Original source · versioned page text
Proposal Report - update
Attached to the e-mail Amended Report and IDAS Forms MCU17/0054.
A mix of planting sizes are also included to provide scale to the building and provide some shading to the carparking areas. Landscaping is also designed to incorporate onsite stormwater treatment in bioretention devices that visually integrate with the landscaping. Pedestrian access ramps are located along all street frontage allowing for equitable pedestrian access to the tenancies in accordance with DDA requirements and minimise conflict points with the carparking areas. Individual signage envelopes are provided above the tenancies to integrate with the building design, as well as a single pylon sign 5m high setback 2.5m from the Hilton Tce and Ernest St road frontages. Waste storage and maneuvering areas are located in the south eastern corner of the site, allowing for suitable access and waste storage requirements. Loading for waste vehicles are proposed to occur between 7am and 9am, so as to not impact on nearby residential uses. The proposed opening hours of the shops and restaurants will normally be between 7am to 10pm seven days a week. However, this may vary depending on the tenant (i.e. a café or bakery may open before, and a restaurant tenant may seek to operate after 10pm). 3. Background The applicant and Council officers held a Prelodgement Meeting on the 12 January 2017, with the subsequent meeting minutes included as Attachment 2. Council requested that ‘prior to lodgement of an application, a Council appointed architect and the designer review the plans to ensure the best outcome for the site and locality given it is a very prominent site at the entrance to Tewantin’. The owner subsequently agreed to engage a Council appointed architect (nra-co-lab) to review the design plans prior to lodgement. The peer review suggested improvements to the overall layout and design. A full copy of the peer-reviewed report with comments addressing the recommended design changes included as Attachment 3. A sketch of the Council appointed architects suggested improvements is included below. The prelodgement meeting also raised issues about the site’s integration with Council’s capital works plans for substantial roadworks along the frontages of the site, including a new roundabout at the Hilton Tce and Ernest Street intersection. The preliminary plan of Council works is included as Attachment 4.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.