Original source · versioned page text
Engineering Services Report
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
PAPER SIZE A3 Map has been designed to be reproduced in colour All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX EnerG!/Se DBYD map, then ENERGEX shall be contacted immediately. 1300 1400 1500 For Emergency Situations Please call 13 19 62 6200 7076100m N 1464271 \e1464277 7 © U41 sysbs ———} 6200 P14644 6100 491300m E 1400 This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. 1500 UNCONTROLLED COPY energex DBYD Date: 18 May 16 Time: 13.14.47 Requested By: DBYD SCALE 1:1000 20 ° 20m Enquiry No: 52953347 STRIP No: 3 —= + Cable Voltage A Ground Transtormer Less Than 33k Cubicle Transformer Cable Voltage 33kV or Higher t= Ring Main Unit @) Metering Unit © Direer-Lay Wi Link Pillar Q. Conduit [Service Pillar Multi-Section Junction Pillar Duct . ”\ Trench J Pit — mi Cable Joint Cable Tray b> Cable Termination LE] Tunnel Cable Marker x} Street Light Pole li Earth Works Order Polygon [] INDEX TO SHEETS LOCALITY DIAGRAM PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.