Original source · versioned page text
Appendix D Site Access & Intersection Investigation
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
This option is not considered to be acceptable due to the majority of traffic through the intersection
being from and into Northmount Rd from Uhlmanns Rd.
Refer to Attachment E – Drawings 3225-SK10 for more details of this option assessment.
Figure 8: Intersection Sight Distance assessment for Give Way on Uhlmanns Rd (south)
As both intersection upgrade options are undesirable, it is recommended that a traffic study (including
volume and speed) be undertaken to determine the most appropriate course of action (if any) to support
the proposed Reconfiguration (1 Lot into 2).
CIV03225-01 Site Access & Intersection – Oct 2022 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.