Original source · versioned page text
D. Traffic Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
The submitted swept path diagrams demonstrate that a 12.5 metre heavy rigid vehicle reversing from the
loading bay will conflict with any vehicle utilising bowsers situated at the end of the canopy.
Amended plans which detail that there will be no bowsers at the end of the canopy or plans amended so that
this conflict is removed.
Response 10
A 12.5m (Austroads) Heavy Rigid Vehicle (HRV) was used to simulate a front loading Refuse Collection
Vehicle (RCV) accessing the site and rear loading area (as illustrated by Figure 4 within Appendix B of the
initial traffic report. It is acknowledged that a vehicle cannot be parked at the southernmost bowser while a
HRV is accessing the site. Figure 5 within Appendix B of the initial traffic report also demonstrated this was
the case for an 8.8m (Austroads) Medium Rigid Vehicle (MRV). However, the plans for the site have been
revised to reduce the building’s footprint and relocate the building and loading area further south. While
an RCV is still unable to circulate and service the site in the event of the southernmost bowser being
occupied (attached Figures 4 and 5), an MRV can now manoeuvre the southernmost bowser, even when
occupied by a car, due to the reconfiguration of car spaces (displayed on the attached Figure 6).
Refuse collection would occur infrequently (i.e. once or twice per week), for a short duration and during off-
peak periods in which there is limited customer activity. As such, for the isolated occasions a vehicle is
using the southernmost bowser, the RCV will need to wait momentarily. Accordingly, it is not proposed
that the southern bowsers be removed. In the event that the frequency of conflict becomes an issue, the
service station manager may implement strategies to assist access, such as temporarily blocking access to
the southernmost bowser.
Reconfiguration of the site’s car parking has also led to an increase in provision by three (3) spaces,
designated for the following users: two visitor and one air / water space. This increase also means the
proposed development is fully compliant with the car parking requirements of the Noosa Planning Scheme
for types 2 and 5 of the ‘Retail Business’ land use (12 spaces as identified in Section 3.2.1 of the initial traffic
report). The air / water space can be accessed directly from the site’s ingress (shown in the attached Figure
7), with two visitor bays replacing the single car space previously located in the southeastern corner of the
site. Provision of the air / water bay along the eastern boundary does not impact the manoeuvring of cars
and service vehicles.
I trust this additional information is of assistance.
If there any further queries regarding this information, please contact me.
Yours sincerely,
Gerard Reardon
RPEQ #17765
Director
MRCagney Pty Ltd
3
6396_B_RFI_001(2)_NSC.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.