PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 FEBRUARY 2018
Plan No. Rev. Plan/Document Name Date
DD1.3 H SITE PLAN by Sparks Architects 27-06-17
DD1.15 G GROUND FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.16 G FIRST FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.17 F ROOF FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.18 G GROUND FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.19 G FIRST FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.20 F ROOF PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.21 G GROUND FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.22 G FIRST FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.23 F ROOF PLAN BLOCK 12 by Sparks Architects 27-06-17
WD2.8 B ELEVATIONS BLOCK 10 by Sparks Architects 23-08-17
WD2.9 B ELEVATIONS BLOCK 11 by Sparks Architects 23-08-17
WD2.10 B ELEVATIONS BLOCK 12 by Sparks Architects 23-08-17
15128/SK10 A2 Concept Siteworks and Drainage Layout Plan, prepared by Morgan 19-04-16
Consulting Engineers
15128/SK11 A2 Concept Siteworks and Drainage Layout Plan –Sheet 1, prepared by 19-04-16
Morgan Consulting Engineers
15128/SK12 A2 Concept Siteworks and Drainage Layout Plan – Sheet 2, prepared by 19-04-16
Morgan Consulting Engineers
15128/SK13 A1 Concept Road 1 Longitudinal Section, prepared by Morgan 19-04-16
Consulting Engineers
15128/SK14 A1 Concept Road 2 Longitudinal Section, prepared by Morgan 19-04-16
Consulting Engineers
Applicant’s requested change
The applicant requests that condition 2 be updated to reflect the new set of plans.
Assessment
The proposed amendment to condition 2 will reflect the new set of plans and is therefore
supported.
Condition 3
3. The approved development comprises a total of 4 x 2 bedrooms and 33 x 3 bedroom units,
subject to compliance with the further requirements of Condition 4.
Applicant’s requested change
The applicant requests that the condition be updated to reflect the new unit mix and compliance
with the density requirements being achieved. The applicant requests that the condition now
read:
3. The approved development comprises a total of 4 1 x 2 bedrooms and 33 28 x 3 bedroom
units, subject to compliance with the further requirements of Condition 4.
Assessment
The proposed amendment to condition 3 will reflect the new set of plans and is therefore
supported.
Page 15 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.