Trish Sweeney, 07 5449 5293
Email: [email protected]
Application Ref: 2007/399

9 March 2007

Clearwater Designs
10 Currawong Street
NOOSA HEADS QLD 4567

Dear Sir,

Re: Application for Preliminary Building Work assessable against the Planning
Scheme situated at 103 Noosa Drive Noosa Heads described as Lot 230 RP
95196

| refer to your application and advise that it is not a properly made application, as
defined by Section 3.2.1(6) of the Integrated Planning Act. Specifically,

. Form E — Operational and/or building work assessable against the Planning
Scheme is to be provided for a preliminary approval. This application is not for a
Material Change of Use.

Please arrange for the submission of the outstanding item/s such that processing of the
application may commence.

Yours faithfully,

Trish Sweeney
ADMINISTRATION OFFICER - LAND USE

Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention

A

 

REFERS

 

 

REFERS

 

 
Full text of the other 22 pages

Page 2

 

 

qm NCOLOKW We Checklist - Applications Involving Land / .
on Development & Land Use Sections

 

 

 

 

 

REFERS
IDAS APPLICATION —
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter. REFERS
1.. APPLICATIONFORMS "| “7 ee oe ~ a "I

1.1. Form 1 PartA
1.1.1. Ensure that the form is fully completed.

 

 

 

 

1.1.2 In the case of an MCU or Op Works betow the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.4.2.2 — If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

   

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. | J]

2.. REFERRALINFORMATION. © 0 on ved
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. [7]

3. ENVIRONMENTALLY RELEVANTACTIVITIES =. 3 . 97 LS ots

 

3.1. Ensure that Part G is completed if EPA referral is required. P

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

FORM 2 - REQUEST TO CHANGE APPROVAL . art
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

5." PLANS

 

 

 

 

 

 

 

 

 

 

 

5.1. Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational 3
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is a
unbound.

6. SUPPORTING INFORMATION ° 3

6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration |
and Operational Works). If the application is accompanied by a covering letter, ensure that it is L=
capable of reproduction. [=]

6.2. In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

7, FEE

7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form.

 

 

 

 

 

 

Receiving Officer

   

Having completed this form and accepted the application, please deliver both to the following IDAS Application Receiving

trays:-

¢ If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

* Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

¢  inail other circumstances - AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc

Page 3

INTEGRATED PLANNING ACT 1997

‘ig

 

  

” Part A, Version 2.4, 29 May 2006

a
pplicatio iE

 

 

 

¢ ‘ \
R Ss a _
. NCL <
HOOSRGHIRE COU
FRGAT COUNTER a
)
1
. Lhe chtpetetton of all applicable questions on Part A is mandatory for: ll applications, Part A mustbe accompanied by the completed IDAS Assesément Checklist i
fequired, and.by one (1) or more other completed parts ‘of the ired:- For more information on the: parts of the Form fefer. to www ipa.qld.gov.au. :
“+ Any information requested in the’ form may be 2 provided in’ ‘an attachftiént to:the @ application, For further information about completing the: following details, ‘efer to Guide.1 .

 

   

  

 

      

 

 

 

! : Description ofland —
Alltand the subject of the application, must be
identified. However, a description of the land i 3 not

{ required in selation to a mobite or temporary.
Environmentally Relevarit Activity (ERA).

; Advice for completing Q2 - Q2 applies i
development is Proposed, waitin a a waler body or
watecourse..

Advice for complating Q3 “Mit land can be!

| identified by a lot on plan description, These detail

 

 

cambe obtairiéd from. tille documents or through the,
tocal govemment.

' " Hoivever, i he land on which the development i is

3 proposed dées sot have alot off plah description ti e,
the development is proposed i in a water: er body or-

Watercourse) provide =~”

(i) the fot on plan deséription for the |
adjoining/adjacent land; or *
3PS coordinates where there is no
adjoining/adjacent land (eg. in Moreton Bay). *

¥ Advice for completing Q7 - Q7 does riot apply i the’

development is within a water body or watercourse. 7”

, Adv ice for completing Q8 - Q8 applies:if ‘

 Yovelopmeati is within a local government area,

  
 

+ Note: Areas below high water mark are hot wilhin $

i focal government's area unless provided for under tie

 

4,

 

   

2.

3 e

8.

» * Stféetiaddress"

   
 
  
  

” Shop / tendancy number: 6.

 

udifighouse number, street name, suburbfocality name é pasicade) (if applicable) .

‘1035 Aloo so. Drive, Moosa Heaols 2561 |

Namie oft water body or watercourse, within which the development is proposed: (it applicable) ”

nl
Lot on plan description’ (eg. Lot 123 dn RP 4587)! GPS coordifiates: “7 + 88 oe
[eT 230 Re DS ISG" _]

The above desc iption i is for’ flick applicable box)

 

 

 

Bs i Wi): the water body. or watetcourse.
5,

 

Storey: / level: 7. Total area of land: (ne orhay
Las/a J [Ll | 6o7mz |
Local government area in'which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc, (if applicable)

[Noosa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{Local Government Act 1993, 9: Port authority for the.strategic port land or stratégic port !and tidal area on which the
4 Advice for completing QS - Q9 applies if
* development & on strategie pot and ora siotegit: development is proposed: -{eg-Port of Brisbane, Port of Townsvifa) {if applicable) .
i port land tidal area. Fe details refer to Guide,t1 -|
ipo land tidal area. For more details refer to Guide. [ wf/rr ; ]
a Proposal details 10.° Existing use-of the land: (eg. vacant, single house, shop etc.) ‘
hondedmanotecrnenteteapieate, | «| SANSLE House
11. ‘Proposed use:of the.land: (eg: 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds witha tola! area of 7 ha'for which wastes are released into waters etc). .
{| -LSéte Dwerme
: Other applicable parts of Form 1 42. Other parts of Form completet:as part of this application: (eg, Part D, Par, ete)
, Pan A must always be accompanied by other 4 RT
+ Completed parts of Form 1. For infarmation about | im P |
{ when a part of Form 1 mriay apply refer io Guide-1. - . . . :
i Applicant details 13." Applicant’s.name: * ~* _ 15. Contact person:
4 Clearly identify who is making the application, The . > -
applicant need not be the oviner of the land. CLEAR WATER f 7 Z 47D»: | | POURRAY 4 You) S
* When signirig ahd todging this application 44. Contact number: : 16. Facsimile number/e-mail address: . :
The applicant is responsible for ensuring the =
| information provided is correct. The assessment [ oce13 87£ Fo L S47y 8449 [enerrey lywnsC@ 6 plusne? om a!
manager, any referral agency & the Chief Executive
(where applicable} will cely.on this inforifation when’ | 17. :Postal address:
assessing and deciding the application. WOO.
the applicant is a company - a contact pergon [fo Cuvee WON TR, sr HEPDD> J
t be sh
: ust be shown. 48..'Signature: . 19. Date:

    

 

{ AB»

 

6.3

 

 

 

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997

      

 

[sc §(3) of the IPA prescribes that an,

ele
application must contain; of be supported by, hel, a .

written consent of the fan owners if he epptcaton @ *

involves: *

(i) .. a material change of use:

Mi reconfiguration of a jot,

* Giiy work on land below high-water mark & fot within a
«, canal as defined under the Coastal Protection and

. Management Act 1995.01 2?

{iv} work on rail corridor land defined under the

Transport Infrastructure Act 1994. +

 

| Section 3.8.1(2Na) of the PA provides that

“tandowner's consent Is fet required for a mobile or

temporary ERA.
For more infomation refer to Guide 14,

 

_7

 

| 20. Land owner's consent to the making of this application:: -..

=

Part A, Version 2.4, 29 May 2006

 

 

 

Signatyre

 

 

 

(Lal Fa peison

 

 

  

 

 

 

: Resource entitlement ( {ita licable)

Section 3.2:4(5) of the IPA requires evidence of
resource entitlement be given for. applications that
qi ed State resource.
g + Section 4.2. 4 19)¢€)H} of ine IPA] préséribes that an. 4
; application cannot be taken to be properly madé
without evidence of the sesource entitlement. *
Advice for cor ie it “
Refer to schedule 10-of the Jntegrated Planniig
Regulation 1998 that preseribes the natura of evidence
| sequired by the Slate in support of the *tecaing of thls

1 deyeloprjent pplealion. + . y

 

 

   

  

Advice for c ing Q23

The information in (i) ~ (v} is mandatory if evidence is

“required under Q22 (il) oF (ii) above.

“The ‘official stamp of the Department of Natural
‘Resources, Mines and Water Is mandatory where the |
a + application involves any water or riverine quarry

4 material under the Water Act 2000.

+ Section 3.2.1(5A) aBows the resource manager to limit

the time the evidence may be used, Q23 {vi} mus! be

completed if the evidence is time limited.

Assessment triggers .

This checklist dees not epply if the application requires

the completion of Parts A and 8 of the Form only. i
Must be completed for all other applications.

  
   

«gia

 

to 023

‘entitlement to, the resource - go to. 023

23. Evidence of the resource entitlement: ‘

a)” Resourcé entitlement / = details
(ii) Name of cease officer
(iii) Position of cela officer - %

(v)

(v)

(vi) _ date of evidence a :

24. we IDAS Assessment Checklist‘completed and attached to this application?
YES

Signature of delegated officers

 

 

 

 

Date

 

(vii) Official stamp of the department
administering the resource (if

‘development application may proceed i in the absence of an allocation of, or

applicable) .

‘ Does this application, involve a‘State resource prescribed under a regulation (other than invobing |
aterial on State coastal fand under the Coastal Protection and Management Act 1 996)? 2
2 * 2

  
 
 
    

eveloment is consistent with an allocation of, or entitlement to, the resource - ~go~

 
 
   

 

 

 

 

 

0 NO - the assessment manager may refuse to accept this application on the
grounds tf that the application hag. not been properly made

 

Plans / drawings / reports

An application should be accompanied by details to
support the proposal & enable the assessment
Manager, relerrat agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact. .

EN

 

PLEASE NOTE: The assessment manager may refuse to accept an application thal, at the time of lodgement, fails to provide all applicable information required by Part A

25. Plans/drawingsireports accompanying | this application:

 

Pian/ Drawing / Report Number

Title

 

(iv)

 

 

 

 

  

 

 

and any other relevant part of Form 1.

OFFICE USE ONLY {applicable to assessment manager's)

frees) 1)" "DATE

-

    

 

Date ofengagement: { /

_ RECEIVED
iNotification of Engagement of Private Certifi ler (Optional forma’) =
Council: thave been engaged as the private certifier for the building work referred to in this application,

Accreditation Number:

 

RECEIVING OFFICER'S ERs |

Name:

| REFERENCE
NUMBERS , |

Signature: «

 

Page 5

INTEGRATED PLANNING ACT 1997

»

    

Material change of use

assessable against a local government’s planning scheme

Part D, Version 2.0, 4 October 2004

Form 1 Development Application

_—
<
a.

 

 

Completion of all applicable questions on Part Dis mandatory for all applications involving assessment of a
materiat change of use (MCU) assessable against a local governments planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.

1.

This application is for: (tick 1 or both if applicable}

(2) Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval! under the planning scheme (ie.
consideration of the proposal concept)

AND/ OR

evelopment permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(if applicable)

 

The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the dafinition of “gross floor area” go to
the planning scheme against which the RK ESIDENT (At ‘4
application will be assessed,
3. Existing gross floor area: (if appticabto) | : |
4. Are there any existing easements on the land?
C] No
. (2) YES - attack plans of the focation and details of the purpose of the easement
Material change of use details |5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
. vacant land to industry (tyre manufacturing) etc.) |
[| Boumore-y RELAXATION To ExiSmNéE Dwele G |
6. Number of employees: [ np aw ' |
7, Operating days and hours: | n/a : |
Associated building works details (if | 9 Site cover: 2o1. 5 me
applicable) ms ‘
For the definition of *site caver’, “gross floor at
area’ and “storey” go to the planning scheme Gross floor area: 220-2 m
against which the application will be 4 .
sessed. PP 10. Number of on-site car parking spaces: [ 2. CO
11. Number of storeys / maximum height above natural ground:
13. Hours and days the use will operate | n [A - |
. Associated operational works details | 14. Details of associated operational works (ag. landscaping, cut and fil, drainage, road works efc.}

 

LL ivla

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ONLY applicable to assessment manager) -

 

‘DATE RECEIVED |

 

"REFERENCE ~
NUMBERIS | | |

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

         

Form 1 Development Application idas

IDAS Assessment
Checklist

{Formerly the “Referrals Checklist’)

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checktist was formerty referred to as the “Referrats Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
"Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. — Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to

determine the assessment manager" for the application.

Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

Itis the responsibility of the applicant to accuratety complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify

any appticable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination?.

9. Toassist you in answering the fatlowing questions a series of guides are available free from the IPA website www.ipa.gid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the [DAS application process, and its relationship to the Form 1 development application. .

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www ipa.atd.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

PN Oa

 

 

‘SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006,

 

 

Environmentally retevant activity 1. The application involves: (tick appiicabte box/es)

For more information refer to Guide 4, (1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered ‘none of the above" to Q1, has not been made - complete Part G of Form 1

nani en ee byihe C (i) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering «7 made - complete Part G of Form 1

authority, is the assessment manager for the
application, the administering aulhorily is a
concurrence agency for the application in relation
to thls maiter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 7
for approval where an allocation under the Water
Act 2000 is required.

none of the above

 

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)
| DATE RECEIVED REFERENCE NUMBER/S |

 

 

 

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2. For additional information refer to Guide 6 ‘Ooes my application trigger the referral coordination process?"

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (for a devalved ERA) or the Queenstand Department of Primary industries and
Fisheries (for a delegated ERA).

Page 1

Page 7

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

State-controlled road matters

For more information refer to Guide 3.

Unless you answered “none of the above" to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.

In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the IP Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

2.

The application involves: (tick applicable box/es)
CI (i) development on land contiguous* to a State controlled road and for -

1 (a) material change of use assessable against the planning scheme;

(1 (b) reconfiguring a fot unless -
« the total number of lots is not increased; and

« the total number of lots abutting the State-controlled road is not increased;

C1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b) above)-
* associated with access to a State-controlled road; or

« for filling or excavation; or

+ involving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a

State-controlled road.

(1 (ii) development on land not contiguous to a State-controlled road and -
La) material change of use -

(0 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation

« assessable against the local government's
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

that schedule;

planning scheme; and

and exceeding the thresholds set by that schedule;
(I (c) operational work (not associated with a material change of use assessable against the
“planning scheme or reconfiguring a fot mentioned in (b} above}

+ assessable against the local government's planning scheme; and

* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

that schedule.

Hii none of the above

 

Clearing vegetation
For more information refer to Guide 12.

Unless you answered “none of the above" io Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
Manager for the application, NRW is a .
concurrence agency for the application in relation
to this matter.

If you ticked Q3(i) or (ii), your application requizes
referral to NRW for assessment regardless of
whether vegetation clearing is proposed oF not.

The application involves: (tick applicable box/es)
(C(i)_ material change of use -

D ti

Diy

wn

(a) assessable against the planning scheme;

(b)

on a lot containing -

+ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or

+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and

(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

reconfiguring a lot —

a)

(b)
(c)
(d)

on a lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for

the lot, remnant vegetation;

where the size of the lot before the reconfiguration is 2 hectares or larger;

where 2 or more lots are created; and

where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made

{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of

assessable under Schedule 8 of the IPA; and

Form

none of the above.

 

Strategic port land

For more information refer to Guide 11.

Hf you ticked {i} - the relevant Port Authority is ihe
assessment manager for the application.

If you ticked (ii) Queensland Transport is a
concurrence agency for the application,

 

The application involves:
CO (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI

Act) - complete Part | of Form 1

OO (i) a materiat change of use that is inconsistent with the land use plan approved under. the

wai none of the above

Tl Act for the strategic port land - complete Part tof Form 1

 

4 Land contiguous to @ State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtied road: or that is part of a future State-

controlled road.

Page 2

Page 8

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

 

Acid sulfate soils 5. The application involves development on land situated in an identified’ focal government area
For more information refer to Guide 10. and where the surface of the land is: (tick appficable box)
Denon maa me ean 0.05, [1 @ below 20m AHDS and the development will involve the excavation of 1000m? or more of
Deparment of hove a Reso ces and Water soil or sediment at or below 5m AHD, or
(NRW). LO (il at or below 5m AHD and the development will involve filling the site with 1000m3 or more
If an agency other than NRW Is the assessment of material
manager for the application, NRW is an advice /
agency for the application in relation to this MA ‘(iii) none of the above
matter.
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For mare Information refer to Guide 17.
If you answered "YES" to Q6, the application 0
Tequites assessment by the Department of (DYES - comptete Part L of Form 1
Emergency Services (DES).
[fan agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
Telation to this matter,
Water related development under the |7. The application involves:
Water Act 2000 (1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items {a) - {f}, refer (tick applicable box/es}
to Guide 15. Far more information about item . : oes . .
(a), sefer to Guide 14 Does my application oO (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
involve nt of a referable dam? dam) - complete Part Ko, Ks, Ks, Ks, or Ko of Form 1 whichever is applicable;
Unless you answered “none of the above" to Q7, (1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the 7
Department of Natural Resources and Water Ks of Form 4,
(NRW). C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
{fan agency other than NRW is the assessment by a water resource plan, for use for purposes other than stock and/or domestic
manager for the application, NRW Is a fete Part Ky of Form 1: .
concurrence agency for the application in USE - complete Part K: of Form 1,
relation to this matter. (1 @) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
Le) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ke of Form 1;
CJ (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Ks of Form 4
Lg) for constructing a referable dam? or works that will increase the storage capacity
of areferable dam by more than 10% - complete Part Ks of Form 1; OF
Mii) none of the above
Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?

watercourse
For mare information refer to Guide 16.

If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.

Note: Part G of Form 1 Is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

requiring an allocation notice under the Water Act 2000?
iho
(1 YES - complete Parts Kr and G of Form 1

 

5 The identified local govemment areas are: Aurukun, Bowen, 8risbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Doungtas, Fitzroy, Gtadstone, Gold Coast, Hervey Bay, Hinchinbrooke, tsis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirlum Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Australian Height Datum (AHD).
The declared ground water areas are fisted in

ane

9 Watercourse is defined In sch 10 of the IPA.

ide 13 Develos
Referable dam Is defined under the Water Act 2000.

int in a declar

Page 3

Page 9

INTEGRATED PLANNING ACT 1997
Operational! work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
‘Unless you answered "none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

Han agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
telation to this matter.

Local government is the assessment manager
for ali prescribed tidal work.

9.

The application involves operational work that is: ( tick the applicable boxes)

C1 (i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF

O¥i)
D iii

IDAS Assessment Checklist, Version 19.0, 2 March 2007

tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; OF

carried out within a coastal management district under the Coastal Act and for ~ complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.

Oe)

Do)
Oo
Od)
Oe)
OW
O@)

On)
oO

constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) Where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal’ intended to be connected to tidal waters;

constructing an artificial waterway;
reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State

coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,

that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

wo none of the above.

 

Operational work below high water
mark

For more information refer to Guide 18, For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
‘Unless you answered “none of the above" to
Q10, the application triggers referral to

Queensland Transport (QT) (Maritime Setety

Qld) as a concurrence agency.

Local government is the assessment manager
for all prescribed tidal work.

10. The application involves operational work that is: ( tick the applicable box/es)

C1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

(1) (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
CO iii) carried out within a coastal management district's under the Coastal Act and for -

C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part

Oo)
Oo

Mof Form 1;

reclaiming land under tidal water - complete Part M of Form 1; or

constructing a canal’, if the canal is associated with reconfiguring a lot - complete

et) none of the above.

Part M of Form 1;

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

Man agency other than EPA is the assessment
manager for ihe application, EPA is a
concurrence agency for the application in
felation to this matter.

 

11.

The application involves: (tick the applicable box/es) :
a material change of use assessable under a planning scheme involving operational

Diy
Ow)

wi

work carried out completely or partly in a coastal management district's

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA'® of at least 1000m? ,

« the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'? - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 af the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or Partly within a local government tidal area.

12 Canal means canal as defined under ihe Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is detined in the Coastal Protection and Management Regulation 2003 and inctudes certain tidal works completely or partly within a loca! govemment tidal area.
15 Coastal management district is defined in sch 10 of the PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a

coastal Management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the feconfiguration is associated with the construction of an artificiat waterway, must be

accompanied by the application for the operational works to construct the artificial waterway.

Page 4

Page 10

INTEGRATED PLANNING ACT 1997
Development within the limits of a
port

For more information refer lo Guide 18. For
information about prescribed tidal work refer to
Guide 24,

If you answered "YES" to 012, the application
triggers referra to the Port Authority.

The Port Authority is a concurrence agency if the
development is -

.

within 200m of a shipping channel or an entry j-

and exit shipping corridor for the port

* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

« within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.

In all other situation the Port Authority is an

advice agency.

12.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark’? and within the limits of a port
woe Transport infrastructure Act 1994?
NO

(YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidat work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

If you answered "YES" to 013, the application

triggers referral o Queenstand Fire and Rescue
Service as an advice agency.

13.

Does the application involve operational work that is tidal work for a marina’? with more than 6

vesse} berths?
NO

Oo YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered ‘NO" to 014, the retevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
afe concurrence agencies for the application.

 

4.

Does te application involve tidal works within a strategic port land tidal area20?
le)

(YES - complete Past M of Form 4

 

Heritage
For further information refer to Guide 19.

if you answered “YES" to Q15, the application

triggers referral to the Queenstand Heritage
Council as concurrence agency for the
application.

15.

Does the application involve development in a heritage registered place as defined under the

wen Heritage Act 1992?
NO

(1 YES - complete Part C of Form 1

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queenstand,
fefer to Guide 13.

Unless you answered ‘none of the above’ to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the applicalion, NRW is a
concurrence agency for ihe application in
relation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

Li) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;

LA {ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

 

 

 

18 High water mark Is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations {Maritime Poltution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port tand.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997
Contaminated land

Applications involving material change of use
and/ or reconfiguring a lot may trigger this
feferral,

For more information refer to Guide 5.

Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
felation to this matter,

IDAS Assessment Checklist, Version 19.0, 2 March 2007

17. The application involves: (tick the applicable box/es)

C1 (i) reconfiguring a fot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2—
+ item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b)_ in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
D1 (ii) a material change of use -— .
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or

(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

a none of the above

 

Electricity infrastructure

For more information refer to schedule 2of the IP
Requtation.

Unless you answered “none of the above” to
Q18, the application triggers referral to the

agency to which the easement is granted In
favour of as advice agency.

18. The application involves: (tick the applicable box/es)

(i) reconfiguring a tot where any part of the lot is -

» subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

C1) (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if ~
* any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

LC (iii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -

+ any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or party in
the easement;

+ the work is located wholly or partly within 10m of a substation site;

wm) none of the above.

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may
trigger this referral.

For more information refer to schedule 2 of the
IP Regulation.

If you answered “YES” to Q19, the application
fequires assessment by the chief execulive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the applicalion, he
designaling agency will be a concurrence
agency for the application in relation to this
matter.

 

19. Does the application involve development assessable against the planning scheme and on land

designated for community. infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and @
{iii) other than development -
(a) for the designated purpose; or

) carried out by, or on behalf of, the designator.
mro
LJ YEs

 

Page 6

Page 12

INTEGRATED PLANNING ACT 1997
SEQ Regionat Plan

For more information refer to schedute 2 of the
§P Requlation. .
Refer to Chapier 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions,

Uniess you answered “none of ihe above” t>
20, ihe application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 19.0, 2 March 2007
20. The application involves (tick appiicable bowes) -
1 (i) amaterial change of use of premises —
{a} in a Major Development Area in the Urban Footprint for -
OO @  anurban activity -
C1 sinan area included in a structure plan where the IPA, section 3.1.6
applies;

(1 inanarea not included in a structure plan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises wilt exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme

O (i) intensive animal husbandry, or
(1 ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c} in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the fnvestigation Area for —
0 (i) anurban activity and not specified in section 2.10(2);
(2 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
U1 (ii) intensive animal husbandry

C1 (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:

(a) not included in a structure plan; and

ad {b) not specified in section 3.1(2).
{iii) none of the above

 

Fisheries matters

For sore information refer to schedule 2of the IP
Regulation.

Unless you answered ‘none of Ihe above’ to
21, ihe application requires assessment by the
Depariment of Primary !ndustries and Fisheries
(DPI&F),

{f an agency other than OPI8F is the assessment
manager for the appfication, DPI&F is a
concurrence agency for the application in
Telatlon to items (i) ~ (iv) and an advice agency
in selation to item {v).

21. The application involves: (tick the applicable box/es)
{J {i} an assessable material change of use for aquaculture - complete Part O; of Form 1;

C1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;

Lf) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

C1 (w) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

C1 (vy) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area; .

vi) none of the above,

 

 

Page7

Page 13

INTEGRATED PLANNING ACT 1997
integration of land use and public
transport

For more information refer to Guide 23, schedule
BA of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application tiggers referral to QT as a
concurrence agency.

22.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
The application involves: (tick the applicable box/es)—

(CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

D (i) reconfiguring a fot—

(1) (a) on tand that is completely or partly within a public transport corridor, and the
total number of lots increases;

[1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

LC (c) — onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

Od) fora residential purpose within the 25 ANEF contour for an airport;

Le) _ for a residential purpose resulting in 100 or more allotments.

Co (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

O(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1) (b) will result in work that encroaches into an airport's operational airspace.

{iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above", the
application tiggers referral to QT as 3
concurrence agency.

23. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose @
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

0 (ii) reconfiguring a tot—

(1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement; .

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;

LA {c) — ontand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

[J (@) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created:

C(e)  onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

CO (f) for aresidential purpose resulting in 100 or more allotments.

C1 (ili) operationat work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above’or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, “@
the work is not for rail transport infrastructure or other rail infrastructure;

LO (b) is completely or partly within future railway land, or a railway tunnel easement;

(1 (ec) abuts rail corridor land, commercial corridor land or future railway land, and

f the work is within 25m of the railway boundary.
(iv) none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the iP
Requiation

Unless you answered “none of the above’, the
apptication triggers referral to ihe holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Ply Ltd, for
advice.

 

24.

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

O (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

CO (ii) reconfiguring a lot

C1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

a) none of the above.

 

Page 8

Page 14

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Regulation.

Unless you answered “none of the above’, the
application requires referral to the Enviconmental
Protection Agency as a concurrence agency.

(DAS Assessment Checklist, Version 19.0, 2 March 2007

25. The application involves: (tick the appficable box/es)—

O (i) a material change of use’of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

C1 (a) clearing of native vegetation over an area greater than 2500m?,

(J (b)_ anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

(3 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?,

Ld) extracting gravel, rock or sand from an area greater than 5000m2;

(D1 (e) excavating or filling an area greater than 5000m2;

(Cf) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

C1 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -

(2) an increased number of lots;
(1 (b) clearing of native vegetation over an area greater than 2500m?,

C (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedute 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

CO (w) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(J (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m2;

/ C1 () excavating or filling an area greater than 5000m2,
(v) none of the above.

 

Wild river area .

For more information, refer to Guide 27

If you answered YES to 026, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepled by the assessment manager.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
20052

0
(OYES

 

Referral coordination

An information request requires referral
coordination if the application involves -
(i) 3.or more concurrence agencies; or
{il} a facility or area assessable under a
planning scheme and prescribed in
schedute? or 8 of the IP Regulation; or
{ii) development which is subject to an
apptication for preliminary approvat
mentioned in $3,1.6 of the IPA.

For more information go to Guide 2 and Guide 6.

 

27. eee application trigger referral coordination?
NO

(YES, as the application: (tick the applicable box/es)

. Di(i) _ triggers 3 or more concurrence agencies;
* (1 (ii) involves a material change’of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

(2 (ii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation;

EA {iv) _ is for a pretiminary approval mentioned in 3.1.6 of the IPA

 

Referral agency responses prior to
lodgement

Under 3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jurisdiction about a proposal before an
application for the proposal is made to the
assessment manager.

This is commonly the case where an application
requires referral to a building referrat agency (eg.
Qid Fire and Rescue Service).

28. Did a referral agency give a referral agency response under 3.3.2 of the IPA before the
a was made to the assessment manager? :

0
(DYES - attach a copy of the referral agency/s response/s

 

 

Page 9

Page 15

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

SECTION 2 —- ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)

 

Wild River Area

It the responsibility of the applicant to
determine if the development Is proposed in
a wild river area,

Information about witd river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resourcas and Water (NRW), accessing
the department's website www.new.qld.gov.au or
contacting the department by emai on:

wild [email protected]

Note on Referrals

Referrals for development in a wild river area
{other than for agricultural activities and animal
husbandry activities} are not changed from the
existing referral arrangements.

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
river area, see the relevant wild river declaration
and Guidg 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against ihe Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.

The notes on development assessable against
the Wild Rivers Code in this section of ihe
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area.

Applications for some new developments will not
be accepted if he proposed development is in a
high preservation area (HPA). Most applicalions
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Witd Rivers Code where indicated in a relevant
wild river declaration.

 

Environmentally relevant activities
(ERAs) in a designated urban area

If you answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
femaining questions in Section 2.

If you answered NO to 2, please complete the
remaining questions in Section 2.

1.

Which wild river area is the development proposed in?

 

 

 

 

The proposed development is to be located in: (tick the applicable box/es)

(Ji) a high preservation area (HPA);
LJ ii) a preservation area (PA) ;

J ii) a wild river floodplain management area (FMA);

(CJ iv) a wild river nominated waterway;
(1 v) a designated urban area (DUA).

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14; or

ii) Aével 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
NO O YES (ensure you have completed Part G of Form 1)

 

Clearing native vegetation

IL YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.

If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. if YES and you ticked Q4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.

 

Is the application operational work for clearing native vegetation in a HPA?
NO (71 YES (ensure you have completed Part J of Form 1)

If YES, is the clearing?

Oi clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered

area of agriculture in a HPA (see Guide 27); or

LJ ii) in a HPA outside a registered area of agriculture?

 

Page 10

Page 16

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

If you answered YES to O5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

{f you answered YES to Q5 and licked box i) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a locat
government area, it is prescribed tidal work - the
fetevant local government will be the
assessment manager with the EPA as a
concurrence agency

tf you answered YES to Q5, and ticked box ii) or
fii) in 6, your application requires referrat to
DPIF.

If you answered NO to Q5 and ticked box i} in
Q6, the application will not be accepted.

lf you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or If a
fequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted,

If you answered NO at Q5 and ticked box iii} in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
sdevelopment is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27

IDAS Assessment Checklist, Version 19.0, 2 March 2007

Is the devetopment for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Oeveldpment in a wild river area)

NO (yes

The application is for one or more of the following:

O i) Operationat works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1), Or

(J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO iti) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

 

Residential, commercial or Industrial
development

If you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
iver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q7 and ticked either box
i) of ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

Is the application for residential, commercial or industrial development in a designated urban

area?
EINo Clyes

If NO, does the application for residential, commercial or industrial development involve:

(Ji) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

O ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1). :

 

Animal husbandry activities

If you answered YES to Q9 your,application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted If proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wid Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined

Ko Wild Rivers Act 2005) in a PA?
NO (71 YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

Ifyou answered YES to Q10, your application
tequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
Not be accepted if proposed in a HPA. For more
delaits and a definition of agricultural activities

2.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques Is not an agriculturat activity as
defined under the Wid Rivers Act 2005. For
more information see Guide 27.

see the Wild Rivers Act 2005 and refer to Guide

 

10.

1,

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?

NO . (11 YES (ensure you have completed Part Q of Form 1)

If YES is the application for:
oO i) a material change of use; or
(J ii) operational works.

 

Page 11

Page 17

INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
salf assessable or assessable, or are exempt
from wild river requirements.

If you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked 13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessabte section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code,

If you ticked Q13 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt wil not be accepted.

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

if you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code,
and must comply with the code,

If you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q15 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13,

18.

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO (J YES (ensue you have completed Part Ks of Form y

If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works ,

J ii) self-assessable works

(J iil) exempt works

oro application involve works that interfere with overland flow water in a FMA?
Ni oO YES (ensure you have completed the relevant Part K of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?

(1 i) assessable works

(1 ii) self-assessable works / e@
(1 iii) exempt works

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Wf you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply wilh the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
O (1 YES (ensure you have complated Part Os of Form 1)

 

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

If you answered YES to Q17, your application
musi be assessed by DPIF against ihe Wild
Rivers Code and must comply with the code.

ne application involve aquaculture in a PA?
NO LL] YES (ensure you have completed Part O, of Form 1)

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for alt works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or steam diversion) will nat
be accepted.

(na PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box fi) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
walenvays is available by contac! NRW,
accessing the department's website

www.niw.ald.gov.au oF contacting the
department by emait on:

 

wild. [email protected] the application involve operational works that interfere with water in a watercourse that is in

a nominated waterway in a PA?
Ko (J Yes (ensure you have completed the relevant Part K of Form 1)

lf YES,
(J i) The application is for an instream dam or weir; or

(ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 12

Page 18

*

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will nat
be accepted. Applications which may be made
require referral fo the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government {see EPA website for more
information on devolved ERAs)

if you answered NO to Q20 you do not need to
complete Qs 21-24.

If you answered YES to 020 and the
development is in a PA, your application must be
assessed by the administering authority?"
against the Wild Rivers Code and must compty
with the code, unless the proposal Is for
development where an application will not be
accepted, of is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24,

M you answered NO to 21, you do not need to
complete 022. If you answered YES to Q21 you
are required to complete Q22.

If you answered NO to 022, the application wil
not be accepted. If you answered YES to 022,
lhe application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW {as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code,

It you answered YES to 24 the application will
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW.
against the Wiki Rivers Code and must comply
wilh the code.

Exempt ERAs in a designated urban
area

ifthe development is proposed in a designated
urban area there may ba no wild river
requirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the

Wild Rivers Code (other (han exempt ERAs in a
designated urban area).

20.

21,

22.

24,

IDAS Assessment Checklist, Version 19.0, 2 March 2007
oes the application involve an ERA?
MNO CUYES (ensure you have completed Part G of Form!)

Is the application for an ERA 20 instream?
NO Ll yes

Is a quarry allocation notice held for the proposed ERA 20 instream?
Ryn Clyves

Does the application involve any of the following in a HPA?

i) alevel 2 ERA 11, (and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

ili) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivérs Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)
furno ‘Clyes

Is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and

— not low impact; and
— not for a residential complex in the area, or for specified works.
Rho (yes

 

Documentation

(fyou answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.

 

25.

Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?

NO C1 Yes

 

 

21 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.

Page 13

Page 19

*

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

SECTION 3 ~ BUILDING REFERRALS (completion not mandatory)

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS.
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work

For mare information go to schedule 2 table 1 and fequires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998

schedule 2A of the IP Regulation, (IP Regulation) or includes an altemative solution assessed against the performance requirements of the

Assessment period 15 days. No response is a Building Code of Austratia.

deemed refusal.

Fire safety for budget accommodation | 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work

For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation

Regulation building.

Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For more information go to schedule 2 of the IP if the application involves a workplace incorporating spray painting.

Regulation

Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a

For more Intormation go to schedule 2 of the IP retail meat premises.

Regutation .

Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application

For more information go to schedule 2 of the IP involves a private health facility,

Reguiation

Workplace area less than 2.3m? §. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the

For more Information go to schedule 2 of the [P application involves a work place area less that 2.3m?.

Regulation . ©

Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice

toad agency if the application involves iand contiguous {o a State-controlled road,

For more information go to schedule 2 of the IP

Regulation

Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

For more information go to schedule 2 of the 1P if the application involves pastoral workers accommodation.

Regulation :

Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the

For more Information ga to schedule 2 of the IP application involves a childcare centre.

Reguiation

Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency

For more information go to schedute 2 of the |P if the application involves land completely or partly seaward of a coastal building line22,

Regulation

Heritage 11, An application may trigger referral to the Heritage Council as a concurrence agency if the application

For more information go to schedule 2 of the 1P involves a heritage registered place.

Reguiation

Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a

For more information go to schedule 2 of the |P concurrence agency if the application involves assessable building work in a declared fish habitat area; or

Regulation as an advice agency if the application involves assessable building work on land that adjoins a dectared fish
habitat area,

Integration of land use and public 13, An application may trigger referral to Queensland Transport as a concurrence agency if the application

transport involves existing or future public transport corridors, or airport operational airspace”.

For more Information go to schedule 2 af the IP @

Regulation

Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application

For more information go to schedule 2 of the (P involves future railway land.

Reguiation

 

 

 

NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS.

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. Ifno response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.

 

Amenity and aesthetic impact of 15. An application will trigger a referral to the tocal government if it is :

particular building work for single * for a single detached class 1 buitding or class 10 structure; and

detached class 1 building or class 10 «the local government has declared by resolution the following:

building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go to schedise 2 table 1 of the the locality; and

PRequiaton, ~ the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 16 days. No response Is a locality

deemed approval, .

 

 

 

2 Coastal building lines ase prescribed under the Coastal Protection and Management Act 1995.
2) Operational airspace is as defined in State Planning Palicy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities",

Page 14

Page 20

”

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 19.0, 2 March 2007

 

 

 

 

 

 

 

 

Whether particular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes teferral to the local goverment as the concurrence agency.

For more information go 10 schedule 2 table 1 of the

IP Requiation.

Assessment period 15 days. No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Reguiatjon. 18. An application may trigger referral to the local government as the concurrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 19. An application may trigger referral to the jocal government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 41 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedite 2 tabie 1 of the been completed.

IP Requlation.

Assessment period 16 days. No response is a

deemed refusal.

Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For mare information go to schedule 2 table 1 of the « — complies with the performance criteria of the Queensland Development code part 15; and

IP Regulation and the QDC part 15. ¢ the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days. No response is a

deemed refusail.

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more Information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger

[P Regulation and the QDG part 20. referral to the local government as the concurrence agency.

Assessment period 15 days. No respanse is a

deemed refusal.

Building work for removal or 23. An application for the removat and/or rebuilding at another site of a building or other structure, will trigger

rebuilding teferral to the local government as the concurrence agency.

For more information go to schedule 2 table 1 of the

Assessment period 5 days. No response is a

deemed refusal.

Building work for rainwater tank in 24. An application may trigger referrat to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more information go to schedule 2 table | of the
{P Reaulation and the QDC part 25.

Assessment period 15 days, No response is a
deemed refusal,

 

building work or structure complies with the relevant performance criteria if -

« Under the Building Regulation 2006, a rainwater tank is proposed-to be installed as part of relevant
building work, in a designated rainwater tank area; and

« Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

Page 15

Page 21

87bo

 

 

=p=

 

 

 

 

 

 

 

 

 

EXISTING LANDECADED AREA

a? 32! 40"

Zo. 7

 

 

 

 

 

 

SITE PLAN and FLOOR PLAN

 

 

| sf
ite
' f | 7
Garage |
1 &--EN
Ke Life oF |
JA FRR WiLL
eo | 9
— steer | DRIVEL 3
~N [
Garage. ~s, |
N\ Dean
ee |
\ it

 

 

COMMENTS

Ss denotes proposed extension

Site Area: 607.00 sq.m.
Existing house area: 121.20 sq.m.
Proposed extension: 98.98 sq.m.
Roofed Terrace: 41.30 sq.m.
Total house area: 261.48 sq.m.
Allowable: 303.5 sq.m.

RPD: Lot 230 RP 95196

 

LAUNDRY DETAIL

 

A

CLEARWATER Pty Ltd
DESIGN

PROJECT

Clearwater Pty Ltd: License No. 10878033
Telephone/Fax: 5474 8449 Mobile: 0443 878 970

 

 

 

 

 

Mr/s, Q. &.H. Paterson
Project address

103 Noosa Drive
Noosa Heads

Proposed extension and

alterations to existing residence
r 42100

n
a

S|
ats
om eu
Sik
A
ie
RZ
oT
“IS

=

3

ole
ais
212
aie
“tzhio
Sa
Q
ye
o
NI
Y
Qo
~N

g
>
2B
Q
Zz
2

1of2

Page 22

 

COMMENTS

 

   
 

 

$

 

4

 

   

 

 

 

 

 

 

 

HARDI-TEX SHEETING

  
   

 

>

CLEARWATER Pty Ltd
DESIGN
a PROJECT

Clearwater Pty Ltd: License No. 10878033
Telephone/Fax: 5474 8449 Mobile: 0413 878 970

Client:
Mr/s. D. & H. Paterson
Project address
103 Noosa Drive
Noosa Heads
roject
Proposed extension and
alterations to existing residence
Scale: 1: 100
Drawn by: Murray Lyons
Date: February 2007
ETO NEN COT FoR, Job No: 073
_ . ar 4. RR veweay Drawing No: 04-073-07
K+ ex PROT WALL te. MOARY LINE SheetNo: 2 o0f2

ke Proposed Liang } Proposed garage ~
foom. extension of

 

 

 

 

 

 

|

 

 

 

 

 

   

 

 

NEW AIO

NORTH ELEVATION

Page 23

 

 

xm . LAND USE SECTION FEES
aciw MNCL

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 4440
APPLICATION FEES ~
Material Change of Use - Code/impact .
Consistent SIS. 521
Inconsistent : 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period 521
Operational Works - Landscaping 521
Bldg Work assessable against the Planning Scheme . 521
P@-ovcement REVIEW .
Half Hour 522
One Hour . 522
ADVERTISING :
Purchase Advertised Applications 523
JETTIES .
Jetty Application Fee 524
Jetty Bond / _ 50
BONDS Oo
’ Performance Bond . ; 50
SIGNS ,
Registration Fee . : 222
SEARCH FEE / / , :
@ Search of Land Use Section file . : 112
Liquor Licensing Request 113

 

 

tora, $ S757

NAME: . Meerreas x byes

 

 

 

 

 

 

 

ADDRESS: (2 oir pwr e He
vost cans  ¢Se7
FILE NO: c1 8aqa . DATE: €73/o7
RECEIPT NO: KISS IL, Signature of TP Officer: S Rives
AUTHORITY. NO: {)

13/9227/3494/)

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.