Officer: 	Patrick Murphy
Direct Telephone: 	5329 6436
Our Reference:	MCU21/0171
Your Reference:	0263
14 June 2022
NC Jorss & K Jorss
C/- Pivotal Perspective Pty Ltd
95/3 Hilton Tce
NOOSAVILLE  QLD  4566
[email protected]
Dear Sir/Madam,
Negotiated Decision Notice
Planning Act 2016
I refer to your application and the representations you made in respect to the decision notice. On 9 June 2022, Council decided your representations. This negotiated decision notice replaces the decision notice of 31 March 2022.
Details of the negotiated decision are as follows:
APPLICATION details
Application No:	MCU21/0171
Street address:	34 Plover St Peregian Beach Qld 4573
Real property description:	Lot 10 P 9313
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
decision details
Council on 31 March 2022, decided to issue the following type of approval:
Development Permit for Material Change of Use of Premises (Dwelling House)
In relation to representations, Council on 9 June 2022 decided to:
Agree to amend condition 2
Delete conditions 3 and 4
currency period of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
DD 1.1	F	Site Plan, prepared by Sparks Architects	24.05.22
DD 1.2	F	Basement Floor Plan, prepared by Sparks Architects	24.05.22
DD 1.3	E	Ground Floor Plan, prepared by Sparks Architects	24.05.22
DD 1.4	E	First Floor Plan, prepared by Sparks Architects	24.05.22
DD 1.5	F	Roof Plan, prepared by Sparks Architects	24.05.22
DD 2.1	E	North Elevation, prepared by Sparks Architects	24.05.22
DD 2.2	E	East Elevation, prepared by Sparks Architects	24.05.22
DD 2.3	E	South Elevation, prepared by Sparks Architects	24.05.22
DD 2.4	E	West Elevation, prepared by Sparks Architects	24.05.22
DD 3.1	E	Section A, prepared by Sparks Architects	24.05.22
DD 3.2	F	Section B, prepared by Sparks Architects	24.05.22
DD 3.3	E	Section C, prepared by Sparks Architects	24.05.22
DD 3.4	E	Section D, prepared by Sparks Architects	24.05.22
Built Form
Deleted
Deleted.
The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface.
Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice.
Currency Period
This development approval lapses if the use has not happened by 31 March 2026, unless an application to extend the currency period is approved by Council.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
A minimum of 20% of the site must be retained as soft landscaping.
Existing vegetation in the road reserve must be retained, unless written authorisation from Council is granted for the clearing.
Screening vegetation must be planted along the northern property boundary in accordance with Council’s Planning Scheme Policy PSP2 - Landscaping.  The planted vegetation must consist of native, endemic species.
Dense landscaping must be provided along the northern and southern sides of the dwelling for the length of that part of the dwelling which is 3 storeys in height.
Coastal Protection
Gates must not be installed along the eastern property boundary to gain direct access to the beachfront.
External colours and finishes of the building must comprise of muted/environmental tones that blend with the natural environment.
ENGINEERING
Site Access and Driveways
A sealed access driveway must be provided from Plover Street to all parking and manoeuvring areas of the development. These proposed works must be undertaken with written approval in accordance with Noosa Council driveway crossover approval conditions and adopted standard drawings for the crossover type as required by the planning scheme.
The driveway must be constructed to grades that ensure that vehicles will not bottom out or scrap on the driveway or the road formation when entering and exiting the site.
The driveway must be constructed generally in accordance with drawing No. A6643/21/P01, “Site Specific Stormwater Management Plan”, dated 24/08/2021 and prepared by Alta Projects.
Stormwater Drainage
Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property. The works must be undertaken generally in accordance with drawing No. A6643/21/P01, “Site Specific Stormwater Management Plan”, dated 24/08/2021 and prepared by Alta Projects.
The site specific SWMP must be approved as part of the subsequent Building Permit.
The site specific SWMP must be consistent with the site specific geotechnical report’s recommendations.
The stormwater drainage discharge from the development must be carried out in accordance with a professionally prepared engineering plan in compliance with the applicable standards and best engineering practices.
The development works must not cause additional ponding of water on any adjoining property (including the road reserve), or concentrate or direct overland flow to any adjoining property.
Private drainage structures must be wholly contained within the subject site.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
Earthworks carried out on site must not affect the structural integrity of any of the adjoining lands and/or buildings and/or structures and/or services.
All works must be carried out in accordance with the site specific report 21327-001-Rev0, “Geotechnical Investigation”, dated 10 September 2021 and prepared by Tectonic.
The site specific geotechnical report must be consistent with the site specific SWMP’s recommendations.
All earthworks and associated foundations/footings, retaining structures/batters, both above and below ground level and both temporary and permanent, must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected]	Schedule 10, Part 4, Division 3, Table 1 (Planning Regulation 2017): Premises contaminated because of unexploded ordnance.	The agency provided its response on 5 November 2021 (Reference No.2110-25493 SRA). A copy of the response is attached

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's Development Assessment Branch to arrange a Development Compliance Inspection.
Resubmission of Amended Plans Required
The conditions of this Decision Notice require resubmission of plans to Council with amendments. Please address the amended plan/s to Council’s Development Assessment Branch with the Reference No. MCU21/0171.
Nature Conservation Act
It is the responsibility of the applicant to ensure compliance with the Nature Conservation Wildlife Management Regulation 2006 which is regulated by the State Government.
There may be a requirement to undertake a Flora Survey pursuant to Flora Survey Guidelines prior to any clearing activities pursuant to Chapter 4 of the Nature Conservation Wildlife Management Regulation 2006. Exemptions are listed in Division 5 of the same Act. Further information can be obtained at this website https://www.ehp.qld.gov.au/licences-permits/plants-animals/protected-plants/ or by calling the Department of Environment and Heritage Protection on 1300 130 372.
There may also be a requirement to obtain State Government Approval of a Species Management Plan prior to any activities that tamper with any place that is being used by a native animal for breeding activities. This is regulated by Section 332 of the Nature Conservation Wildlife Management Regulation 2006. Further information regarding this matter can be obtained at this website https://www.ehp.qld.gov.au/licences-permits/plants-animals/species-management-program/ or by calling the relevant State Department.
Sustainability
In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes

Property Driveway and Vehicle Crossover
The planning scheme declares the construction of a driveway and vehicle crossover to the property to be accepted development against the Low Density Housing Code where complying with the relevant Acceptable Outcomes. In addition to the benchmarks for accepted development subject to requirements for driveway and crossovers, approval is required from Council to construct or modify all crossovers (refer to Council’s website).
Where the proposed driveway and vehicle crossover does not comply with each Acceptable Solution contained in the Code, a Development Permit for Operational Works is required to be obtained from Council.
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-development/development-tools-guidelines/infrastructure-charges
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Building Works	All building work.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.

OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Patrick Murphy
Coordinator Planning

Enc:	Appeal Rights
Approved Plans/Documents

DECISION NOTICE HISTORY
Original Decision Notice – 31 March 2022.
Negotiated Decision Notice -  9 June 2022, with an amendment to condition 2 and delete conditions 3 & 4
cc.	SARA at DILGP
Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/
(for assistance, contact DILGP at 5352 9701 or email [email protected])

	Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer1.xml]
Page 2 of 13

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 13

[word/footer3.xml]
Page 13 of 13

[word/footer4.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 13

[Attachment: image2.png (image text)]
ee) NOOSA COUNCIL


[Attachment: image5.png (image text)]
: w

‘SARA response—34 Plover Street, Peregian Beach

“he cevecpmet appliances eo ua cota 2 repay etary eS
Aces na Rete Agere (SARA oh 22 Coe 202,

Response

oasore aaa ae Re

Datorrspnse: November 221

conan “Tecontanen tater mu anes any
isomer pros

sates ‘ceo e pnt in Atactnet?.

ese: “Te rescns re teal agency reponse atten

Development details

Deseo: Depress tue Ding

rare eter en

SAA ‘Sea 1. Pat oi 3 Tape 1 agg eaten:
Sidnoct rombciod case funopeoseeanee

 


[Attachment: image6.png (image text)]
 

 

‘Asesenent anager, Noosa Sie Cana

ee Se Pover Steet Pangan Bean
Reappenycecapton Let 10313,

Aplcat rane. Ne sss 8 srs Petal Pepe yL
povcetcricia: —aseNay

Representations

Rear ae ER oy TEESE

ee pecan ae Sera ry esse 50 everest Ma)

_Acopy te repre hs ban canto tne splint rn nesta.

Fornateramaton pease cnt Pau Gesson Paris Paving Oat on 3629717 oa
(eral secNomsaRAGcealgnqigo au wo wi be pasar io ae

 

 

 


[Attachment: image7.png (image text)]
 

Attachment 1—Referral agency conditions

 

‘ng

 

era cage se
Scneaae 1, Part & Oion 5 Taba 1 (Panning Reguaton 2077 —The cue eae
sammie ne Parag At 2016 reruiee he Ores ener fe Capa of S|
Devaopment mtasrucr, Loca Gomme ard Paving be he ere asa fe
evecpmertn wich verse sppova rec re aaneraon an error 2
rater reg abe loung crater
7. | Prose wien corimaion be Depavren Sa Dap _| THE
Insacucve Loca Goverment and Pannngby sn sped cantata on | commencanert
ne aicratn Goverment patent Dees UnerpeaeeCrnance | owas
(UXO) Pane nate safe cos ee eneased cea

 

 

me unersaces crinaoe (no) Paes und nine st
| Sots oo ausitemansoe re sooDErOTToSnae 360

 

 

 

 

 


[Attachment: image8.png (image text)]
Attachment 2—Advice to the applicant

 

 

[General advo
‘Fe Gee Dict Aeon rome S000) 23 awed tans wae
Bounsy nan

 

72 | ips ne cues, ope and wy Patan TBOIRUTD WOH GT GIRS CTE IGA
(Racin mae wg ened rt a er poh

 

 

 

 

 


[Attachment: image9.png (image text)]
‘Attachment for referral agency response.
wn
cat 13
an
2017
Pons
Log in to download the original file

SUPERSEDED - Negotiated Decision Notice MCU21 0171.docx · 585 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.