Original source · versioned page text
Cardno Amended flood report July 2018
Attached to the e-mail additional information (Flood) - MCU18/0009.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
4.1.9 Debris Blockage & Fill
To account for the potential debris build up, the ground level at the building faces opposing the
direction of flow have been elevated by 1m to simulate this scenario. Ground levels were also
increased where fill is proposed See Plate 4-3 to see these changes.
Plate 4-2 Hydraulic Model Setup &
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.