PM Submission Object - Betty Vawser - MCU16/0153 & REC16/0041
,
& Pocket Park to encourage parking & pedestrian access to the village would be greatly
compromised by the 2m proximity & 7m height of the proposed Reed & Wallum buildings, on
top of whatever level of fill is added to natural ground level.
4) The Development's significant impact on the Creek & Wetland, both during construction &
upon completion is of tremendous concern, as is the planned density of housing on top of &
beSide this ecologically sensitive reserve, adjacent Noosa National Park - Emu Swamp Section.
The natural spring, recognised in the 1960s & probably for thousands of years by our
indigenous forebears, known locally as Little Rufous Creek creates a watercourse that feeds into
the wetland & contributes to its ecological value.
Some 25,000 cubic metres of imported fill will be required, giving rise to 150 trips per day for at
least 3 months. This means one heavy vehicle axle load every 3-4 minutes along David Low
Way, down Sandpiper Court, through the IGA carpark & then back out via the Heron St
roundabout. The impacts of such large amounts of fill, will create fragmentation & attrition of
the watercourse, its habitat values & biodiversity - an environmental injustice for Qld Govt's
identified Mandatory Essential Habitat.
There is no reference in the DA to the planned disturbance to essential wetland habitat for the
vulnerable Wallum Froglet( Crinia tinnula), Wallum Rocketfrog (Litoria /reycinetj, Wallum
Sedgefrog (Litoria oblongburensisj, nor the impact on wetland heathland & sedgeplain,
inhabited by the vulnerable Ground Parrot (Pezoporus wollicus) recorded less than 500ms from
the site.
5) Significant & continuous Noise & Disruption to homes along David Low Way, adjoining
streets, laneway, PB Hotel, Hardware store, business & private premises in the vicinity of the
roadways & roundabout is guaranteed. The impact will be to the detriment of acoustic & visual
qualities, lifestyle, holiday village ambience & business, especially the al fresco dining/coffee
shops that all enjoy fresh air & ocean sounds.
6) Substantially Increased Traffic & Congestion is assured during construction as standing traffic
queues currently form at all accesses to the roundabout, particularly at daily peak times,
exacerbated further during school & public holidays. The proposed development risks being a
serious source of additional congestion & given the layout/landform, nigh on impossible to
mitigate in the future.
7) Foreground Vistas of the wetland & its vegetation across Noosa National Park-Emu Swamp
Section to Mt Cooroy will be diminished, in fact lost, to the bulky Hotel/Motel building's
projected heights. Council needs to ensure height specifications are accurate & the current
expansive views are maintained. Her~'s an opportunity to protect & showcase the intent of