Oo YES (ensure you have completed Part G of Form1) ls the application for an ERA 20 instream? (no Dyves . Is a quarry allocation notice held for the proposed ERA 20 instream? [ino - Dyes . Does the application involve any of the following in a HPA? i} a level 2 ERA 11, (and is for specified works or a residential complex) ii) an ERA 19 (dredging) i) Low inipact ERA 20 (out of stream) for specified works or a residential complex (as defined i in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) LJno CyYes . Is the proposed development for ERA 20 (out of stream) and; — inaFMA; and — not low impact; and — not for a residential complex in the area, or for specified works. (Jno ‘Dyes ‘Documentation if you answered NO to Q25, your application may be subject to an information request and processing of the application may be delayed. 25. Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirements as set out in the relevant part/s of the Wild Rivers Code? Lno LyYes 2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW. Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0557 - MCU - Multiple House Type 1 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.