Original source · versioned page text
Conditioned Marine Plant MP
Attached to the e-mail MCU22/0203 and OPW22/0304 - SRA application correspondence - SARA referral agency response.
Dog Beach Sand Nourishment Project: Marine Plant Monitoring Plan i
Contents
Contents
1 Introduction 1
2 Monitoring Plan 2
2.1 Scope 2
2.2 Objectives 5
2.3 Responsibilities and Obligations 5
2.4 Qualifications 5
2.5 Timing 5
2.6 Monitoring 5
2.7 Evaluation and Adaptive Management 6
2.8 Corrective Actions 6
2.9 Reporting 7
2.10 Finalisation 7
List of Figures
Figure 2-1 Location of Marine Plant Disturbance 4
List of Tables
Table 2-1 Monitoring Report Requirements 7
G:\admin-share\Admin\A10342.g.mpb.NoosaSpitSEMPdesign\R.A10342.002.00.Marine Plant
MP.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original