Skip to the record
Accept no substitutions.

Original source · versioned page text

SUPERSEDED Reference Document - MCU22/0202

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                         Bushfire Hazard Assessment and Management Plan




                7       References
                Department of Infrastructure‚ Local Govenment and Planning (DILGP). (July 2017). State Planning
                          Policy. Brisbane: Department of Infrastructure, Local Govenment and Planning (DILGP)
                          Retrieved from https://dilgpprd.blob.core.windows.net/general/spp-july-2017.pdf

                DSDMIP. (2019). State Planning Policy State Interest Guidance Material - Natural Hazards, Risk and
                          Resilience - Bushfire, December 2019. Retrieved from
                          https://dsdmipprd.blob.core.windows.net/general/spp-guidance-natural-hazards-risk-
                          resilience-bushfire.pdf

                Leonard, J., & Opie, K. (2017, 2017). Estimating the potential bushfire hazard of vegetation patches
                          and corridors. Retrieved from https://publications.csiro.au/rpr/pub?pid=csiro:EP167343

                Leonard, J., Opie, K., Newnham, G., & Blanchi, R. (2014). A new methodology for State-wide mapping
                          of bushfire prone areas in Queensland. Retrieved from Brisbane:
                          https://www.qfes.qld.gov.au/opendata/Bushfire_Prone_Area_Mapping_Report_5_Feb_2014_
                          Low_Res.pdf

                QFES. (2019). Bushfire Resilient Communities - Technical Reference Guide for the State Planning
                          Policy State Interest 'Natural Hazards, Risk and Resilience - Bushfire', October 2019.
                          Retrieved from https://www.ruralfire.qld.gov.au/Bushfire_Planning/Documents/Bushfire-
                          Resilient-Communities.pdf

                Queensland Fire and Emergency Services. (2020). Catalyst Fire Management System. Retrieved from
                          https://catalyst.qfes.qld.gov.au/

                Queensland Fire and Emergency Services (QFES). (2019). Bushfire Resilient Communities: Technical
                          Reference Guide for the State Planning Policy State Interest 'Natural Hazards, Risk and
                          Resilience' (October 2019). Queensland Fire and Emergency Services Retrieved from
                          https://www.ruralfire.qld.gov.au/Bushfire_Planning/Pages/Bushfire-Resilient-
                          Communities.aspx

                Noosa Council Planning Scheme (2020). Noosa Plan 2020. Retrieved from:

                          https://noo-prod-icon.saas.t1cloud.com/Pages/Plan/Book.aspx?exhibit=Current

                Standards Australia. (2018). AS 3959-2018 Construction of buildings in bushfire-prone areas.
                          Retrieved from Sydney: https://law.resource.org/pub/au/ibr/as.3959.2009.pdf




                                                               PR22428_BHAMP_199 Beddington Road, Doonan           Page 32

Document Set ID: 22623753
Version: 1, Version Date: 17/10/2023
Log in to download the original file

SUPERSEDED Reference Document - MCU22_0202.pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.