08/1805 - MCU - Detached House [As Published] · 132008.1805
INTEGRATED PLANNING ACT 1997 Part D, Version 3.1, 3 March 2008
Foe a i
{i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed Use (e.g. number of employees, days and hours of operation, number of vistors, &) Confirmed over the counter
number of seats, capacity of storage area)
i eRe, ay
location of the bu
ings to be reused
(il) Plans showing the size and ici Confirmed
Not applicable
over the counter
When she application iivSly iiaing :
(Ill) Plans showing the size and location of the proposed new building work Confirmed
over the counter
Not applicable
When the application Involves reuse of other exiating works if
(iv) Plans showing the nature and location of the works to be reused Confirmed
- over the counter
Not applicable
(v) Plans showing the nature and location Confirmed
over the counter
Ol
Rl
Te
Oo
Ol
Ba
O
Ba
Not applicable
OFFICE USE ONLY
Date received Reference numbers |
Advice for completing Part D
General advice
° Part A must also be completed for all DAS development applications.
° The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
another question.
. When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the
process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form
Electronic Funds Transfer (EFT) payment notification to this application.
Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table D If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
Operational work if approval for the operational work has not been applied for in this application or in a separate application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1805 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.