GATEWAY RISE NOOSAVILLE - STAGE 2
We have been engaged as Consulting Electrical Engineer for the design of
electricity reticulation and street lighting on the above subdivision. Details of the
subdivision are contained on the Subdivision Details Sheet enclosed.
A copy of our final Works Plan is enclosed herewith for your approval, subject to
Energex's approval also. We would appreciate it if you would advise us as follows:
i. Approval of alignments specified on the enclosed plan, for poles, street lighting
columns and underground cables:
ii. approval to use "as constructed" levels as permanent levels;
iii. formal approval of the works proposed on Council-controlied road, as required by the
Electricity Act 1994, 5.102;
iv. formal approval of the street lighting design;
v. confirmation that the electricity reticulation and street lighting, as designed, satisfies
the requirements of Council's development approval for this subdivision.
Our cheque for Council's lodgement fee is enclosed. Please send your tax invoice
within 28 days.
Thank you for this assistance.
~o
Yours faithfully,
ROBIN RUSSELL & ASSOCIATES PTY. LTD.
CERTIFIED ~~
QUALITY
Y~"~GE"ENT
sunil
Robin Russell
-lllIIU._
(RPEQ 1546)
RobinRussell
BE. BCom. flEAult,
RPE01~
CPEng
Encl: Works Plan
Subdivision Details Sheet
Consulting IDAS form 1 & 6
ElectricalEngineers
Cheque for $582
Subdivision
Electrical Services
204/6 BabarTa St. Stafford
Queensland 4053 Australia
Head Office
Ph (07) 3872 5555
Fax (07) 3872 5566
Sunshine Coast
Ph (07) 5442 1758
Email
[email protected]
www.robruS.com.au
33.CeltJfied Sl Design for Approval.doCx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
Robin Russell and Associates Ptv. Ltd.
Subdivision Details Sheet Printed: 03-Apr-14
RRA Job No: 8080 Energex Project No: 50104663
Address: 50 Gateway Drive Project Name: Gateway Rise Noosaville • Stage 2
Locality: Noosaville Post Code: 4566
Administration
Client's Project Manager: Andrew Murray RRA Project Manager: Robin Russell
Electrical Contractor: RRA Designer: Anthony Hobbs
Civil Contractor: RRA Construction Manager: Shane Hyde
Developer Contact Details
Name: Gateway Rise Ply Ltd Name: Andrew Murray
ABN: 28 753 871 601 Telephone: (07) 5444 0727
Mall: c/. Project Strategy OLD Ply Ltd Fax: (07) 5444 0627
62 Buderim Avenue Mobile: 0418989897
. Alexandra Headland OLD 4572 E-mail: [email protected],au
Street: "
Consultants
Project Control: Gateway Rise Ply Ltd Contact: Andrew Murray
Town Planner: Contact:
Surveyor: Murray & Associates (Old) Ply Ltd (Gym pie) Contact: John Campbell
Civil Engineer: Tod Consulting Engineers Contact: Doug Reynolds
Landscape Architect: Contact:
Approvals Required
Council: Noosa Shire Council Approval No: 2007/1626
Main Road? Telstra AFR: 17335383
Transmission Easement? Telstra Password: RRB080
Description
Real Property Desc: Proposed lots 2-8 cancelling lot 81 on SP211687
No. Lots/Premises: 7 No. Dwelling Units: 0
Reticulation: Underground Estate type urban residential
Preferred Street Lights: standard PMT Site?
Conduits by: electrical contractor New Easement?
Energex Rateable Sites: 12
Forecast Dates
Date Initial Record: 13/03/2014 Civil Construction Start: 26/05/2014
Date Engaged: 21/03/2014 Civil Construction Time: 10
Date Latest Update: 3/04/2014 Conduits Start: 14/07/2014
Electrical Construction Start: 4/08/2014
Date Plan Sealing Req'd:
PMT Collection Date:
Telecommunications
Telecommunications by: Telstra Design of pits & pipes by:
Authorised to Proceed: _
(Name) (Signed) (Date)
Page 3
; .
Department of State Development, Infrastructure and Planning _
IDAS form 6-Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete IDAS form I-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
Ail terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
boxes.)
D Building work-<:omplete Table A [Z] Operational work-<:omplete Table B
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
D No D Yes- provide details below
List of approval reference/s Date approved (ddlmm/yy) Date approval lapses (ddlmm/yy)
Great state. Great opportunity.
Queensland
Government _
Page 4
,,
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
D Road works D Stormwater D Water infrastructure
D Drainage works D Earthworks D Sewerage infrastructure
D Landscaping D Signage D Clearing vegetation under the planning scheme
[{] Other-provide details Electrical reticulation and street lighting
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
D No [{] Yes-specify the number of tots being created 1=7===============================
c) Are there any current approvals associated with this application? (E.g. material change of use.)
[{] No D Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (ddlmm/yy)
2. What Is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? $
(Inc GST, materials and labour.)
I Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are [{] Confirmed
recommended scales) which shows the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
• any existing or proposed easements on the retevantland and their
function
• any access limitation strips
• all existing and proposed roads and access points on the retevantland .
IDAS form 6 -Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 5
•••
A statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant
o Confirmed
to the application.
A statement addressing the relevant part(s) of the State Development o Confirmed
Assessment Provisions (SOAP). o Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1 :50, 1:100 or 1:200 are o Confirmed
recommended scales) which show the following: o Not applicable
• the north point
• the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
• the room layout (for residential development only) with all rooms clearly
labelled
• the existing and the proposed built form (for extensions only)
• the gross floor area of each proposed floor area .
Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are o Confirmed
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation).
o Not applicable
Plans showing the size, location, proposed site cover, proposed maximum o Confirmed
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.
o Not applicable
Plans showing the extent of any demolition that is assessable development. o Confirmed
o Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: o Confirmed
• existing and proposed contours o Not applicable
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood level (if applicable)
• the fill level (if applicable) .
Applications for operational work Involving roadworks
Drawings showing: o Confirmed
• existing and proposed contours o Not applicable
• the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markinos includino details on raised pavement markers
IDAS form 6-Buildmg or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 6
•
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: o Confirmed
• existing and proposed contours IZI Not applicable
• drainage locations, diameters and class of pipe, open drains and
easements
• manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: o Confirmed
• kerb lines or edge of pavement where kerb is not constructed IZI Not applicable
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs .
Applications for operational work involving sewerage reticulation
Drawings showing: o Confirmed
• location of all existing and proposed services IZI Not applicable
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable) .
Applications for operational work involving street lighting
Drawings showing: IZI Confirmed
• location of all light poles and service conduits o Not applicable
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of anv variations to normal aliQnment
IDAS form 6- Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2073
Page 7
• details of lighting levels .
Applications for operational work involving public utility services
Drawings showing: o Confirmed
• any existing light poles and power poles o Not applicable
• any existing underground services
• details of proposed services
• alteration to existing services .
Applications for operational work involving landscaping works
Drawings showing: o Confirmed
• the location of proposed plant species o Not applicable
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details .
Privacy-Please refer to your assessment manager, referral agency andlor building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received ____________ 1 Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department 01 Slate Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
10113 QGOV (137468) WAS form 6 - Bili/ding or operational wor!<assessable
[email protected] against a planning scheme
Version 3.0-1 July 2013
www.dsdlp.qld.gov.au
Page 8
,.
Department of State Development, Infrastructure and Planning _
IDAS form 1-Application details
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications. you must:
• complete this form (IDAS form I-Application details)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Pfanning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.aov.au/MyDAS
I Mandatory requirements
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be Issued
to the applicant.)
Namels (individual or company name in full) I Robin Russell & Associates Ply. Ltd.
For companies, contact name I Tania Deller
Postal address 20416 Babarra Street
Suburb Stafford
State Old. 1 Postcode 14053
Country Australia
Contact phone number 107 3872 5555
Mobile number (non-mandatory requirement)
Fax number (non-mandatory requirement)
Great state. Great opportunity.
Queensland
Government _
Page 9
Email address (non-mandatory requirement)
I [email protected]
Applicant's reference number (non-mandatory
requirement) I B080
1. What is the nature of the development proposed and what type of approval Is being sought?
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
o Material change of use 0 Reconfiguring a lot 0 Building work [{] Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval
under s241 of SPA
o Preliminary approval
under s241 and s242
IZJ Development permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
Electricity reticulation and street lighting 7 lot urban residential subdivision.
d) What is the level of assessment? (Please only tick one box.)
o Impact assessment IZJ Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table G-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
o Material change of use 0 Reconfiguring a lot 0 Building work 0 Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval
under s241 of SPA
o Preliminary approval
under s241 and s242
o Development
permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
o Impact assessment 0 Code assessment
Table G-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule IZJ Not required
IDAS form 1 Application details
Version 3.0-1 July 2013
Page 10
2. Location of the premises (Complete Table 0 and/or Table E as applicable. Identify each lot in a separate row.)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
[{] Street address and lot on plan (All lots must be listed.)
D Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/locality name cede and plan no.
i) 50 Gateway Drive, Noosaville 4566 81 SP211687 Noosa Shire Council
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zonels for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (If applicable)
Easting Northing Latitude Longitude
D GDA94
D WGS84
D other
3. Total area of the premises on which the development is proposed (indicate square metres)
4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)
I Vacant Land
IDAS form I-/lpplicatlon details
Version 3.0-1 July 2013
Page 11
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement)
o No [{] Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
2007/1626
6. Is owner's consent required for this application? (Refer to notes at the end of this form for more information.)
[{] No
o Yes-complete either Table F, Table G or Table H as applicable
Table F
Name of ownerls of the land
I/We, the above-mentioned ownerls of the land, consent to the making of this application.
Signature of ownerls of the land
Date
Table G
Name of ownerls of the land I
o The owner's written consent is attached or will be provided separately to the assessment manager.
Table H
Name of ownerls of the land I
o By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
17. Identify if any of the following apply to the premises (Tick applicable boxles.)
o Adjacent to a water body, watercourse or aquifer (e.g. creek, river. lake, canal)-complete Table I
o On strategic port land under the Transport Inlrastructure Act 1994-complete Table J
o In a tidal water area-complete Table K
o On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table I
Name of water body, watercourse or aquifer
Table J
Lot on plan description for strategic port land Port authority for the lot
IDAS form 1 Applicalion dctails
Version 3.0-1 July 2013
Page 12
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity. overland flow,
water etc)
o No D Yes---ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal Include new building work or operational work on the premises? (Including any
services)
D No 0 Yes---ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)
o NQ---ilO to question 12 DYes
11. Has the portable long service leave levy been paid? (Refer to notes at the end ofthis form for more
information.)
o No
D Yes-eomplete Table L and submit with this application the yellow local governmenVprivate certifier's copy of the
receipted QLeave form
Table l
Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, B, E, L or P)
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 200m
o No
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1-lIpplication details
Version 3.0. 1 July 2013
Page 13
13. List below all of the forms and supporting information that accompany this application (Include alilDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
Electrical works plan No. B080 Revision A post
RRA covering letter & subdivision details sheet
IDAS form 6
Cheque for $582.
114. Applicant's declaration
o By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information)
Notes for completing this form
• Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1 )(c) of the
Sustainable Planning Act 2009
Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
• Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS form 1 Application dc/ails
Velsion 3.0-1 July 2013
Page 14
Questlon 12
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency andlor building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 200g"j or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received ____________ 1 Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the
---------------- I
building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
QLeave project Amount paid form sighted by
Description of the work Date paid who sighted the
number ($) assessment
form
manaqer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 Cily East Old 4002
lei 13 OGOV (13 74 68)
[email protected] IDAS form 1~Application details
Vefsion 3.0-1 July 2013
www.dsdlp.qld.gov.au
Page 15
Lot 8
Lot 6
LV SWITCHBOARD LABELS AT VISION COURT(STN 3_} SC2069511
Ne | ‘sae looove} “exe | LABEL INFORMATION
sauTor | 835 | WB | 6 | TRANSFORMERISOLATOR
4 80x35 | WB 5S j_
1 0035 | WE 5].
2 80035 | WE 5 oe
2 | amas | we] s |.
3 | emas | we | 5 | FOMBON CRT (SOUTH) UraanEg9 FIT NEW
| DANGER 3 | amas | we | 5 | OMRON CRT (SOUTH) UrazzEs9 FIT NEW
CVE LV & HV
CABLES TOVISION CRT *
{STHWEST} U1332704
Lot 12 & je | WBS Te services FIT NEW
4 80x35 | WB 5 poMsion cr (STHAWEST) U°332704 FIT NEW
Lot 14
MATERIAL GRAVOPLY Ih (1.5mm) senda .
ENERGEX REQUIRE 2 X LY LABELS AT TRANSFORMERS.
* 6) JOIN TO EXISTING
Hy es) CONDUITS STN 1A
ny rr
y Ui SO0KVA PMT cor CCT2 CCT3 ccTa
4) I | | | |
1
4
! s
t 5 g s g
i Lot 10 e = = 2
E é E E
LV SWITCHBOARD
LAYOUT FOR 8C2069511 (STN 3) - VISION CRT
Lot 8
DEVELOPERS SURVEYOR
TO INSTALL LINE PEG BEHIND NEW LABELS
PILLAR STN 8 TO SATISFY ENERGEX
REQUIREMENTS. CONTRACTOR TO SUPPLY ALL LABELS TO ENERGEX SPECIFICATION
ROCK WALL ON BOUNDARY
xs
TELSTRA - NOTE Sas ge 821257
SEPERATE TRENCHING IS REQUIRED
FOR TELSTRA CONDUITS IN | avi)
COMMERCIAL INDUSTRIAL SUBDIVISIONS. | ** x S7\ty,
| ij il
1389567 | it M
ft I --* ‘aé uu
ELECTRICAL CONTRACTOR
The works detailed on this drawing shall be constructed in accordance with Robin Russell & Associates’
General Specification for Installation of Electricity Reticulation and Street Lighting - Issue 'Y’.
CiVIL CONTRACTOR
The installation of ail electrical conduits shall be supervised by the holder of an electrical work licence
- Electrical Safety Act 2002.
Energex conduits and transformer site retaining walls shall be installed strictly in accordance with
Energex's specifications (see below). They will be inspected for compliance upon completion.
The civil contractor shall install enveloping conduits under retaining walls behind pillars - two 100mm
conduits into each lot (one for Electricity, one for Telstra), 600mm deep behind the pillar, near ground
level inside the lot.
Relevant specifications in Energex’s Underground Distribution Construction Manual are found at -
Section C1: Conduits
Section C2: Excavation
Section C3: Transformer Sites
These sections of the manual can be downloaded from the following Energex web site:
http://www. energex.com.awabout_energex/asp/technical_documents.asp
Civil engineers who have registered for access to the following RRA website may download extracts
from Energex's manual at:
http://www. robrus.com.au
The civil contractor shall ensure that all conduits have been installed before constructing retaining
walls, paths, driveways & water services. The civil contractor shall please inform the electrical
contractor of any ‘as constructed" departures from the civil design.
Care! Lighting of new or altered existing roads might not comply with specified standards
until new road lighting has been commissioned. The civil contractor shail ensure that
necessary warning signs are installed and speed restrictions are applied if necessary.
ON-SITE SERVICES CHECKS
Robin Russell & Associates gives no warranty regarding the presence or location of buried services,
including newly-installed services. “As Constructed” locations may differ from what is drawn on this
works plan. Contractors shall be responsible to identify and locate all buried services. initial
identification can be obtained from:
Dial Before You Dig Service
Telephone 1100
Fax 1300 652 077
On-line enquiries can be made at:
http:/Awww.1100.com.au.
Having determined which services may be present, on-site locations should then be arranged with
relevant service authorities.
Sewerage and water plans for the subdivision may be obtained on request from the Superintendent.
INSTALLATION OF TELECOMMUNICATIONS CONDUITS BY TELSTRA
Telstra's contractor will install telecommunications condui's in shared trenches and other excavations
provided by tne electrica: contractor. 'n commercial subdivisions. or where more than 2xP400 condutts
are required. the conduits may no! be nstailed above Energex conduits. They shai be jaid ir a
separate trench or the stanca icatons alignment specified
Contractors shail notify Telstr,
e week before road crossing trenches wil’ be open
* wo days before footpath trenches wil be oper
Testra’s contractors are’
south of Brisbane River
elsewhere
BIKE PATH CLEARANCES
“Austroads Guide to Road Design Part 6A: Pedestrian & Cyclist Paths" specifies a minimum
Clearance of 0.5m between a bike path and any obstacle. In order to achieve specified road/
path lighting within the specified verge, it has not been possible to satisfy that requirement.
Siicar Communications
Service Steam Communications
LEGEND: ELECTRICAL
—-~—-— _ EXISTING UNDERGROUND CABLE
—-—-— PROPOSED UNDERGROUND CABLE
—--—— PROPOSED NBN CONDUIT ON COMMS ALIGNMENT
wees COMMS CONDUIT IN SHARED TRENCH
BORED CONDUIT
GAS IN SHARED TRENCH
STATION NUMBER
PADMOUNT TRANSFORMER
PROPOSED POLE TRANSFORMER
METER BOX / LV SWITCHBOARD
PROPOSED SERVICE PILLAR
EXISTING SERVICE PILLAR
FUTURE SERVICE PILLAR
EXISTING LINK PILLAR
PROPOSED C&l PILLAR
EXISTING OVERHEAD ELECTRICITY MAINS
PROPOSED OVERHEAD ELECTRICITY MAINS
oO HV POLE
© HV +LV POLE
° LV or STREET LIGHT POLE
%{- PROPOSED STREET LIGHT
oC EXISTING STREET LIGHT
ae
—h
eclooe
FUTURE UNDERGROUND STREET LIGHT
RECOVER STREET LIGHT
EARTH
EXISTING RATE 3 STREETLIGHT CABLE
——-— PROPOSED RATE 3 STREETLIGHT CABLE
3% EXISTING RATE 3 STREET LIGHT
‘o- PROPOSED RATE 3 STREET LIGHT
—— _ EXISTING CONSUMERS OVERHEAD CABLE
-——— _ PROPOSED CONSUMERS OVERHEAD CABLE
——-— _ EXISTING CONSUMERS UNDERGROUND CABLE
——-—-~ PROPOSED CONSUMERS UNDERGROUND CABLE
= PROPOSED CONSUMERS SWITCHBOARD
° EXISTING CABLE
PROPOSED CABLE
32/40mm HD CONDUIT
80/100mm LD CONDUIT
100mm WHITE ENERGEX COMMS. CONDUIT
125mm LD CONDUIT
CABLE MARKER POST
“ENERGEX ELECTRIC CABLE” MARKER PLATE
>e@@®@Oo
UNDERGROUND CABLE CERTIFICATION
8
a
z | oe All cables detailed on this drawing have been checked using the
PLAN VIEW 20m 20 80m B | wy = cable locator described below and are, according to measurements
ee 3 \
SCALE 1:1000 ‘ I $C754851. taken, on the correct alignment and at correct depths below the
1: 1000 (A1 - NOT REDUCED) Ny » Dey | Sa finished level, except as marked up. Alignments are subject to the
I | /\ | ! accuracy of survey pegs present at the time of measurement.
& reo L do. ) Yous Make: ;
4 Model:
“ \ [uss] -—— “~ ake
\ s y h ‘ Serial No: Date CablesChecked: JF
VV 30 §¢2069511 gy Name of Person Who Conducted Checks
- _ SS Ren x f | Certified (signature of checker):
FLO scrasoses ral 2a eo
7 & gb loowe s cers r 3 Phone No. of checker:
/ 4 = 3 5] “8 LP1004618
/ / x ar Moa. = ps (& oPen)
! / om Pon r2 | cera / 15/5108 ROAD LIGHTING CERTIFICATE
a
/ ‘ x o > / Within the bounds of this estate, this road lighting design is certified to
I 2A ® F / comply generally with the nominated categories of AS1158.1-1986,
I K Pe @ Ln @ 4 AS/NZS1158.1.1:2005 and/or ASINZS1158.3.1:2005 for luminaires
d % ‘ ~~ U1332699) and lamps supplied under Energex contract C10227.
x U1389565 \* VISION COURT - CATEGORY P4
\ 7 NN, Z
\ Oe, lo
\ PROPOSED COMMISSIONING PLAN
\\ Tentative only; subject to amendment by ENERGEX outage coordinator. ROAD LIGHTING MAINTENANCE SCHEDULE
\ This design assumes maintenance factors of 0.7 for minor road
N LV ONLY lighting and 0.75 for major road lighting. These maintenance factors
\ w Where interruptions to existing consumers are required, they shall be notified are based on the foowing nominal maintenance schedule, which
ig in line with ENERGEX policies. might not necessarily be adopted by Energex.
CONSTRUCTION CONTACTS z TELECOMMUNICATIONS INFRASTRUCTURE 1. Lamps shall be replaced at 36-month intervals.
wv . \ 2. At that time, tuminaires shall be cleaned, inspected & maintained.
ELECTRICAL ENGINEER 1g CONDUITS & PITS | to be designed by: Telstra's contractor 3. Vegetation shall be kept clear of street lights,
ROBIN RUSSELL & ASSOCIATES PTY LTD ; ae to be installed by: Telstra's contractor 4. Inspection patrols and spot lamp replacement shall maintain
DESIGNER LP 1389559 * to be owned by: service availability at not less than 95%. . ;
ANTHONY HOBBS ph: 0499 993515 i LV SCHEMATIC TELECOMMUNICATIONS INFRASTRUCTURE _ to be provided by: e Ss r a 5. Luminaires and lamps shall be replaced with exact equivalents.
CONSTRUCTION MANAGER
(SCALE 1:2000)
SHANE HYDE phe 0499 021772 TestaAFR: - s—~«*Si Rh Boer, ese otenn
CIVIL ENGINEER Robin Russell RPEQ 1546
TODNOOSA CONSULTING ENGINEERS
SuREVOR er SOURCE DOCUMENTS SITE INFORMATION
MURRAY & ASSOCIATES PTY LTD (GYMPIE) CREATOR DRAWING DWG. NO. REV. NO. | DATE TOTAL NUMBER OF LOTS
JOHN CAMPBELL ph: 5441 2188 TOD NOOSA CONSULTING ENGINEERS | PROPOSED WATER o6seyv2 Tt 26/3/2008 PROPERTY DESCRIPTION
TELSTRA CONTRACTOR TOD NOOSA CONSULTING ENGINEERS | BASE ACAD..06583 EMAIL 17732014 LOTS 2-8 canceling PIO LOT 81 ON SP21 1687
SEM TOD NOOSA CONSULTING ENGINEERS | ROADWORKS & DRAINAGE | - e5e3sa | 17/3/2014
BOB TANNER ph: 0477 708028 .
DATE | REV | REVISION APP. | DATE | REV | REVISION APP. | CURRENT REVISION CHANGES: SION ELECTRICAL SERVICES SEC CATION SWwP47.1 DESIGNED A. HOBBS DESCRIPTION LOCATION DRANWING No.
2 SUBD). TRICAL SERVICE:
27992014 | A | PRELIMINARY ISSUE RR. Ro bi n Zu abr tat cyete, COUNCIL SCR. DRAWN C. TODHUNTER ELECTRICITY RETICULATION GATEWAY RISE NOOSAVILLE - STAGE 2 B080-01 A
R usse | | Tek on airs 3 COUNCILREF | 2007/1626 APPROVED BY | ROBIN RUSSELL GATEWAY. DRIVE & VENTURE DRIVE
CUENT ENERGEX PROJECT No. SHEET No.
& ASSOCIATES PTY. LTD. tnatr@rinsema = ceetieies Lup REP vee Gd | SaneD h-Z
www sobrus.comau QuALity 8 zl
CONSULTING ENGINEERS - ome GATEWAY RISE PTY LTD THIS DOCUMENT IS COPYRIGHT AND THE PROPERTY OF ROBIN RUSSELL & ASSOCIATES PTY LTD S01 04 6 OF
™s ELECTRICAL ABN TRONS 861 DWT REV V26 - 20140225 DATE 27/3/2014 AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT AUTHORITY. . A 1 663 1 2
OF
Page 16
URD CONDUIT SCHEDULE - ROADWAYS - BY CIVIL CONTRACTOR
X-SECTION (m) EQUIPMENT SCHEDULE - SERVICE PILLARS
CONDUIT LENGTH (m)
STATIONS PVC CABLE KERB TRENCH
LOCATION FROM -TO ENERGEX | PROTECTION | EXCAV/) TRENCH | MARK REMARKS BY CIViL LOCATION SIN | site 1p. EX | REC | IN SIZE AND DESCRIPTION COMP) cusc | ary REMARKS
4omm | yy | 100mm |. | 25mm] | (m) TAPE | DETAIL | ‘E NO. LD.
HD LD LD Comms MD VISION COURT 3 Sca0e0511 | EX IN. [240mm LV TFMR TERM LVPT4C240 | 1 [LIVE HVA.V CABLES / CCT4
CONCRETE CAP CONDUITS r LV FUSES f DSLVF31 if
VISION COURT 4 5 2o |2] 2 | 2 26 26 N 2 OVER S/W DUE TO 26 1 U20ee513 | EX IN J240mm LV LUG SET 1044-1-240 | 4 |LIVELV
INSUFFICIENT COVER 2 1332699 iN Ti WAY C & I PILLAR & MEN pit | ivsPive [a
CONCRETE CAP CONDUITS 1037-1 1
7 8 2 | 2] 2 | 2 26 26 N 2 OVER S/W DUE TO 26 6 1332700 IN [2WAYC&IPILLAR ; pa f ivspi76 [ 1 [lore
INSUFFICIENT COVER In. |S. FUSE 4043-1 if
9 10 44_j2)] 4 |2 44 44 N 4 44 7 1332701 IN [3 WAY PILLAR & Si Pi [LvsPe6st [4 TOTALS
8 U1332702 wl! WAY C & 1 PILLAR & MEN pi f ivsPi76 [4 LYSP9-6St_x 1
1037-1 1 LVSP176x% 5
TOTAL 192 192 96 96 8 96
IN. |SA. FUSE r 1043-1 17 1043-1K 4
NOTES 9 U1332703 IN f2WAYC&IPILLAR Pia [ LVSP17-6 1 LVPTAC2ao x 1
1. ROAD CROSSING CONDUITS SHALL BE INSTALLED STRICTLY IN ACCORDANCE WITH THE ENERGEX UNDERGROUND DISTRIBUTION CONSTRUCTION (UDC) MANUAL. in. |Sa. FUSE r 1043-4 17 DSLWF3ix 1
2. ROAD CROSSING CONDUITS SHALL HAVE A MINIMUM COVER OF 800mm AT ALL PLACES UNDER THE ROAD, EXCEPT UNDER STATE-CONTROLLED "MAIN" ROADS, 10. | U1a32704 IN T1WAY C&1PILLAR & MEN pa PT ivseie 7a 1044-1240 4
WHERE CONDUITS SHALL HAVE A MINIMUM COVER OF 1200mm. 1037-4 1 45x 1
3. CONDUITS SHALL EXTEND TO WITHIN 900mm OF PROPERTY ALIGNMENT: PVC PROTECTIVE COVER STRIPS SHALL BE LAID ABOVE ALL ROAD-CROSSING CONDUITS IN. SA. FUSE r 1043-1 if 1037-1 3
FOR THEIR FULL LENGTH. VARIOUS LOCATIONS CABLE MARKER PLATES 1350-2 7 [INSTALL STNS 5, 10-1011, 10-10L2 502% 7
4. REFER ENERGEX UDC MANUAL V.5 SECT. C2 FOR CROSS-SECTION DETAILS.
5. BRASS “E* MARKERS SHALL BE INSTALLED IN KERBS DIRECTLY ABOVE ELECTRICITY CONDUITS.
6. CAUTION: DO NOT CONSTRUCT RETAINING WALLS, CONCRETE PATHS OR WATER SERVICES UNTIL FOOTPATH CONDUITS HAVE BEEN INSTALLED.
X-SECTION
CONDUIT LENGTH m) STREET LIGHT SCHEDULE - RATE 2
STATIONS {m) PVC CABLE KERB
LOCATION ROM PROTECTION | EXCAV/ | TRENCH | MARK REMARKS TRENCH POLE OR COMPONENTS OUTREACH BRACKET
F “TO 40mm 100mm 125mm ENERGEX (m) TAPE | DETAIL ec STN MOUNT
Ho N°] tp NO} yp | No} 100mm LOCATION No. SITE 1D. |COMPJEXIST| REC | ERECT} POLE cusc ALIGN INVERT COMP] yor RECOVER ERECT curso [EXIST] REC JERECT! Qygn HT (m) REMARKS
Comms MD 1D. | (m) | (m) (m) TYPE KERB 1D. LANTERN |CUST.|LANTERN | CUST. (m) | (m) (m)
VISION COURT 1A 4 1 |2] 6 | 2 15 N ee EXISTING CONDUITS 15 VISION COURT 6. | p1332705 { Pot 5.5 [ BPM [siMa724 07 SLi §70L2_| SUNC | SLM8173 15 [SiMei541 | 7.5
; s ; xo N CAP 1x100 & Oxids CONDUITS " at | Prasevoe | Por 5.5 BPM [SLM872-4 0.7 Sli s7o.2 | suNc [ Simsi7-3 1.5 [SLM815-1 75
2 2} 39 SING a | pPtase707 | pot 55 [apm [sime724 0.7 sui s7oLe | sunc [ SLM817-3 1.5 SLM815-1 75
1
5 9 g [2] 90 | 2 90 N 90 toL1 | P1332708 ff Pot 5.5 BPM [SLMa72-4 0.7 fst s7o.2 | sunc [ Simai7-3 1.5 [SiMe15-1 75
io | 141 | 20 | 14 20 20 oO 20 toL2 | Pra32709 | Pot 5.0 | HINGED |SLM8s8-1 0.75 PATH sui s7o.2 | SUNC | SLM817-3 5.0
PATHWAY 10 10L2 34 1 34 ua Oo 34 NOTES
1. ALL LIGHTS TO BE CONNECTED ON ENEAGEX RATE 2. TOTALS
L str AT PILLARS 10 IP AT PI 2, CHECK CLEAR OF ALL SERVICES BEFORE EXCAVATING. Sime724 x 4
ALL STREETS & POLES ey 15 PVC COVER STR LARS) 5 3. S/L POLE SETBACKS TO THE MEASURED FROM INVERT OF KERB (1.0.K) SLM858-1 x 1
SLM817-3 x 5
TOTAL 69 270 270 79 189 204 SIMB151 x 4
ENERGEX TOTAL evens x ‘
x
NOTES
1. CONDUITS SHALL BE INSTALLED WITHIN A CORRIDOR 300-900mm FROM PROPERTY ALIGNMENT, IN ACCORDANCE WITH ENERGEX UNDERGROUND DISTRIBUTION
CONSTRUCTION (UDC) MANUAL.
2. FOOTPATH CONDUITS SHALL HAVE MINIMUM 750mm COVER, , REGARDLESS OF ENERGEX'S REQUIREMENTS.
3. CONNECT EXISTING CONDUITS, INCLUDING ROAD CROSSING CONDUITS, TO NEW FOOTPATH CONDUITS
4 TELECOMMUNICATION CONDUITS SHALL BE INSTALLED IN A SEPARATE TRENCH.
5. TELECOMMUNICATION CONDUITS SHALL BE INSTALLED ON AN ALIGNMENT OF 3.0-4.0M FROM THE PROPERTY BOUNDARY.
CABLE SIZE / TYPE
LOCATION Pro ye [vouts| ex | Rec | IN 11kV LV REMARKS
14AT240XSH) 11CT 185XSH|LVA4240XPV) LVC47OXH |LVC416XPV ]LVC216PVPVILVC24PVPV
VISION COURT 1 2 LV IN 64 LIVE LV STN 1
3 10 Lv IN 204 ccl4
7 8 iv IN 31
ALL STREETS AT PILLARS | LV * 9 BRIDGING
STREETLIGHTS| SL . 1
SUB-TOTAL 299 9 1
VARIANCE % 12 1 4
TOTAL 311 10 95 OOTRENCH 300m
NOTES:
1. THE CONTRACTOR SHALL MEASURE ACTUAL CABLE LENGTHS REQUIRED, AFTER INSTALLATION OF CONDUITS, THEN ORDER CABLE ACCORDINGLY.
DATE } REV | REVISION APP. | DATE | REV | REVISION APP. | CURRENT REVISION CHANGES: Srecirication | SWP47.1 DESIGNED A. HOBBS DESCRIPTION LOCATION DRAWING No.
. SUBDIVISION ELECTRICAL SERVICES
272014 | A | PRELIMINARY ISSUE RR. Ro bi n 204% Banana Set, easoe, “COUNCIL SCRE. DRAWN C. TODHUNTER ELECTRICAL SCHEDULES GATEWAY RISE NOOSAVILLE - STAGE 2 B08002 A
Stafford, QLD 4053 s <
R ussell Tok oncara ses : COUNCIL REF | 2007/1626 APPROVED BY | ROBIN RUSSELL GATEWAY DRIVE & VENTURE DRIVE
ax *
& ASSOCIATES PTY. LTD. Ereit r@vobnekcom au cenmnite UBD REF ve Ol acnep hey CHENT NOOSAVILLE ENERGEX PROJECT No. SHEET No.
robrus.comaa QUALITY 18 el
CONSULTING ENGINEERS - ELECTRICAL hen 78.010 589 681 ne GATEWAY RISE PTY LTD THIS DOCUMENT IS COPYRIGHT AND THE PROPERTY OF ROBIN RUSSELL & ASSOCIATES PTY LTD $01 04663 2 OF 2
~ DWT REV V26 - 20140225 DATE 27/3/2014 AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT AUTHORITY. A1
Used in these records
OPW14/0147 - Application for Operational Works - Electrical Reticulation & Street lighting - 50 Gateway Dr, Noosaville Stage 2Related documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.