Original source · versioned page text
13. APP H. Engineering Services Report
Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
water services or wastewater services.
Easements will be required over sewerage mains in accordance with the South
East Queensland Water Supply and Sewerage Design and Construction Code.
For any water supply or sewerage infrastructure required to be constructed on
property that is not owned or controlled by the Applicant, it is the Applicant’s or
developer’s responsibility to gain the necessary consents to install that
infrastructure.
Payment of Levied Charges will be required in accordance with Unitywater’s
Infrastructure Charges for water supply and sewerage.
If you have any queries about the advice please contact Unitywater at
[email protected] or by phone on 1300 086 489.
Yours sincerely
Noel Killip
for, Development Services Manager
Page 2 of 2
Unitywater is a statutory authority that services the Moreton Bay, Sunshine Coast and Unitywater has certification to
Noosa local authority areas on behalf of its citizens. It is governed by an independent ISO 9001 Quality Management and
board. Councils do not have control or direction over day to day operations. ISO 14001 Environmental Management.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.