Original source · versioned page text
2018-02-06 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 FEBRUARY 2018
Condition 49
49. Where stormwater runoff from the site will enter the Noosa Springs Lake System, Quarterly
monitoring is required of stormwaters directed from the development to the Noosa Springs
Lake System. Monitoring must be undertaken by a suitably qualified person using NATA
accredited methods for the following parameters.
Nitrite plus Nitrate as N (NOx)
Total Kjeldahl Nitrogen (TKN)
Total Nitrogen as N (TKN + NOx)
Total Nitrogen as N
Total Phosphorus as P
Reactive Phosphorus as P (Dissolved)
Reactive Phosphorus – Filtered
Water quality monitoring results must be retained in electronic form by the property owner
for a minimum of 5 years and must be made available to Noosa Council on request. This
monitoring must continue until notified by Noosa Council that it is no longer needed.
Applicant’s requested change
It is contended that a two (2) year monitoring period is an appropriate period within which a
measurable data set is able to be collated demonstrating appropriate stormwater quality
outcomes from the development. It is suggested that the previous condition be reintroduced with
amendments as outlined below:
49. Where stormwater runoff from the site will enter the Noosa Springs Lake System, Quarterly
monitoring is required of stormwaters directed from the development to the Noosa Springs
Lake System. Monitoring must be undertaken by a suitably qualified person using NATA
accredited methods for the following parameters.
Nitrite plus Nitrate as N NOx)
Total Kjeldahl Nitrogen TKN)
Total Nitrogen as N (TKN + NOx)
Total Nitrogen as N
Total Phosphorus as P
Reactive Phosphorus as P (Dissolved)
Reactive Phosphorus - Filtered
Water quality monitoring required by this condition must commence at the commencement
of operation of the first stage of the development until two (2) years following the
completion of the final stage of the development. Water quality monitoring results must be
retained in electronic form by the property owner for the duration of the monitoring and
must be made available to Noosa Council on request.
Assessment
The request to amend this condition was referred to Council’s Environment Officer who advised:
2 years of monitoring data is not sufficient to determine any trends as a result of the
development. 5 sample events are the general minimum to establish statistical information if
necessary.
Due to the need to obtain suitable sample data it is recommended that this condition remain
unchanged.
Page 18 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.