Council archive · source document
SUPERSEDED Negotiated Decision Notice MCU17/0073
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: MCU17/0073 Your Reference: n/a 13 July 2018 Lutheran Church Of Australia Queensland District C/- Adamson Town Planning PO Box 78 PEREGIAN BEACH QLD 4573 Dear Sir/Madam Negotiated Decision Notice Sustainable Planning Act 2009 I refer to your application and the representations you made in respect to the decision notice. On 27 September 2018 Council decided your representations. Details of the decision are as follows: 1. APPLICATION DETAILS Application No: MCU17/0073 Street Address: 115 Eumundi Noosa Rd NOOSAVILLE QLD 4566 Real Property Description: Lot 1 SP 228052 Planning Scheme: The Noosa Plan (28 October 2016) 2. DECISION DETAILS Council on 17 July 2018 decided to issue the following type of approval: Development Permit for Material Change of Use of Premises (Wellbeing Type 3 Worship) In relation to representations, Council decided to: A. Approve a change to conditions 19 and 21. B. Refuse to change conditions 10 and 13. 3. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 4 years starting the day that this development approval takes effect. 4. ASSESSMENT MANAGER CONDITIONS PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Plan/Document Name Date 160012_A-D-A- 01-00_1 Site Plan – Overall, drawn by Ken Down Architects 30 May 2017 160012_A-D-A- 01-00_2 Site and Location Plan, drawn by Ken Down Architects 30 May 2017 160012_A-D-A- 02-01_2 Existing Floor Plan, drawn by Ken Down Architects No date 160012_A-D-A- 02-03_4 Lower Ground Level, drawn by Ken Down Architects l 21 March 2017 160012_A-D-A- 02-02_5 Ground Floor Plan, drawn by Ken Down Architects 21 March 2017 160012_A-D-A- 02-04_2 Roof Plan, drawn by Ken Down Architects March 2017 160012_A-D-A- 04-01_3 External Elevations, drawn by Ken Down Architects (as annotated by Council) 30 May 2017 160012_A-D-A- 04-50_1 Perspectives, drawn by Ken Down Architects (as annotated by Council) 29 May 2017 160012_A-D-A- 04-51_1 Perspectives, drawn by Ken Down Architects (as annotated by Council) 29 May 2017 160012_A-D-A- 04-55_1 Perspectives, drawn by Ken Down Architects 29 May 2017 160012_A-D-A- 05-01_2 Sections, drawn by Ken Down Architects (as annotated by Council) 30 May 2017 160012_A-D-A- 05-02_2 Sections, drawn by Ken Down Architects 30 May 2017 160012_A-D-A- 05-03_2 Sections, drawn by Ken Down Architects 31 May 2017 160012_A-D-A- 04-52_1 Perspectives, drawn by Ken Down Architects 29 May 2017 160012_A-D-A- 04-53_1 Perspectives, drawn by Ken Down Architects 29 May 2017 160012_A-D-A- 04-54_1 Perspectives, drawn by Ken Down Architects 29 May 2017 Nature and Extent of Approved Use The total seating capacity of the approved use must not exceed 243 as shown on the approved plans for general church services, with the exception of school services and significant religious events held during the Easter and Christmas periods. The school hall space must not be used for general church services but can be used for school services and significant religious events held during the Easter and Christmas periods. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council, to secure performance of conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. Roof materials must be non-reflective and designed with colours and styles to minimise the visual impact of the development. The cross associated with the church must not protrude above the roof line. The church cross must not be illuminated in any way and where spot lights are used, must be switched off from 9pm each night. The north eastern side of the congregation area should not have louvres or windows capable of being opened. Church hours The church must not operate outside the hours of: 7am to 10pm Monday to Thursday 7am to 11pm Friday and Saturday 8am to 10pm Sunday or any public holiday. A dawn service is allowed on an infrequent basis not exceeding one or two services per year. Wedding ceremonies and funerals are not to be scheduled at the same time as when school pick up and drop off times occur. Landscaping Landscaping must be provided within the development site in accordance with the approved plans. Stormwater Drainage Stormwater runoff from the development must be connected to the existing site stormwater system and must not cause scour or damage to the subject site or any adjoining property. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Acoustic requirements Building works must be in accordance with the recommendations of the Acoustics Noise Vibration report dated 12 September 2018, prepared by Acoustics Noise Vibration, in particular the design and acoustic treatment of the ceiling above the friendship terrace. Written certification from a suitably qualified person confirming that the noise control measures are as recommended in the Acoustics Noise Vibration Report dated 12 September 2018 (Ref: 0145 GSL Church Conditions Rpt 02) is required to be submitted to Council prior to the use of the friendship terrace. Written certification is required from a suitably qualified person confirming that sound pressure levels measured at the nearest residential place comply with the following: Air-conditioning 7am to 10pm: Maximum level allowable = background + 5dB(A) 10pm to 7am: Maximum level allowable = background + 3dB(A) Noise nuisance beyond the boundary of the site shall not exceed the following levels: Worship Centre, Offices and Meeting Room 7am – 10pm: Background noise level plus 5 dB(A) 10pm – Midnight: Background noise level plus 3 dB(A) 12pm – 7am: Inaudible Friendship Terrace 6pm – 8pm: Background noise level plus 5 dB(A) Hours of use: 7am – 8pm Lighting Devices Lighting associated with the use must be designed, sited, installed and tested to comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting” using a control level of 1. Certification must be submitted to Council from a qualified person* which certifies that all outdoor lighting devices comply with the requirements of this Decision Notice. * See advisory note. 5. REFERRAL AGENCIES The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Advice Energex Limited Town Planning GPO Box 1461 BRISBANE QLD 4001 Within 100m of a substation site The agency provided its response on 19 July 2017 (Reference No. HBD 5752340) A copy of any referral agency conditions is attached. 7. REFERENCED DOCUMENTS Not Applicable. 8. ADVISORY NOTES The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. Sustainability In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building design for residential and commercial development. Council encourages the use of sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems (including the use of inverter/charges), water saving devices and rainwater harvesting. For further information go to http://www.noosa.qld.gov.au/sustainable-homes Certified Person For the purpose of certifying Australian Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting” using a control level of 1, a qualified person is considered to be a Registered Professional Engineer of Queensland. For the purpose of certifying acoustic barrier construction for the development, a qualified person is considered to be a Registered Professional Engineer of Queensland. 9. PROPERTY NOTES Not Applicable. 10. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable. 11. FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Work (Private Certification) 12. SELF ASSESSABLE CODES The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Advertising Devices Code 13. SUBMISSIONS There were 4 properly made submissions about the application. In accordance with Sustainable Planning Act 2009, the name and address of the principal submitter for each properly made submission is provided and attached. 14. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable. 15. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. 16. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at https://www.noosa.qld.gov.au or at Council Offices. DECISION NOTICE HISTORY Original Decision Notice 17 July 2018 Negotiated Decision Notice 27 September 2018, with a change to conditions 19 & 21. Yours faithfully Lisa Pienaar Development Planner Enc: Infrastructure Charge Notice Referral Agency Response Approved Plans/Documents List of Submitters Appeal Rights cc Unitywater Energex Limited Referral Agency Response SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 List of Submitters SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 Only Properly Made Submissions are to be included in this notice (s335 (1) (l)) Author Address1 Address2 Michael & Celia Maloney 29 Regatta Circuit NOOSAVILLE QLD 4566 [email protected] Marilyn Abel 23 Regatta Circuit NOOSAVILLE QLD 4566 [email protected] Gerald Victor 25 Regatta Circuit NOOSAVILLE QLD 4566 [email protected] Bruce & Dani Bairstow 27 Regatta Circuit NOOSAVILLE QLD 4566 [email protected] Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 4 of 3 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 9 [word/footer3.xml] Page 3 of 9 [word/footer4.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 3 [word/header1.xml] MCU17/0073 [Attachment: image1.png (image text)] ee) NOOSA COUNCIL [Attachment: image4.png (image text)] a mm NOOSA COUNCIL [Attachment: image5.png (image text)] 19 July 2017 energex teresa positive enemy Via: [email protected] Attention: Lisa Plenaar ce Adamson Town Planning ‘Via: [email protected] Attention: Shane Adamson Dear Lisa, Development Application - Material Change of Use for Additions and Alterations to existing Church located at 115 Eumundi Noosa Road, Noosaville described as 1 on $P228052. Applicant Ref: 17020 ‘Council Ref: MCU17/0073, ‘Our Ref: HBD 5752340 We refer to the above reference Development Application which has been referred to Energex Limited in accordance with the Sustainable Planning Act 2009. Energex Limited acting as an Advice Agency under the Sustainable Planning Act 2009 recommends approval for the proposed Material Change of Use for Additions and Alterations to existing Church. ‘Should you require any further information on the above matter, please ‘contact the undersigned on (07) 3664 4815, Yours faithfully = (ory3e0e coxa Ema — rms kirsten Sellers Goons ‘Senior Town Planner Corporate Offce Property Services 25 Reda Sect Energex Limited Newseas GL. 4008 (PO Box Ht Brstane 4001 Telephone (07) 9668 4000, Facsimile (07) 2025 2201 i energexcom au Energex Limited ‘AEN 0 078 B49 055 Reference: HB0 6752340
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice MCU17/0073Related documentApplication case desk ↗
About this file
- File size
- 409 KB (small file)
- File type
- DOCX
No other editions are linked here.