Original source · versioned page text
6. Landscape Code
Performance outcomes Acceptable Outcomes
Landscape Plan in Appendix C and Engineering
plans in Appendix E.
Natural Drainage
PO8 AO8.1 Not applicable
Landscaping maintains or enhances the quality of Landscaping works maintain and enhance natural There are no natural drainage lines on the site.
surface water and groundwater. drainage lines (including creeks, gullies, waterways
and wetlands) to convey stormwater
AO8.2 Not applicable
Riparian buffers are maintained and rehabilitated.
AO8.3 Complies
Within paved or sealed surfaces, tree grates Pervious areas have been incorporated into access
provide for water and natural air movement driveway which allows rainwater to infiltrate the
however are not to be used as drain. ground.
Bank stability
PO9 AO9 Not applicable
Works or structures do not impact on erosion or Structures and recreational facilities (including
bank stability. playgrounds, pergolas, barbeques etc.) are setback
a minimum of 30 metres from the top of the bank of
any watercourse and 10 metres from the top of the
bank of any drainage line.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.