Original source · versioned page text
UPDATED DA - Attachment 7 - Flood Impact Assessment
Very large file (259 MB): the original may take a few minutes to open or download. The page text below is quick to read.
The flood mapping demonstrated that there were no offsite increases in peak water surface level, depth, velocity or
hazard as a result of the proposed development. Further, as the proposed development area (2.24 ha) is much smaller
than the overall catchment (287 ha), the minor increase in the fraction impervious has a negligible effect on the overall
catchment peak discharges, as demonstrated by the flood mapping. Further, as the proposed development has a
fraction impervious higher than the overall catchment and is located closer to the downstream boundary (outlet) the
peak discharge will arrive at the outlet much sooner than the overall catchment. Therefore, no detention is required
for the proposed development.
Based on a review of the results shown in the flood maps in Appendix C, it can be concluded that the proposed
development will not create a nuisance or interfere with the use or enjoyment of any land surrounding the proposed
development site.
Noosa Shire Council 10
M25-0045Rpt – 244035– February 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.