Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix F - Amended Solid Waste Management Plan

Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Implementation of the following programs during the construction and operational phases of the
proposed development will enable the safe and sustainable management of wastes generated:

    •   Source separation to minimise and avoid cross contamination;
    •   Waste materials reuse and recycling during the construction phase;
    •   Waste avoidance and minimisation during the construction and operational phases;
    •   Sustainable resource recovery and onsite reuse e.g. organic recycling/composting, recycling
        of cans and bottles etc, during the operational phase; and
    •   Education program for site users, tenants and operational staff.

The adoption of recycling and reuse programs will enable financial benefits in the form of reduced
quantities of waste requiring collection disposal.

The adoption of a waste auditing and monitoring program in conjunction with an education program
for tenants will enable the better management of wastes and identification of opportunities for
improvement.

This version of the Solid Waste Management Plan has been prepared in response to a Request for
Further Information issued by the Noosa Shire Council on 13 December 2017. The RFI relates
specifically to the proposed Stage 6 extension, which shall result in the construction of ten (10)
additional lots.

Item 10 of the issued RFI relates specifically to the servicing of the Stage 6 extension by a waste
service vehicle. Item 10 is as follows:

Issue:
Waste Management
Information Required
    10. Provide updated waste management plan for Palm Lake site that includes the added site of
        the proposed 10 Units. The waste management plan must demonstrate that all internal roads
        are adequate for the manoeuvring of Council’s Refuse trucks to collect garbage from the
        individual units or from allocated collection points within the site. The plan must show the
        paths of travel of the Refuse Truck within the site and the entry and exit points into the
        Council’s road network.




Client:    Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan                                                    Page iv
Log in to download the original file

Appendix F - Amended Solid Waste Management Plan.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.