Council archive · source document
41SeaviewTce Op Works Form 6 · OPW17/0051
Attached to the e-mail Operational Works Application - OPW17/0051.
Original PDF page 11, section 2. The text section number identifies this passage in the reader.
EX
0m
91
22.
.1
8
EXISTING TELSTRA PIT TO BE
.7
23
25
20
PROTECTED AT ALL TIMES.
EX
EX
23.0
TRANSITION TO TIE IN NEATLY FH
22.
RP BDY
2.00m DIVERSION DRAIN
00
0
22.75
VARIES V
21.75
0.60m
20.25
20
22.50
.5
20.7
0
EXISTING WATER VALVES AND HYDRANTS
21.0
RP BDY
3m
21.2
21
SECTIONS LEGEND TO BE PROTECTED AT ALL TIMES.
5
22.
21.
4
22.
0
PROPOSED BUILDING
.8
.5
5
25
TRANSITION TO TIE IN NEATLY
75
22
0
00
m
DESIGN SURFACE BY OTHERS
75
EX
DESIGN SURFACE
m
.7
31
DATUM LINE
20
.1
22
EX
EXISTING SURFACE EXISTING SURFACE
EX
PROPOSED RETAINING WALL (BY OTHERS)
DATUM 19.000
SECTION D TRANSITION TO EXISTING EXISTING DRIVEWAY
PROFILE (APPROX 1:4) ACCESS TO BE REMOVED
SCALE 1:100 -
TO BE CONFIRMED ONSITE
SEAVIEW TERRACE
PRELIMINARY
NORTH POINT: ARCHITECT: CLIENT: SCALE BARS: PROJECT: DRAWING TITLE:
PROPOSED DEVELOPMENT EARTHWORKS LAYOUT 7297
PERROTT LYON DAVID RUTTER 0 2 4 6m 41 SEAVIEW TERRACE PLAN JOB No.
MATHIESON ARCHITECTS
02 RETAINING WALL AMENDED 01/02/2017 TJ SC Unit 5B/85 Hudson Road
Albion, QLD 4010 SCALE 1:100 @ A1
01 PRELIMINARY ISSUE - CLIENT REVIEW 30/01/2017 A SC
ABN 82 115 498 023
E-mail: [email protected] Phone: 3857 7868
Fax: 3262 7359 DESIGNED: APPROVED: RPEQ No.
C001 02
C COPYRIGHT of this engineering design and plan is the property of INERTIA ENGINEERING Pty Ltd
REV DESCRIPTION DATE DRAWN APPROVED T.JAMES DWG. No. REVISION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
41SeaviewTce Op Works Form 6.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.