Skip to the record
Accept no imitations.

Original source · versioned page text

Development Application IDAS Forms 1 & 6 - OPW12/0550

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

      .




       ODD
     Table B

           What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)


                    D       road works                 D stormwater           D     water infrastructure




                    D       drainage works             D earthworks          D      sewerage infrastructure



                    D landscaping                      D signage             cY clearing vegetation under the planning scheme
                    D other-provide details
            What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
            attachment to this form to detail each approval request)


            GJI development permit              D    preliminary approval           D    both-specify below


          I Wo< ~ A-o v,a..... cJ-c,fC,. \0’1 tes ~’<:feo 0.(\":’0 r ~
                                                                    \                             \       .




            Is the operational work necessary to facilitate the creation of new lots? (e.g.subdivision)


            [YNO              D Yes-specify the number of lots being created
            Are there any current approvals associated with this application? (e.g. material change of use)


            [J/NO             D Yes-provide details below

            List of approval reference/s                                            Date approved         Date approval lapses




     2. What is the dollar value of the    proposed building work? (inc GST, materials and labour)            $ \,000.00


     3. Confirm that the following mandatory supporting information accompanies this application



                                                                                           Confirmation of        Method of
                                                                                           lodgement              lodgement

     All applications for operational works
’j                                                                                               /

     site plans drawn to scale which show the following:                                    ~onfirmed
     .    the location and site area of the land to which the application relates

          (relevantland)
     .    the north point
     .    the boundaries of the relevant land
     .    the allotment layout showing existing lots, any proposed lots (including the
          dimensions of those lots), existing or proposed road reserves, building

          envelopes and existing or proposed open space (note:numbering is required
          for all lots)




                    2                            Bui/ding or operational work assessable against a planning scheme-IDASform 6
                                                                                                Version 1.0 18 Oecember 2009
Log in to download the original file

Development Application IDAS Forms 1 & 6 - OPW12_0550.pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.