Council archive · source document
07/0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published] · 172007.399
INTEGRATED PLANNING ACT 1997 Works that take overland flow water The relevant wild river declaration will state works that take overland flow water are either salf assessable or assessable, or are exempt from wild river requirements. If you ticked Q13 i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. If you ticked 13 ii) an application is not required to be made however the works must comply with the relevant self-assessabte section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code, If you ticked Q13 iii) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt wil not be accepted. Works that interfere with overland flow water The relevant wild river declaration will state works that interfere with overland flow water that are either self assessable, assessable or exempt from wild river requirements. if you ticked Q15 i), your application must be assessed by NRW against the Wild Rivers Code, and must comply with the code, If you ticked Q15 ii) an application is not required to be made however the works must comply with the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. If you ticked Q15 iii) your application is not subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. 13, 18. IDAS Assessment Checklist, Version 19.0, 2 March 2007 Does the application involve works that take overland flow water in a HPA or an FMA? NO (J YES (ensue you have completed Part Ks of Form y If YES, is the application for works stated in the relevant wild river declaration to be? (Ji) assessable works , J ii) self-assessable works (J iil) exempt works oro application involve works that interfere with overland flow water in a FMA? Ni oO YES (ensure you have completed the relevant Part K of Form 1) If YES, is the application for works stated in the relevant wild rivers declaration to be? (1 i) assessable works (1 ii) self-assessable works / e@ (1 iii) exempt works Waterway barrier works Applications for building or raising waterway barrier works in a HPA will not be accepted. Wf you answered YES to Q16, your application must be assessed by DPIF against the Wild Rivers Code and must comply wilh the code. 16. Does the application involve building or raising waterway barrier works in a PA? O (1 YES (ensure you have complated Part Os of Form 1) Aquaculture (non ERA) Applications for aquaculture in a HPA will not be accepted. If you answered YES to Q17, your application musi be assessed by DPIF against ihe Wild Rivers Code and must comply with the code. ne application involve aquaculture in a PA? NO LL] YES (ensure you have completed Part O, of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for alt works that interfere with water in a watercourse (including dams or weirs, stream realignment or steam diversion) will nat be accepted. (na PA, applications for instream dams and weirs may be accepted in nominated waterways. If you ticked box fi) in Q19, your application will not be accepted. Note: Operational works outside a HPA or nominated waterway are not subject to wild river requirements. More information and locations of nominated walenvays is available by contac! NRW, accessing the department's website www.niw.ald.gov.au oF contacting the department by emait on: wild. [email protected] the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? Ko (J Yes (ensure you have completed the relevant Part K of Form 1) lf YES, (J i) The application is for an instream dam or weir; or (ii) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.