Skip to the record
The gold standard in government transparency.

Original source · versioned page text

RFI - 075-028 SWMP Report

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

LIST OF FIGURES

Figure 1 - Locality Plan ......................................................................................................................................... 5
Figure 2 – Pre-Development Catchment Plan...................................................................................................... 6
Figure 3 – Post-Development Catchment Plan .................................................................................................... 7
Figure 4 – Lawful Point of Discharge.................................................................................................................... 8
Figure 6 – Proposed Slimline Detention Tank .................................................................................................... 12
Figure 8 – Site Flooding ...................................................................................................................................... 14



LIST OF TABLES

Table A -Rational method calculation parameters (Pre Development)............................................................... 9
Table B -Rational method calculation parameters (Post Development) ............................................................. 9
Table C -Rational method calculations (Pre Development) ............................................................................... 10
Table D -Rational method calculations (Post Development) ............................................................................. 10
Table E - Rational Method vs XPSWMM Peak discharge (1%AEP) .................................................................... 11
Table F –Peak Flows at Outlet (Pre and Post Development) ............................................................................. 13



LIST OF APPENDICES

 Appendix A                  Engineering Plans
                             Prepared by Bax Engineering dated October 2022




This report was commissioned by Ms Sasha Dettori and specifically investigates the subject site. Bax Engineering Pty
Ltd accept no responsibility for the accuracy of the information supplied to use by second and third parties.




                                               Page 3 of 18
    2261 david low way, peregian beach, qld 4573      acn: 626 671 092                                                [email protected]
Log in to download the original file

RFI - 075-028 SWMP Report.pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.