Flood Impact Assessment

Recycle and Transfer Station Centre
561 Noosa-Eumundi Rd, Doonan
Noosa Shire Council
                                            covey.com.au




    Reference: 244035/M25-0045Rpt Issue A
    February 2025
Log in to download the original file

UPDATED DA - Attachment 7 - Flood Impact Assessment.pdf · 259 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of the other 68 pages

Page 2

Report Review

 Document No.         Revision             Prepared By           Reviewed By            Date Issued


   M25-0445Rpt              Issue A          Allister Gaffney        Terry Lucke          February 2025




Report Distribution

 Document             Revision              Method of Delivery           Issued To

   M25-0445Rpt              Issue A                 Electronic                 Noosa Shire Council




© Copyright Covey Associates Pty Ltd (2025).

This document is the property of Covey Associates Pty Ltd. This document and the information contained in
it are solely for the use of the authorised recipient and this document may not be used, copies of reproduced
in whole or part for any purpose other than that for which it was supplied by Covey Associates Pty Ltd. Covey
Associates Pty Ltd makes no representation, undertakes no duty and accepts no responsibility to any third
party who may use or rely upon this document or the information contained in it.

COPYRIGHT NOTICE:       Parts of this document contain material originally prepared by:

This material is the intellectual property and copyright of Covey Associates Pty Ltd.




                      AGaffney                                             Terry Lucke
                Author: Allister Gaffney                                 Review: Dr Terry Lucke
            Senior Water Resource Engineer                                   Senior Engineer
         BEng (Civil), MEng, RPEng, RPEQ 24345                       PhD, FIEAust, CPEng, RPEQ, NER

Page 3

                                           CONTENTS
1.0   INTRODUCTION                                                                1
2.0   SITE DESCRIPTION                                                            1

      2.1   Site Location                                                          1

      2.2   Existing Land-use, Topography and Drainage                             2

      2.3   Proposed Land-use                                                      2
3.0   FLOOD IMPACT ASSESSMENT                                                     3

      3.1   Flood Modelling                                                        3

      3.2   Hydrology                                                              3

      3.3   Temporal Patterns and Rainfall Intensity                               4

      3.4   Rainfall Durations                                                     4

      3.5   Rainfall Losses                                                        4

      3.6   Pre-Burst Rainfall                                                     4

      3.7   Areal Reduction Factor                                                 4

      3.8   Manning’s n Values                                                     5

      3.9   Fraction Impervious                                                    5

      3.10 Topography                                                              5

      3.11 Grid Cell Size                                                          6

      3.12 Tailwater Conditions                                                    6

      3.13 Hydraulic Structures                                                    6

      3.14 Developed Case Scenario                                                 9

      3.15 Results                                                                 9
4.0   CONCLUSION                                                                  11
5.0   REFERENCES                                                                  11

                         APPENDIX                      DESCRIPTION

                        Appendix A                       Site Plans

                        Appendix B       Mannings ‘N Roughness Coefficient Maps

                        Appendix C                       Flood Maps

Page 4

     1.0    INTRODUCTION
     This Flood Impact Assessment has been prepared to quantify the overland flow flood impacts for the proposed
     development at 561 Noosa-Eumundi Rd, Doonan. It will ensure appropriate methods and designs are implemented to
     suitably mitigate overland flow risks and/or flood hazards and will provide information and guidance to support the
     outcomes required by Noosa Shire Council (NSC). NSC requires that stormwater runoff be appropriately managed prior
     to discharge from the site.
     The development application is for a Recycle and Transfer Station Centre and associated infrastructure (e.g., roads,
     carparks, etc.) to support this use. Refer to the site plans in Appendix A for further detail. The engineering plans are
     current at the time of writing this report, if the plans are changed it is recommended that the plans be provided to
     Covey Associates for reassessment.
     This FIA describes the flooding characteristics of the proposed development site under existing and proposed
     conditions to understand what impact, if any, the proposed development will have on the existing flooding regime
     within the site and surrounding properties.

     2.0    SITE DESCRIPTION

     2.1    Site Location

     The sites real property description is Lot 77 SP298776. The total area of the site is approximately 192 ha. The area of
     work is approximately 3 ha. Refer to Figure 2-1 for further detail.




                                     Figure 2-1 Site Locality (Image Courtesy of Nearmap)




Noosa Shire Council                                                                                     1
M25-0045Rpt – 244035– February 2025

Page 5

     2.2    Existing Land-use, Topography and Drainage

     The site in its existing state is the Noosa Resource Recovery Centre which is mainly covered with maintained bushland
     in the northern portion of the site and existing buildings and land fill areas in the southern portion. The site is
     surrounded by bushland to the east, west and south. There are residential lots and a golf course to the north.

     The site slope is approximately 1.5%, with gradual changes in elevation from 30 m AHD to 16 m AHD. The site slopes
     from south to north and discharges over the northern boundary to the northern road reserve before flowing through
     the golf course. Note that the site also has an external upstream catchment to the south which has been considered
     in the assessment.

     2.3    Proposed Land-use

     The development is a Recycle and Transfer Station Centre and associated infrastructure which is replacing the Solid
     Waste Depot and Reviva Noosa Reuse Shop buildings. Refer to Figure 2-2.

     Earthworks have been proposed to accommodate the development of the site and to facilitate efficient drainage.

     Appropriate drainage infrastructure has been proposed in the design, including overland flow swales to discharge local
     flows from the site and to convey runoff from external catchments around the site




                                              Figure 2-2 Proposed Development




Noosa Shire Council                                                                                   2
M25-0045Rpt – 244035– February 2025

Page 6

     3.0    FLOOD IMPACT ASSESSMENT

     3.1    Flood Modelling

     Flood modelling of the site was undertaken using TUFLOW, a 1D/2D hydraulic modelling software package, to ensure
     stormwater flows from upstream catchments external to the site can be conveyed through the site and to demonstrate
     that no unacceptable impacts will occur on surrounding properties as a result of the proposed development.

     Scenarios modelled as part of this investigation include:
        • Existing Case Scenario – modelling the undeveloped conditions.
        • Developed Case Scenario – modelling the site with an updated Digital Elevation Model (DEM), upgraded
             hydraulic structure at the road crossing the large clean water drain and updated Manning’s roughness
             coefficients and soil infiltration rates to represent the proposed development layout.

     Modelling was undertaken for the 50%, 10% and 1% and 1% climate change Annual Exceedance Probability (AEP)
     events.

     3.2    Hydrology

     A “Rain on Grid” modelling approach was adopted for this overland flow study and as such, no traditional hydrological
     modelling was required. The total catchment area adopted for this assessment was approximately 287 ha. Refer to
     Figure 3-1 for the overall extent of the 2D flood model and the quadtree extent for the model. This is discussed further
     in Section 3.11.




                                          Figure 3-1 Model Extent with 1m Contours




Noosa Shire Council                                                                                     3
M25-0045Rpt – 244035– February 2025

Page 7

     3.3    Temporal Patterns and Rainfall Intensity

     Temporal patterns are based on Australian Rainfall and Runoff (ARR) 2019 Ensemble Storm Temporal Patterns and
     have been sourced directly from ARR data hub. Rainfall intensities are typical for this area and have been sourced
     directly from the Bureau of Meteorology (BOM).

     3.4    Rainfall Durations

     Initially, flood modelling was undertaken for all rainfall durations ranging from 10 minutes to 360 minutes. This range
     of durations was simulated to ensure the critical durations for the catchment were captured. From reviewing the
     results, it was determined that the critical durations experienced at the proposed development site and immediately
     surrounding the site ranged from 20 minutes up to 120 minutes and therefore these were the durations adopted for
     this analysis.

     3.5    Rainfall Losses

     Adopted rainfall losses were sourced from ARR Data Hub. Rainfall losses for this region are as follows:
     •       Initial Losses – 27 mm; and
     •       Continuing Losses – 2.6 mm/hr.


     3.6    Pre-Burst Rainfall

     Rainfall losses adopted for the model are for complete storms. As such, pre-burst depths have been subtracted from
     the adopted initial losses to get the correct storm burst initial losses.
     From a review of the median and 75% pre-burst depths, it was concluded that the median pre-burst depths were not
     appropriate for this investigation, particularly given that the outcome of this investigation will determine minimum
     floor levels for residential properties. As such, adopting the 75% pre burst depths was considered more appropriate
     for this investigation.

     3.7    Areal Reduction Factor

     ARR 2019 guidelines recommend adopting Areal Reduction Factors (ARFs) for catchments greater than 1 km2. Given
     that the associated catchment area modelled as part of this simulation is approximately 2.87 km2, ARFs were adopted
     for this analysis. Refer to Table 3-1 for adopted ARFs.

                                                 Table 3-1 – Areal Reduction Factors

                                            Dur                    AEP (%)
                                           (min)         50          10                1
                                            20         0.975        0.973         0.970
                                            25         0.978        0.976         0.973
                                            30         0.980        0.978         0.974
                                            45         0.984        0.981         0.978
                                            60         0.986        0.983         0.979
                                            90         0.989        0.986         0.981
                                           120         0.991        0.987         0.981




Noosa Shire Council                                                                                    4
M25-0045Rpt – 244035– February 2025

Page 8

     3.8    Manning’s n Values

     Manning’s n roughness coefficient’s have been manually delineated for the entire contributing catchment. Refer to
     Appendix B for the Manning’s Roughness Coefficient Maps. Land uses and corresponding manning’s roughness
     coefficients for the hydraulic model are as follows:
     •        0.018 – Roads
     •        0.075 – Trees / Bushland
     •        0.05 – Grassland
     •        0.3 – Roof
     •        0.03 – Unsealed road
     •        0.015 – Water body

     3.9    Fraction Impervious

     The fraction impervious values adopted for each land use are as follows:
     •       Roads – 100%
     •       Trees / Bushland - 0%
     •       Grassland – 0%
     •       Roof– 100%
     •       Unsealed road – 50%
     •       Water body – 100%

     3.10   Topography

     Topography for the full extent of the 2D hydraulic model was created using 2015/2023 LIDAR and survey within the
     development site. The existing surface topography is shown in Figure 3-2.
     It is important to note that Council plans to construct an earthworks pad on the area to the east (labelled as RRA Pad).
     Further, the existing HES Basin is being relocated to the north-western corner of the pad. As requested by Council,
     the RRA Pad and relocated HES basin has been assumed to be present in the both the existing and developed case
     scenarios for modelling purposes.




                                     Figure 3-2 Existing Site Topography with 0.5m contours




Noosa Shire Council                                                                                     5
M25-0045Rpt – 244035– February 2025

Page 9

     3.11    Grid Cell Size

     A 16-metre hydraulic grid cell size was adopted for the model generally. A one metres hydraulic grid cell size was adopted
     for the area of work within the site and a four to eight-metre grid cell size for the surrounding areas using the TUFLOW
     Quadtree add on which precisely simulates hydraulics of stormwater runoff within the area of interest. Refer to Figure 3-1
     for the Quadtree extent.

     The adopted hydraulic grid cell sizes have been deemed sufficient to accurately represent flood flows and levels throughout
     the hydraulic model.

     3.12    Tailwater Conditions

     A tailwater condition with an average downstream slope of 0.5% has been adopted at the outlet of the hydraulic
     model. The downstream boundary of the model is approximately 500 m downstream from the outlet of the site. This
     ensures negligible influence from the downstream tailwater condition.

     3.13    Hydraulic Structures

     Hydraulic structures adopted for this assessment have been modelled as 1D elements in the hydraulic model. All 1D element
     locations are shown in Figure 3-3, Figure 3-4 and Figure 3-5.

     The existing culvert information (e.g., size, length, material and invert levels) was based on available survey information.
     However, the survey information for the culverts on Eumundi-Noosa Rd and Emu Mountain Rd only included downstream
     invert levels. Therefore, the upstream invert levels were estimated by assuming a culvert grade of approximately 0.5%. If
     there are any major discrepancies it is recommended that the culverts be surveyed and the information provided to Covey
     Associates for determination.

     The proposed culvert information was based on the engineer plans as shown in Appendix A. Refer to Table 3-2 for further
     details of the existing hydraulic structures. Refer to Table 3-3 for further details on the developed hydraulic structures.

     The 1D elements included a 30% blockage factor in accordance with QUDM (2017) and a Manning’s n of 0.013 was applied.
     The hydraulic model did not include on-site detention tanks.




                                          Figure 3-3 Hydraulic Structure Locations – North

Noosa Shire Council                                                                                        6
M25-0045Rpt – 244035– February 2025

Page 10

                                      Figure 3-4 Hydraulic Structure Locations – South




                                  Figure 3-5 Hydraulic Structure Locations – East




Noosa Shire Council                                                                      7
M25-0045Rpt – 244035– February 2025

Page 11

                                         Table 3-2 Existing Hydraulic Structures
                            Type            Upstream      Downstream
                                           Invert Level   Invert Level        Size     No. of   Length
                  ID      C=circular
                                             (m AHD)        (m AHD)          (mm)      Pipes     (m)
                         R=box culvert
                 A01          C               15.464         15.262           600        1       17.3
                  B1          C               15.538         15.291           600        2       12.3
                  C1          C               15.526         15.394           600        1       11.9
                  D1          C               12.972         12.574           450        4       12.3
                  E1          C               14.185         12.849           450        1       26.2
                  G1          C               13.393         13.363           500        1       9.7
                  G2          C               13.716         13.652           450        1       4.7
                  T1          C               20.05           19.86           600        1       30.8
                  T2          C               21.384         21.234           525        1       14.5
                  T3          C               18.722         18.572           900        2       31.1
                  T4          R               18.41          18.262        900x300       1       13.9
                  T5          C               18.033         17.883           375        1       12.7
                  T6          C               17.164         17.014           375        1       19.2
                  T7          C               15.15          14.993           375        1       12.0
                 T11          C               23.05          22.899           450        2       16.3
                 T12          C               23.156         23.589           500        1       12.6
                 T13          C               23.84           23.59           375        1       7.3
                  H1          R               16.798         16.735        1200x400      1       14.8



                                         Table 3-3 Developed Hydraulic Structures

                            Type            Upstream      Downstream
                                                                                       No. of   Length
                   ID     C=circular       Invert Level   Invert Level     Size (mm)
                                                                                       Pipes      (m)
                         R=box culvert       (m AHD)        (m AHD)
                 DEV01        R               12.25          12.20        2100x1500      6       9.9




Noosa Shire Council                                                                             8
M25-0045Rpt – 244035– February 2025

Page 12

     3.14   Developed Case Scenario

     The changes to the developed case scenario included:
         •      A design TIN to represent finished elevation levels for the proposed development site. Refer to Figure 3-6
                for developed case topography adopted for the model;
         •      Added a set of culverts for the road crossing at the existing clean water drain as detailed in Section 3.13;
         •      Update the impervious area to represent the proposed development site; and
         •      Updated Manning’s ‘n’ roughness coefficients and soil infiltration rates based on values shown in
                developed model Manning’s maps in Appendix B.




                                  Figure 3-6 Developed Site Topography with 0.5m contours

     3.15   Results

     Results from all modelled scenarios were exported and peak water surface levels, depths, velocities and hazards have
     been mapped to demonstrate conveyance within the overland flow paths. A comparison between the existing and
     developed peak water surface levels, velocities and hazards was undertaken and all scenarios were mapped to ensure
     no unacceptable offsite impacts were experienced and ensure risk and flood hazard will be appropriately managed.
     Refer to the Flood Maps in Appendix C for further detail.

     Generally, it was demonstrated that the existing and developed overland flow paths have an adequate conveyance of
     overland flow from upstream external catchments for all simulated events. In the developed scenario, during the 1%
     AEP climate change event, the water surface level on the western internal roadways increased between 50 – 100 mm.
     However, this flow is safely conveyed through the site without inundating the proposed buildings and discharges to
     the channel to the east (clean water channel). In addition, the hazard (depth x velocity) on the internal roads is
     acceptable (< 0.6 m2/s).

     An increase of water level greater than 100 mm is noted immediately upstream of the proposed culverts (DEV01). This
     is expected as the proposed road crossing the channel will cause head loss at this location as the flow enters the
     culverts. Further upstream in the channel the water surface level decreased by up to 50 mm due to the inclusion of
     the culverts. The results also demonstrated that the road crossing has an immunity up to the 1% AEP climate change
     event.



Noosa Shire Council                                                                                    9
M25-0045Rpt – 244035– February 2025

Page 13

     The flood mapping demonstrated that there were no offsite increases in peak water surface level, depth, velocity or
     hazard as a result of the proposed development. Further, as the proposed development area (2.24 ha) is much smaller
     than the overall catchment (287 ha), the minor increase in the fraction impervious has a negligible effect on the overall
     catchment peak discharges, as demonstrated by the flood mapping. Further, as the proposed development has a
     fraction impervious higher than the overall catchment and is located closer to the downstream boundary (outlet) the
     peak discharge will arrive at the outlet much sooner than the overall catchment. Therefore, no detention is required
     for the proposed development.

     Based on a review of the results shown in the flood maps in Appendix C, it can be concluded that the proposed
     development will not create a nuisance or interfere with the use or enjoyment of any land surrounding the proposed
     development site.




Noosa Shire Council                                                                                     10
M25-0045Rpt – 244035– February 2025

Page 14

     4.0    CONCLUSION
     Covey Associates has been engaged by Noosa Council to provide a Flood Impact Assessment for a Recycle and Transfer
     Station Centre and associated infrastructure at 561 Noosa-Eumundi Rd, Doonan.

     Ensemble storm hydraulic (TUFLOW) flood modelling in accordance with ARR 2019 guidelines was undertaken for
     existing and developed case scenarios for the 50%, 10%, 1% and 1% climate change Annual Exceedance Probability
     (AEP) events.

     The flood mapping demonstrated that generally the on-site overland flow paths adequately conveyed both internal
     and external catchment flows. Further, as a result of the proposed development, there is a negligible change in peak
     water level, depth, velocity and hazard on the surrounding properties for all modelled AEPs.

     Through this assessment, it has been demonstrated that the proposed development and associated infrastructure will
     not result in any actionable nuisance to any of the surrounding properties or infrastructure with regards to overland
     flow. Further, based on the results of this study, on-site detention is not required for the development.

     Sufficient consideration of stormwater water quantity controls has been demonstrated by:
     •        Compliance with the requirements of the Noosa Plan (2020);
     •        Queensland State Planning Policy (2017); and
     •        Compliance with QUDM (2017).

     5.0    References
     Department of State Development, Infrastructure and Planning (2017) State Planning Policy. Brisbane, Queensland.

     Institute of Public Works Engineering Australia, Queensland Division Ltd (2017) Queensland Urban Drainage Manual,
     Fourth Edition.

     Noosa Shire Council (2020) Noosa Plan




Noosa Shire Council                                                                                  11
M25-0045Rpt – 244035– February 2025

Page 15

APPENDIX A
SITE PLANS

Page 16

                                                                                                                                                                                                                                                                                                                                                                                                                  IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                  EXISTING 6.0 m DOUBLE
                     LEGEND                                                                                                                                       GATE ENTRANCE                                                                                                           7 x CARPARKING BAYS
                                                                                                                                                                                                                                                                                          (5.4 m x 2.6 m)
                                                                                                                                                                                                                                                                                                                                                                                                              CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                                                                             AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                                                                                ALL EXISTING SERVICES PRIOR TO THE
                     EXISTING CONTOURS                                                            3.0
                                                                                                                                                                                                                                                                                                                                                                                                                  COMMENCEMENT OF EXCAVATION
                     EXISTING PAVEMENT




                                                                                                                                                                                                                                                                                                              5.4
                     PROPOSED EDGE OF BITUMEN

                     PROPOSED PAVEMENT WIDENING
                                                                                                                                                                                                                                                                                                 2.6
                     PROPOSED LANDSCAPING

                     PROPOSED DRIVEWAY (ARCHITECT)

                     PROPOSED DESIGN (ARCHITECT)                                                                                                                                                           MATCH EXISTING 6.6 m CARRIAGEWAY
                                                                                                                                                                                                           (3.0 m LANE + 0.3 m SHOULDER)

                                                                                                                                                                                                                                                                                                         CLEANAWAY DEPOT



                                                                                                                                                                                                                                                                                                                                 4 x CARPARKING BAYS
                                                                                                                                                                                                                                                                                                                                 (5.4 m x 2.6 m)

                                                                                                                                                                                                                                                                                 SECURITY GATE                            SECURITY GATE

                                                                                                                               8.0 m SECURITY GATE
                                                                                                                               ACCESS UNDER DIRECTION ONLY




                                                                                                                                                                                                                                                       4.0




                                                                                                                                                                                                                                                                                                                                            5.4
                                                                                                                                                                                                                                                       4.0
                                                                                                                                                                                                                                                                                                                                                        2.6
                                                                                                                  3.0
                                                                                                                  3.5




                                                                    DELIVERY / COLLECTION ZONE

                                                                                                                                                                                                                                                                                                                                                                                                    INDICATIVE BIO-BASIN LOCATION,
                                                                                                                                                                                                                                                                                                                                                                                                    CIRCULATING CARRIAGEWAY GRADES
                                                                                                                                                                                                                                                                                                                                                                                                    TOWARDS BASINS
                                                                                                                                                                                                                                                                                                                                                          10.8                        5.4
                                                                                                                                                                                                                                                                                                                                                                                                    [NOM. 21.5 m² FILTER AREA]




                                                                                                                                                                                                                                                                                                                                                                             2.6
                                                                                                                                                                                                                                                                                                                                      2.6
                                              TRANSFER STATION BUILDING
                                                  [NOM. FFL RL 15.500]                                                                                                                                                                                                                                                                            5.4            5.4                                      7 x CARPARKING BAYS
                                                                                                                                                      4.5
                                                                                                                                                                                                                                                                                                                                                                                                          (5.4 m x 2.6 m)
                                                                                                                                                      MIN.




                                                                                                                                                                                                                                                                                                                                      2.6
                                                                                                                                                                                                                                                                                          REVIVA CENTRE
JOINS SHEET C202




                                                                                                                                                                                                                                                                                        [NOM. FFL RL 15.100]
                                                                                                                                                                                                                                                                                                                                8.0                                    8.0



                                                                                                                                                                                                                                                                                                                                                                                                    INDICATIVE BIO-BASIN LOCATION,
                                                                                                                                                                              EXIT CARRIAGEWAY FOR STAFF AND                                                                                                                                                                                        CIRCULATING CARRIAGEWAY GRADES
                                                                                                                                                                              MRV (8.8 m) TRUCKS                                                                                                                                                                                                    TOWARDS BASINS
                                                                                                                                                                                                                                                                                                                                                                                                    [NOM. 21.5 m² FILTER AREA]




                                                                                                                                                                                                                                                                                                                                                         10.0
                                                                                                                                                                                                                REVIVA SALES YARD


                                                                                                                                                                                                                                                                                                                                                                         DROP OFF / PICK UP ZONE
                                                                                                                                                                        FORKLIFT ACCESS ONLY
                                                                                                                                                                        (NO PUBLIC USE)
JOINS SHEET C202




                                                                                                                                                                                               MATCH EXISTING 6.6 m CARRIAGEWAY
                                                                                                                                                                                               (3.0 m LANE + 0.3 m SHOULDER)



                                                                                                                                                                                            INDICATIVE BIO-BASIN LOCATION
                                                                                                                                                                                            [NOM. 92.0 m² FILTER AREA]                                 EXISTING BIO-BASIN LOCATION TO
                                                                                                                                                                                                                                                       BE RETAINED AND UTILISED FOR
                                                                                                                                                                                                                                                       PROPOSED WORKS
                                                                                                                                                                GATE




                                                                                                                                                                                                                                                       [NOM. 92.0 m² FILTER AREA]
                                                                                                                 8.0 m SECURITY GATE
                                                                                                                                                             SECURITY




                                                                                                                 ACCESS UNDER DIRECTION ONLY
                                                                                                                                                                                                                                                                                                                                                                                                              Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                                                                              Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                                                                              Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                                                                              Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                                         SCALE 1:250 (A1) - 1:500 (A3)        the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                                                                              services are to be confirmed and protected on site by the
                                                                                                                                       JOINS SHEET C202                                                                                                                                                                                                                                                       contractor prior to commencement of works.

                                                                                                                                                                                Approved
Checked -               CJT                                                                                                                                                                                                          Drawing title -                                              Project -   DOONAN RESOURCE                           Site -                                               Project No.     244035       Sheet No.             C201
Design -              CJT          Drawn -     CJT
                                                                                                                                                                                                                                     GENERAL ARRANGEMENT SHEET 1                                              RECOVERY REDEVELOPMENT                    561 EUMUNDI-NOOSA ROAD,                              Digital Ref :   C200 SITE LAYOUTS        Issue :       A
Scales -              AS SHOWN                                                                                                                                                  COVEY ASSOCIATES PTY LTD     124 DUPORTH AVENUE                                                                   Client -
                                                                                                                                                                                                                                                                                                              NOOSA SHIRE COUNCIL                       DOONAN                                                This Document is copyright and shall not be copied
                                                                A    10.02.2025   PRELIMINARY ISSUE                      CJT
                                                                                                                                                                                ABN 59 137 305 992           PO BOX 16                                                                                                                                                                                        without written approval, nor shall it be used except
Document Stage -                   PRELIMINARY                                                                                                                                  (07) 5443 7777               MAROOCHYDORE QLD 4558                                                                                                                                                                            for the Development and the Site Specified.
                                                               Issue Date                       Description             By                                                      [email protected]
                   c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C200 SITE LAYOUTS.dwg                                                                                                                                                                                                                                                                           Plot 11 February 2025 - 8:55 PM

Page 17

                                                                                                                                                                                                                                                                                                                       JOINS SHEET C201
                                                                                                                                                                                                                                                                                                                                                                                                       IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                                                                   CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                                                                  AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                                                                     ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                                                                                       COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                PUBLIC ACCESS TO RESOURCE RECOVERY




                                                                                                                                                                                                                                                                                                                                                                                      3.0
                                                                                                                                                                                                WASTE VEHICLE ACCESS ONLY




                                                                                                                                                                                                                                                                                                                                                                                      3.5
                                                                                                                                                                                                                                                                                                                                               DELIVERY / COLLECTION ZONE




                                                                                                                                                                                                                                                                                                                                                                                                                                                              JOINS SHEET C201
                                                                                                                                                                                                                                                            7.0
                                                                                                                                                                                                                                                      PUBLIC ACCESS
                                                                                                                                                                                                                                                      TO RESOURCE
                                                                                                                                                                                                                                                        RECOVERY
                                                                                                                                                                                                                                                                                                                                                       TRANSFER STATION BUILDING
                                                                                                                                                                                                                                                                                                                                                           [NOM. FFL RL 15.500]




                                                                                                                                                                                                                                                                                      DRIVE THRU RESOURCE
                                                                                                                                                                                                                                        5.0




                                                                                                                                                                                                                                                             12.0 (4 x 3.0 m LANES)
                                                                                                                                                                                                                                      WASTE




                                                                                                                                                                                                                                                                                          SORTING AREA
                                                                                                                                                                                                                                     VEHICLES
                                                                                                                                                                                                                                       ONLY




                                                                                                                                                                                                                                                                                                                               LOWER HARDSTAND AND RESOURCE RECOVERY BIN PAD
                                                                                                                                                                                                                                                                                                                                    WASTE AND STAFF VEHICLE ACCESS ONLY
                                                                                                                                                                                                                                                                                                                                                                                                                22 x CARPARKING BAYS
                                                                                                                                                                                                                                                                                                                                                                                                                (5.4 m x 2.6 m)
                                                                                                                                                                                                                                                                                                                                         2.6




                                                                                                                                                                                                                                                                                                                                                 5.4
                                                                                                                                                                                                                                                                                                                                                       INDICATIVE BIO-BASIN LOCATION
                                                                                                                                                                                                                                                                                                                                                       [NOM. 94.0 m² FILTER AREA]
JOINS SHEET C203




                                                                                                                                                                                                                                                                                                                                                                                                  Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                                                                  Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                                                                  Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                                                                  Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                                SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                                                                  services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                            JOINS SHEET C203                                                                      contractor prior to commencement of works.

                                                                                                                                    Approved
Checked -               CJT                                                                                                                                                            Drawing title -                                          Project -   DOONAN RESOURCE                                                     Site -                                                          Project No.     244035       Sheet No.             C202
Design -              CJT          Drawn -     CJT
                                                                                                                                                                                       GENERAL ARRANGEMENT SHEET 2                                          RECOVERY REDEVELOPMENT                                              561 EUMUNDI-NOOSA ROAD,                                         Digital Ref :   C200 SITE LAYOUTS        Issue :        A
Scales -              AS SHOWN                                                                                                      COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                                               Client -
                                                                                                                                                                                                                                                            NOOSA SHIRE COUNCIL                                                 DOONAN                                                            This Document is copyright and shall not be copied
                                                                A   10.02.2025   PRELIMINARY ISSUE                       CJT
                                                                                                                                    ABN 59 137 305 992         PO BOX 16                                                                                                                                                                                                                          without written approval, nor shall it be used except
Document Stage -                   PRELIMINARY                                                                                      (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                                                                                                              for the Development and the Site Specified.
                                                               Issue Date                      Description              By          [email protected]
                   c:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C200 SITE LAYOUTS.dwg                                                                                                                                                                                                                                                               Plot 11 February 2025 - 8:55 PM

Page 18

                                                                                                                                                                                                                                                                                                                     IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                 CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                   ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                     COMMENCEMENT OF EXCAVATION


                                                                                                                                                                                                                                                                                       BULK EARTHWORKS NOTES
                                                                                                                                                                                                                                                                                       1. STRIP ALL TOPSOIL CONTAINING ORGANIC MATTER TO A DEPTH OF
                                                                                                                                                                                                                                                                                       100mm AND SPOIL TO SUITABLE STOCKPILE AREA. REMOVE RUBBLE
                                                                                                                                                                                                                                                                                       MATERIAL, OVERSATURATED MATERIALS, ORGANIC MATTER AND
                                                                                                                                                                                                                                                                                       OTHER UNSUITABLE MATERIAL FROM THE SITE.
                                                                                                                                                                                                                                                                                       2. EARTHWORKS ON ALLOTMENTS SHALL BE CARRIED OUT IN
                                                                                                                                                                                                                                                                                       ACCORDANCE WITH AUSTRALIAN STANDARDS AS3798 - GUIDELINES
                                                                                                                                                                                                                                                                                       ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL
                                                                                                                                                                                                                                                                                       DEVELOPMENTS - COMPACTION TO 95% STANDARD (AS1289E1.1).
                                                                                                                                                                                                                                                                                       3. SIMILARLY, SUBGRADE COMPACTION TO 98% STANDARD
                                                                                                                                                                                                                                                                                       (AS1289E1.1). REMOVE ANY SOFT OR COMPRESSIBLE ZONES AND
                                                                                                                                                                                                                SHEET C302                                                             REPLACE WITH SUITABLE MATERIAL.
                                                                                                                                                                                                                                                                                       4. SUPERVISION, INSPECTION & TESTING SHALL BE CARRIED OUT TO
                                                                                                                                                                                                                                                                                       LEVEL 1 STANDARD U.N.O. FREQUENCY OF COMPACTION TESTS ARE
                                                                                                                                                                                                                                                                                       AS FOLLOWS:

                                                                                                                                                                                                                                                                                                      LOCATION                             FREQUENCY
                                                                                                                                                                                17                                                               16
                                                                                                                                                                                                                                                                                        FINISHED LEVEL OR ROAD SUBGRADE (IN
                                                                                                                                                                                                                                                                                                                                               1 per 100 m
                                                                                                                                                                                                                                                                                        CUT OR FILL)
                                                                                                                                                                                                                                                                                        ALLOTMENT FILL WHERE DEPTH 300 - 500mm                  1 per LOT
                                                                                                                      SHEET C301                                                                                                                                                        ALLOTMENT FILL WHERE DEPTH > 500mm                 1 per LOT/500mm
                                                                                                                                                                                16
                                                                                                                                                                                                                                                                                        LEVEL OF INSPECTION FOR ALLOTMENT FILL                   LEVEL 1
                                                                                                                                                                                                           16
                                                                                                                                                                                                                                                                                       5. QUALITY TESTS OF IMPORTED MATERIAL ARE REQUIRED AT A RATE
                                                                                                                                                                                                                                                                                       OF 1 TEST PER 400 cu m OR PART THEREOF.




                                                                                                                                                                           16
                                                                                                                                                                                                                                                 15
                                                                                                                                                                                                                                                                                       6. IMPORTED FILL MATERIAL SHALL BE LOW PLASTICITY GRANULAR
                                                                                                                                                                                                                                                                                       FILLING. PLACE FILL TO THE BUILDING PLATFORM AREAS IN LAYERS
                                                                                                                                                                                                                                                                                       OF LOOSE THICKNESS APPROPRIATE TO THE TYPE OF MACHINERY
                                                                                                                                                                                                                                                      15
                                                                                                                                                                                                                                                                                       BEING USED AND NOT GREATER THAN 250mm. ANY UNSUITABLE
                                                                                      16                                                                                                                                                                                               MATERIAL SHALL BE IDENTIFIED, REMOVE AND REPLACE AS
                                                                                                                                                                                 15
                                                                                                                                                                                                                                                                                       SPECIFIED.
                                                                              16
                                                                                                                                                                                                                                                                                       7. ALL TESTING OF EARTHWORKS SHALL BE CARRIED OUT AT THE
                         16




                                                                                                                                                                                                                                                                                       CONTRACTORS EXPENSE UNLESS NOTED OTHERWISE.

                                                                                                                                                                                                                                                                                       STOCKPILE NOTE
                                                     16
                                                                                                                                                                                                                                                                                       1. STOCKPILES OF CONSTRUCTION AND LANDSCAPING MATERIALS,
                                                                                                                                                                                                                                                                                       AND OTHER SITE DEBRIS, SHALL BE LOCATED CLEAR FROM ANY
                                                                                                                                                                                                                                                                                       POSITION FROM WHICH IT COULD BE WASHED ONTO ANY FOOTPATH,




                                                                                                                                                                                15
                                                                                                                                                                                                                                         15                                            NATURE STRIP, ROADWAY, OR INTO ANY DRAIN OR WATERCOURSE.
                                                                     16




                                                                                                                                                                                                                                                                                       APPROXIMATE CUT/FILL VOLUMES
                                                     15                                                                                                                                                                                                                                1. INCLUDES ALL QUANTITIES BETWEEN EXISTING (LESS 150) AND
                                                                                                                                                                                                                                                                                       FINISHED SURFACES (LESS 150). PAVING BOXING QUANTITY (300 DEEP)
                                                                                                                                                                                                                                                                                       NOT INCLUDED.
                                                                                                                           16


                                                                                                                                                                                                                                                                                       TOTAL CUT                                            XXX.XXXm3

                                                          15
                                                                                                                                                                                                                                                                                       TOTAL FILL                                           XXX.XXXm3


                                                                                                                                                                                                                                                                                       BULK EARTHWORKS LEGEND (100mm INC.)
                                                                                           14
                                                                                                                                15
                                                                                                                                                                                                                                                                                                                                          CUT                FILL

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.00 - 0.10m
                                                                                                                                     14




                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.10 - 0.20m

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.20 - 0.30m

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.30 - 0.40m

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.40 - 0.50m

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS 0.50 - 0.60m

                                                                                                                                                                                                                                                                                       PROPOSED EARTHWORKS > 0.60m
                                                                                                                                                                15




                                                                                                                                                                                                                                                                                       EXISTING CONTOURS                                               3.0

                                                                                                                                                                                                                                                                                       DESIGN CONTOURS                                                 3.0




                                                                                                                                                                                                                                                                                                                SCALE 1:500 (A1) - 1:1000 (A3)


                                                                                                                                                                                                                                                                                                                Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                contractor prior to commencement of works.

                                                                                                                                          Approved
Checked -    CJT                                                                                                                                                                             Drawing title -                 Project -   DOONAN WASTE TRANSFER       Site -                                   Project No.     244035       Sheet No.             C300
Design -    JIC         Drawn -    JIC
                                                                                                                                                                                             BULK EARTHWORKS OVERVIEW                    STATION - TRAFFIC CONCEPT   561 EUMUNDI-NOOSA ROAD,                  Digital Ref :   C300 BULK EARTHWORKS     Issue :        B
Scales -    AS SHOWN                                 B    20/12/24   PRELIMINARY                                JIC                       COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                      Client -
                                                                                                                                                                                                                                         NOOSA SHIRE COUNCIL         DOONAN                                     This Document is copyright and shall not be copied
                                                     A    28/11/24   PRELIMINARY                                JIC
                                                                                                                                          ABN 59 137 305 992         PO BOX 16                                                                                                                                  without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                        (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                      for the Development and the Site Specified.
                                                    Issue Date                     Description                 By                         [email protected]
       c:\12dS\data\12dserver\244035_3605\design (covey)\drawings - concept design\uncontrolled\C300 BULK EARTHWORKS.dwg                                                                                                                                                                                      Plot 12 February 2025 - 11:09 AM

Page 19

                                                                                                                                                                                                                                                                       16
                                                                                                                                                                                                                                                                                                                         IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                     CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                    AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                       ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                         COMMENCEMENT OF EXCAVATION




                                                                                                                                16

                                                                                                                                                                                                                                                                             15
                                                                                                                           16
                   16




                                                                               16




                                                                                                                                                                                                                                                                            15
                                                                                                       16




                                                                              15




                                                                                                                                                                     16




                                                                                      15




                                                                                                                                     14
                                                                                                                                                                          15




                                                                                                                                                                                                               14
                                                                                                                                                                                                                                                                                        BULK EARTHWORKS LEGEND (100mm INC.)
                                                                                                                                                                                                                                                                                                                                         CUT                FILL

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.00 - 0.10m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.10 - 0.20m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.20 - 0.30m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.30 - 0.40m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.40 - 0.50m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS 0.50 - 0.60m

                                                                                                                                                                                                                                                                                        PROPOSED EARTHWORKS > 0.60m




                                                                                                                                                                                                                                                         15
                                                                                                                                                                                                                                                                                        EXISTING CONTOURS                                             3.0

                                                                                                                                                                                                                                                                                        DESIGN CONTOURS                                               3.0

                                                                                                                                                                                                                                                                                                                    Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                    Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                    Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                    Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                  SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                    services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                    contractor prior to commencement of works.

                                                                                                                                          Approved
Checked -    CJT                                                                                                                                                                             Drawing title -           Project -   DOONAN RESOURCE            Site -                                              Project No.     244035       Sheet No.              C301
Design -    CJT         Drawn -    CJT
                                                                                                                                                                                             BULK EARTHWORKS SHEET 1               RECOVERY REDEVELOPMENT     561 EUMUNDI-NOOSA ROAD,                             Digital Ref :   C300 BULK EARTHWORKS      Issue :       A
Scales -    AS SHOWN                                                                                                                      COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                Client -
                                                                                                                                                                                                                                   NOOSA SHIRE COUNCIL        DOONAN                                                This Document is copyright and shall not be copied
                                                     A   10.02.2025   PRELIMINARY ISSUE                        CJT
                                                                                                                                          ABN 59 137 305 992         PO BOX 16                                                                                                                                      without written approval, nor shall it be used except
Document Stage -        PRELIMINARY                                                                                                       (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                          for the Development and the Site Specified.
                                                    Issue Date                      Description                By                         [email protected]
       c:\12dS\data\12dserver\244035_3605\design (covey)\drawings - concept design\uncontrolled\C300 BULK EARTHWORKS.dwg                                                                                                                                                                                          Plot 12 February 2025 - 11:09 AM

Page 20

                                                                                                                                                                                                                                                                                                                           IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                       CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                      AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                         ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                           COMMENCEMENT OF EXCAVATION

                                                                                                                                     17                                                                                                                           16




                                                                                                                                    16


                                                                                                                                                                16




                                                                                                                           16
                                                                                                                                                                                                                                                                  15




                                                                                                                                                                                                                                                                            15



                                                                                                                                       15
                                                                                                                                    15




                                                                                                                                                                                                                                                  15




                                                                                                                                                                                                                                                                                          BULK EARTHWORKS LEGEND (100mm INC.)
                                                                                                                                                                                                                                                                                                                                           CUT                FILL

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.00 - 0.10m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.10 - 0.20m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.20 - 0.30m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.30 - 0.40m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.40 - 0.50m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS 0.50 - 0.60m

                                                                                                                                                                                                                                                                                          PROPOSED EARTHWORKS > 0.60m

                                                                                                                                                                                                                                                                                          EXISTING CONTOURS                                             3.0

                                                                                                                                                                                                                                                                                          DESIGN CONTOURS                                               3.0

                                                                                                                                                                                                                                                                                                                      Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                      Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                      Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                      Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                    SCALE 1:250 (A1) - 1:500 (A3)     the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                      services are to be confirmed and protected on site by the
                                                                                                                                JOINS SHEET C202                                                                                                                                                                      contractor prior to commencement of works.

                                                                                                                                                   Approved
Checked -    CJT                                                                                                                                                                                      Drawing title -           Project -   DOONAN RESOURCE            Site -                                       Project No.     244035       Sheet No.              C302
Design -    CJT         Drawn -    CJT
                                                                                                                                                                                                      BULK EARTHWORKS SHEET 2               RECOVERY REDEVELOPMENT     561 EUMUNDI-NOOSA ROAD,                      Digital Ref :   C300 BULK EARTHWORKS      Issue :       A
Scales -    AS SHOWN                                                                                                                               COVEY ASSOCIATES PTY LTD   124 DUPORTH AVENUE                                Client -
                                                                                                                                                                                                                                            NOOSA SHIRE COUNCIL        DOONAN                                         This Document is copyright and shall not be copied
                                                     A   10.02.2025   PRELIMINARY ISSUE                        CJT
                                                                                                                                                   ABN 59 137 305 992         PO BOX 16                                                                                                                               without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                 (07) 5443 7777             MAROOCHYDORE QLD 4558                                                                                                                   for the Development and the Site Specified.
                                                    Issue Date                      Description                By                                  [email protected]
       c:\12dS\data\12dserver\244035_3605\design (covey)\drawings - concept design\uncontrolled\C300 BULK EARTHWORKS.dwg                                                                                                                                                                                            Plot 12 February 2025 - 11:09 AM

Page 21

APPENDIX B
MANNINGS ‘N ROUGHNESS COEFFICIENTS MAPS

Page 22

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
Manning's n Roughness Coefficients Map

Legend

ao Site Boundary
Cadastral Boundary

Manning's n Roughness Coefficients
Default Grassland (n=0.050)
Road Pavement (n=0.018)
Trees and Bushland (n=0.075)
Grassland (n=0.050)

oO
o
Oo
[1 Roof (n=0.300)
a
Oo

Unsealed Road (n=0.030)
Water Body (n=0.015)

0 100

 

Page 23

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
Manning's n Roughness Coefficients Map

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Manning's n Roughness Coefficients
Default Grassland (n=0.050)
Road Pavement (n=0.018)
Trees and Bushland (n=0.075)

O
a
[JJ Grassland (n=0.050)
o
a
Oo

Roof (n=0.300)
Unsealed Road (n=0.030)
Water Body (n=0.015)

0 100

 

Page 24

APPENDIX C
FLOOD Maps

Page 25

ASSOCIATES PTY LTD
Consulting Engineers

ana 561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
50% AEP
Water Surface Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
| [7] RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

a
A
a

a
~

a
o
Oo
L
L
Oo
O
a
L]
L
LJ
Oo
L
o
a

100

 

Page 26

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
10% AEP
Water Surface Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

8
, o
a
» o
2 Oo
= Ll
s o
Oo
Bo
LJ
O
L] 26
Oo
2 LI
a
Ba

100

 

Page 27

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Sc
1% AEP
Water Surface Level

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary
[7 RRA Pad
—_ 0.5 Water Level Contours

Water Surface Level (m AHD)
i <-6
i c-s
[J 8-10
10-12
12-14
14-16
-18
-20
-22
-24
- 26
- 28
- 30
-32

100

 

Page 28

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
1% AEP te Change
Water Si Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

; o
; a
B
Oo
eo
- U
s o
a
a
L
L
Oo
Oo
LO
o
a

100

 

Page 29

ASSOCIATES PTY LTD
Consulting Engineers

ana 561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
50% AEP
Water Surface Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
| [7] RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

a
A
a

a
~

a
o
Oo
L
L
Oo
O
a
L]
L
LJ
Oo
L
o
a

100

 

Page 30

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
10% AEP
Water Surface Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

8
, o
a
» o
2 Oo
= Ll
s o
Oo
Bo
LJ
O
L] 26
Oo
2 LI
a
Ba

100

 

Page 31

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
1% AEP
Water Surface Level Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)

; o
; a
B
Oo
eo
- U
s o
a
a
L
L
Oo
Oo
LO
o
a

100

 

Page 32

> Emu Mountain; Roads

i)

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
1% AEP Climate Change
Water Surface Level Map

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad
— _ 0.5 Water Level Contours

Water Surface Level (m AHD)
i <-6
i c-s
[J 8-10
10-12
12-14
14-16
16 - 18
18-20

Bh 20-22
[_] 22-24
- 26
-28
- 30
- 32

100

 

Page 33

rr
COVEY

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Sc
50% AEP
Depth Map

 

 

 

 

Legend
ao Site Boundary

‘ Cadastral Boundary
[7 RRA Pad

Depth (m)

[] 00-03

L] 03-06

[] 06-09

0.9 - 1.2

12-15
15-18

[J >18

100

 

Page 34

1

Shas

|
x

—

‘Noosa:

jundi

im
so

se
OF

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
10% AEP
Depth Map

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)

[] 00-03
0.3 - 0.6
0.6 - 0.9
0.9-1.2
12-15
15-18
>18

100

 

Page 35

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
1% AEP
Depth Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)

[] 00-03
L] 03-06
.6 - 0.9
.9- 1.2

100

 

Page 36

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
1% AEP Climate Change
Depth Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)

[] 00-03
L] 03-06
.6 - 0.9
.9- 1.2

100

 

Page 37

rr
COVEY

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
50% AEP
Depth Map

 

 

 

 

Legend
ao Site Boundary

‘ Cadastral Boundary
[7 RRA Pad

Depth (m)

[] 00-03

L] 03-06

[] 06-09

0.9 - 1.2

12-15
15-18

[J >18

100

 

Page 38

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Sceni
10% AEP
Depth Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)

[] 00-03

L] 03-06

[] 06-09
0.9 - 1.2
12-15
15-18

undi'N

|
|

fan

100

 

Page 39

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
1% AEP
Depth Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)

[] 00-03
L] 03-06
.6 - 0.9
.9- 1.2

100

 

Page 40

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Sceni
1% AEP Climate Ct
Depth Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Depth (m)
[] 00-03
L] 03-06
[] 06-09

0.9 - 1.2
12-15
15-18

SO ok

Sa

ad

100

 

Page 41

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Existing Case Scenario
50% AEP
Velocity Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

100

 

Page 42

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
10% AEP
Velocity Map

Legend
ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

100

 

Page 43

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
1% AEP
Velocity Map

Legend
ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

100

 

Page 44

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

ing Case Scenario
1% AEP Climate Change
Velocity Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad
Velocity (m/s)

= = Einu Mountain Road SS

100

 

Page 45

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Scenario
50% AEP
Velocity Map

 

 

 

 

Legend
ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

100

 

Page 46

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
10% AEP
Velocity Map

Legend
ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

100

 

Page 47

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Sceni
1% AEP
Velocity Map

 

 

 

 

Legend
ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Velocity (m/s)
[] <=03
3 - 0.6
6 - 0.9
9 - 1.2
2-15
5-18

100

 

Page 48

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Sceni
1% AEP Climate Ct
Velocity Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

Velocity (m/s)

[] <=03
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
12-15
15-18
1.8-2.1
>21

= = Einu Mountain Road SS

100

 

Page 49

!
3
3)
ce
3
g
3:
3
<
=
e
5
€
5)
a
i

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
50% AEP
Hazard Map

Legend

ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Hazard (d*V)

[i <=06
L] 06-08

100

 

Page 50

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Existing Case Scenario
10% AEP
Hazard Map

Legend

ao Site Boundary
‘ Cadastral Boundary
[7 RRA Pad
Hazard (d*V)
[i <=06
L] 06-08

100

 

Page 51

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

ing Case Sce
1% AEP
Hazard Mi

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad
Hazard (d*V)

100

 

Page 52

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

1,
ing Case Scenario
1% AEP Climate Change
Hazard Map

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad
Hazard (d*V)

 

 

 

 

100

 

Page 53

!
3
3)
ce
3
g
3:
3
<
=
e
5
€
5)
a
i

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
50% AEP
Hazard Map

Legend

ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Hazard (d*V)

[i <=06
L] 06-08

100

 

Page 54

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
10% AEP
Hazard Map

Legend

ao Site Boundary
‘ Cadastral Boundary
[7 RRA Pad
Hazard (d*V)
[i <=06
L] 06-08

100

 

Page 55

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

Developed Case Sceni
1% AEP
Hazard Mi

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad
Hazard (d*V)

100

 

Page 56

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Developed Case Scenario
1% AEP Climate Change
Hazard Map

Legend

ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Hazard (d*V)

 

100

Page 57

ASSOCIATES PTY LTD
Consulting Engineers

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary

-0.05- -0.01
0.01 - 0.01
0.01 - 0.05
0.05 - 0.1

100

 

Page 58

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

10% AEP
Afflux Map

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

-0.05- -0.01
-0.01 - 0.01
0.01 - 0.05
0.05 - 0.1
>01

100

 

Page 59

ASSOCIATES PTY LTD
Consulting Engineers

1% AEP
Afflux Map

Legend

ao Site Boundary
Cadastral Boundary

[7 RRA Pad

 

 

 

 

[J -0.05- -0.01

> (J -0.01 - 0.01
[_] 0.01 - 0.05
[_] 0.05 - 0.1
[ >o.1

100

 

Page 60

ASSOCIATES PTY LTD
Consulting Engineers

4 561 Eumundi-Noosa Road, Doonan

1% AEP Climate Change
Afflux Map

Legend

; ao Site Boundary
Cadastral Boundary

 

 

 

 

-0.05- -0.01
0.01 - 0.01
0.01 - 0.05
0.05 - 0.1

100

 

Page 61

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

Legend

ao Site Boundary
Cadastral Boundary
| [7] RRA Pad

Change in Velocity (m/s)
0

 

100

Page 62

ASSOCIATES PTY LTD
Consulting Engineers

10% AEP
Difference in Velocity Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Change in Velocity (m/s)
0

~~» Emu Mountain Road

 

100

Page 63

ASSOCIATES PTY LTD
Consulting Engineers

1% AEP
Difference in Velocity Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Change in Velocity (m/s)
0

70.5 - -0.1

ne Se
ee =

=~ a

—as

 

100

Page 64

ASSOCIATES PTY LTD
Consulting Engineers

1% AEP Climate Change
Difference in Velocity Map

 

 

 

 

Legend

ao Site Boundary
Cadastral Boundary
[7 RRA Pad

Change in Velocity (m/s)
0

70.5 - -0.1

 

100

Page 65

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Change in Hazard (m/s)

100

 

Page 66

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Change in Hazard (m/s)

100

 

Page 67

ASSOCIATES PTY LTD
Consulting Engineers

561 Eumundi-Noosa Road, Doonan

1% AEP
Difference in Hazard Map

 

 

 

 

Legend
ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Change in Hazard (m/s)

100

 

Page 68

 

 

 

 

ASSOCIATES PTY LTD
Consulting Engineers

ao Site Boundary

Cadastral Boundary
[7 RRA Pad

Change in Hazard (m/s)

100

 

Page 69

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.