Skip to the record
For the highest quality transcripts.

Original source · versioned page text

13. APP H. Engineering Services Report

Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

PAPER SIZE A3

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

   
 

 

 

 

 

 

This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

 

For Emergency Situations
Please call 13 19 62

a

UNCONTROLLED COPY

< “oh WY
energex
GIS
DBYD

Date: 03 Sep 14 Time: 07.20.23
Requested By: DBYD

NOT TO SCALE

° 100m

 

Enquiry No: 41349210
KEY MAP

Enquiry Area

 

 

LOCALITY DIAGRAM

Noo

 

PAPER SIZE A3

 

 
Log in to download the original file

13. APP H. Engineering Services Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.