Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-03-12 Services & Organisation Committee Agenda

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      12 MARCH 2019


Phase 1   Review existing reports and historical imagery; prepare a discussion paper.
          1.1   Review historical reports
          1.2   Review historical imagery
          1.3   Review performance of existing management strategy
          1.4   Describe the drivers of recent erosion (post 2012)
          1.5   Forecast the rate of erosion and timeframe for a breakthrough
Phase 2   Develop a calibrated coastal processes model
          2.1   Develop estuary model extent and gather input data (model to cover estuary
                shorelines including Munna Point, Gympie Tce, Noosa Sound, North Shore)
          2.2   Develop integrated coastal model extent and gather input data (model to include
                Main Beach and extent of river entrance dynamics)
          2.3   Targeted data collection and model calibration (see Table 1-1 for data collection
                costs)
          2.4   Consider wind wave and boat wash conditions at target site (Doggie Beach)
Phase 3   Bathymetric Survey (procured by Council under a separate contract)
Phase 4   Conceptual / numerical modelling of scenarios
          4.1   Removal of sand spit from the northern side of entrance breakwater
          4.2   Closure of the eastern channel, leaving only the central channel
          4.3   A breakthrough alignment through the middle of the Noosa Spit
          4.4   Other historical scenarios identified through the review process (per scenario)
Phase 5   Preliminary report summarising the technical review and modelling
Phase 6   Develop coastal erosion management strategy
          6.1   Consider up to 5 coastal management options for testing with the model
          6.2   Develop a trigger-based strategy with actions linked to physical triggers (e.g.
                shoreline position)
          6.3   Assess potential changes to natural process, social and recreational values
                associated with the preferred strategy; identify the legislative requirements and
                approvals pathway; preliminary cost/benefit analysis

          6.4   Assess the performance of the strategy under a 2040 mean sea level scenario
          6.5   Incorporate Noosa 'look and feel' design principles and values identified through the
                CHAP
Phase 7   Stakeholder engagement workshop in Noosa
Phase 8   Pre-lodgement style engagement with State regulators, potentially seek long-term
          approval for preferred strategy
Phase 9   Final SEMP reporting, including 1 month review and public consultation of draft;
          numerical model handover and training.




                                                                                         Page 33 of 60
Log in to download the original file

2019-03-12 Services & Organisation Committee Agenda(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.