Original source · versioned page text
2018-02-06 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 FEBRUARY 2018
Plan No. Rev. Plan/Document Name Date
7043-DA102 08 SITE MAINTENANCE SHED LANDSCAPING by Blackburne 12-10-17
Jackson Design
7043-DA104 08 BLOCK 25: LANDSCAPING by Blackburne Jackson Design 12-10-17
7043-DA105 08 BLOCKS 23 & 24: LANDSCAPING by Blackburne Jackson 12-10-17
Design
7043-DA106 08 BLOCK 24 & CORNER LANDSCAPING by Blackburne 12-10-17
Jackson Design
7043-DA107 07 PLANT SPECIES PALETTE & HARDSCAPE MATERIALS 12-10-17
by Blackburne Jackson Design
7038-DA13 07 Overall Staging Plan by Blackburne Jackson Design 14-06-17
DD1.3 H SITE PLAN by Sparks Architects 27-06-17
DD1.15 G GROUND FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.16 G FIRST FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.17 F ROOF FLOOR PLAN BLOCK 10 by Sparks Architects 27-06-17
DD1.18 G GROUND FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.19 G FIRST FLOOR PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.20 F ROOF PLAN BLOCK 11 by Sparks Architects 27-06-17
DD1.21 G GROUND FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.22 G FIRST FLOOR PLAN BLOCK 12 by Sparks Architects 27-06-17
DD1.23 F ROOF PLAN BLOCK 12 by Sparks Architects 27-06-17
WD2.8 B ELEVATIONS BLOCK 10 by Sparks Architects 23-08-17
WD2.9 B ELEVATIONS BLOCK 11 by Sparks Architects 23-08-17
WD2.10 B ELEVATIONS BLOCK 12 by Sparks Architects 23-08-17
3. The approved development comprises a total of 1 x 2 bedrooms and 28 x 3 bedroom
units.
13. External colours and finishes of the building must comprise of muted environmental
tones that blend with the natural environment, as indicated on approved plan DA26
“Finishes Palette / Schedule” by Blackburne Jackson Design. Buildings 23, 24, and
25 must not contain broad areas of light coloured walls.
14. Any new boundary fencing along the southern and eastern boundaries must be
constructed to allow for the movement of fauna. Such fencing must:
a. allow adequate clearance at ground level for local macropods;
b. not include use of barbed wire or similar materials;
c. provide regular opportunities for passage over and through for fauna.
31. A minimum of 68 car parking spaces must be provided and marked on the overall site
generally in accordance with the approved plans. The works may be staged and
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. 8 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use.
b. Crossfalls, gradients and vehicle headroom in accordance with Australian
Standard AS2890: Parking Facilities.
c. The minimum number of parking spaces as indicated on the approved plans for
each of the buildings in the particular Stage.
Page 5 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.