Original source · versioned page text
6. Landscape Code
Performance outcomes Acceptable Outcomes
Complies:
AO2.9 The development’s finishes include timber and
Timbers and other natural materials that reflect the natural materials that reflect the colours and
colours and textures of the landscape are textures of the landscape. Refer to the material and
incorporated. finishes palette in Appendix B.
Complies:
The development utilises durable materials which
AO2.10
do not require regular treatment or maintenance.
Timbers which are allowed to fade to grey and
Refer to the material and finishes palette in
metals that are designed to rust are used rather
Appendix B).
than materials which require regular treatment or
maintenance.
Street Trees
PO3 AO3.1 Performance outcome
Street trees within road reserves provide effective A minimum of 2 street trees are provided per lot or The existing streetscape utilises verge planting as
canopy shading having regard to the size and scale every 8 metres of frontage, whichever is the opposed to street trees, as such, the proposal
of the road reserve and the location of services and greater. seeks to maintain the existing verge planting along
other structures. the site’s frontage to maintain consistency with the
existing streetscape.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.