Extension to Currency Period - DBW19 0003 01
Stormwater Drainage
18. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property. The works must be
constructed generally in accordance with the drawing titled Stormwater Management
Plan, CC03.002 prepared by Construction Hydraulic dated 8 March 2019.
Earthworks and Retaining Walls
19. Earthworks carried out on site must not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site.
20. All earthworks and associated retaining structures/batters must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
21. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height.
Geotechnical Stability
22. All works must be carried out in accordance with the recommendations contained in:
a. The Slope Stability Assessment, report number 28158(SL) prepared by SCG
Consulting Engineers dated 1 March 2019, and
b. The Soil Test and Footing Report, report number 28158(S).RevA prepared by
SCG Consulting Engineers dated 7 March 2019.
23. At the completion of the works certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with
the recommendations contained in The Slope Stability Assessment, report number
28158(SL) prepared by SCG Consulting Engineers dated 1 March 2019 and The Soil
Test and Footing Report, report number 28158(S).RevA prepared by SCG Consulting
Engineers dated 7 March 2019 and that the development has a minimum factor of safety
against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Damage to Services and Assets
24. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Document Set ID: 22758752
Version: 3, Version Date: 10/01/2024 Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.