Skip to the record
The gold standard in government transparency.

Original source · versioned page text

135 Lake Weyba Rd Earthworks Certification L1

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

NATA accredited facility no: 20084 PO Box 1225, Nambour QLD 4560

COA Lanoretory

Mob 0429 674 334

a

NATA

WwW

ACCREDITED 702
TECHI
COMPETE
Accrectieg for compliance with ISONEC 17025 - Testng

For All Civil Testing

 

  

AB.N. 21 61 339 7934 Servicing South East Queensiand

6 Mill Lane, Nambour Test Report
CQA eee Accredited for compres with ISOEC 17025 ~ = testing

 

 

 

Project:_135 Lake Weyba Dr Requested By:_O/N
Noosaville Date: 20-9-22
Client: Andres Gabarrin Report No. _ 1210
Field Test Procedure: AS1289 5.3.1 soils compaction and density tests-determination of the field density of a soil-sand replacement method

using a sand-cone pouring apparatus, AS1289 .1.2.1 Sampling and preparation of soils-disturbed samples-standard
method (6.4) Sampling from layers in earthworks or pavements(b) compacted

Laboratory Test Procedure AS1289 5.4.1 Soil compaction and density tests-compaction control test-dry density ratio, moisture variation and
moisture ratio, AS1289 5.1.1 (Soil compaction and density tests-determination of the dry density/moisture content of
a soil using standard compactive effort), AS1289 2.1.1 moisture content tests- determination of the moisture content
of a soil-oven drying method(standard method).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Over size sieve used (mm): 19.0
Was OMC & MDD assigned: No
Was assignment values used: No
Was the sample taken prior to compaction: No
Curing Time:- 24
Liquid limit determination: visual tactile assessment
Soil Description & Soil Layer thickness (m): Allotment Fill +0.5m
COMPACTION SPECIFICATION: 95% Standard Compaction
TEST RESULTS

Laboratory Number 1210.6 1210.7

Location Lot2 Lot2

Approx. See Site Plan See Site Plan

Elevation/layer depth Approx. +2.5m F/L

Hole Depth (mm) 125 129
FIELD & LABORATORY DATA

Compacted Field Dry density (t/m3) 155 1.56

(nearest 0.01)

Field Moisture Content (%) 14.0 14.5

(nearest 0.5)

Mat. retained on oversize sieve (%) 0.0 0.0

Dry (nearest 1)

Mat. retained on oversize sieve (%) 0.0 0.0

Wet (nearest 1)

Max. Dry Density (t/m3) 1.58 1.59

nearest 0.01)

Adjusted Max. Dry Density (t/m3) na na

‘nearest 0.01)

Adjusted Max, Dry Density Laboratory n/a wa

reference number

Optimum Moisture Content (%) 15.5 14.5

(nearest 0.5)

Moisture Ratio (%) 91.0 101.5

(nearest 0.5)

Variation of Optimum Moisture Content | -1.Sdry 0.0

(%)

Density Ratio (%)

Spear 97.5 98.0
Page 2 of 5 Tests and sampling results relate only to the items tested or sampled. results applies to the sample received/( abnormalities may
contribute to the report being compromised) Reports shall not be reproduced except in full ot _:
NATA Accredited Facility No. :- 20084 eC at WF
ABN 21 61339 7934 CQA Laboratory Approved Person:
6 Mill Lane Nambour C. Templeton

Form R18 June 2021 Date: 28-2-23
Log in to download the original file

135 Lake Weyba Rd Earthworks Certification L1.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.