Original source · versioned page text
Engineering Services Report
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
HOLTS ROAD
INDICATIVE 10m RADIUS
EXCLUSION ZONE
(TRUCK LOADING POSITION) °
HOLTS ROAD
DESIGN VEHICLES
ee een
edt coax S55-
Fa Eee TTT
_ ~ Se B-Double (26.0m)
— - Overall Length 26.000m
(| | | | | | | | Overall Wid . 2.500m
| . Overall Body Height 4,.300m
CARPARK CARPARK Min Body Ground Clearance 0.540m
Track Width 2.500m
Lock-to-lock time _ . 6,00s
Curb to Curb Turning Radius 15.000m
132
82
es sa oo
— BOWSER) ~ owseRs |
ls ~ = =a one OOO
me | ss hoe ee
16 a7 a
ke BT Ta
Smet AV - Articulated Vehicle
\ Overall Length 19.000m
Z Overall Wid! 2.500m
= Overall Body Height 4.301m
19 ARTICU TED VEHICLE Min Bod y Groun Clearance 9.448m
a m LA tack Width | 500m
We eras Lock-to-lock time 6.00s
a= Curb to Curb Turning Radius 12.500m
' 125
HOLTS ROAD ~~ )
PL
a 5g TH |
HRV - Heavy Rigid Vehicle
Overall Length 12.500m
Overall Wid 2.500m
Overall Body Height 4.300m
Min Body Ground Clearance 0.417m
Track Width 2.500m
Lock-to-lock time 6,00s
Curb to Curb Turning Radius 12.500m
Ir 3 FAST FOOD oct
Some senvice starion
BOWsERS (oy
nucf Para
FAST FOOD sl
‘Rone service starion o
BOWSER (ho) Ta
. sci STATION |.
3 om 5
5 er B99 Vehicle (Realistic min radius) (2094)
180m Overall Length 5.200m
Overall Wid' 1.940m
Overall Body Height 1.878m
Min Body Ground Clearance 0.272m
Track Width 1.840m
a Lock-to-lock time 4.00s
a Curb to Curb Turning Radius 6.250m
m HEAVY RIGID VEHICLE /
RIVE THROUGH LARGE CAR PRELIMINARY
Pe ae 1
a
ISSUED FOR COMMENT ONLY
SORE TRORCT FRONT NOTES ONONAL STE
, j * * 7 pe” TTM CONSULTING PTY LTD LOT 3 TAYLOR COURT, COOROY 16BRT0201 A3
2 Oe oe ABN 65 010 868 621 DRAWING THLE DRAWING NUMBER REVISION
oR BET ce ttm P.0. BOK 1310, COORPAROO BG, QLD, 4151 PRELIMINARY SWEPT PATH ANALYSIS 16BRTO201-02)
1905-16 | LAYOUT AMENDMENTS wT HOLDINGS T: (07) 3327 9500 F: (07) 3327 9501 GROUND LEVEL DATE SHEET
11-05-16 | _ ORIGINAL ISSUE HT - E: [email protected] _ W: www.ttmgroup.com.au 11 MAY 2016 1OF 1
DATE “AMENDMENT DESCRIPTION DRAWN larraoven|
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.