Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnImplementation of the following programs during the construction and operational phases of the
proposed development will enable the safe and sustainable management of wastes generated:
• Source separation to minimise and avoid cross contamination;
• Waste materials reuse and recycling during the construction phase;
• Waste avoidance and minimisation during the construction and operational phases;
• Sustainable resource recovery and onsite reuse e.g. organic recycling/composting, recycling
of cans and bottles etc, during the operational phase; and
• Education program for site users, tenants and operational staff.
The adoption of recycling and reuse programs will enable financial benefits in the form of reduced
quantities of waste requiring collection disposal.
The adoption of a waste auditing and monitoring program in conjunction with an education program
for tenants will enable the better management of wastes and identification of opportunities for
improvement.
This version of the Solid Waste Management Plan has been prepared in response to a Request for
Further Information issued by the Noosa Shire Council on 13 December 2017. The RFI relates
specifically to the proposed Stage 6 extension, which shall result in the construction of ten (10)
additional lots.
Item 10 of the issued RFI relates specifically to the servicing of the Stage 6 extension by a waste
service vehicle. Item 10 is as follows:
Issue:
Waste Management
Information Required
10. Provide updated waste management plan for Palm Lake site that includes the added site of
the proposed 10 Units. The waste management plan must demonstrate that all internal roads
are adequate for the manoeuvring of Council’s Refuse trucks to collect garbage from the
individual units or from allocated collection points within the site. The plan must show the
paths of travel of the Refuse Truck within the site and the entry and exit points into the
Council’s road network.
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.