07/0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published] · 172007.399
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 19.0, 2 March 2007
State-controlled road matters
For more information refer to Guide 3.
Unless you answered “none of the above" to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.
Schedule 2 of the IP Regulation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
2.
The application involves: (tick applicable box/es)
CI (i) development on land contiguous* to a State controlled road and for -
1 (a) material change of use assessable against the planning scheme;
(1 (b) reconfiguring a fot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
C1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring @ lot mentioned in (b) above)-
* associated with access to a State-controlled road; or
« for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (ii) development on land not contiguous to a State-controlled road and -
La) material change of use -
(0 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
« assessable against the local government's
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
planning scheme; and
and exceeding the thresholds set by that schedule;
(I (c) operational work (not associated with a material change of use assessable against the
“planning scheme or reconfiguring a fot mentioned in (b} above}
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
Hii none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above" io Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
Manager for the application, NRW is a .
concurrence agency for the application in relation
to this matter.
If you ticked Q3(i) or (ii), your application requizes
referral to NRW for assessment regardless of
whether vegetation clearing is proposed oF not.
The application involves: (tick applicable box/es)
(C(i)_ material change of use -
D ti
Diy
wn
(a) assessable against the planning scheme;
(b)
on a lot containing -
+ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
a)
(b)
(c)
(d)
on a lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
where the size of the lot before the reconfiguration is 2 hectares or larger;
where 2 or more lots are created; and
where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
{b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
assessable under Schedule 8 of the IPA; and
Form
none of the above.
Strategic port land
For more information refer to Guide 11.
Hf you ticked {i} - the relevant Port Authority is ihe
assessment manager for the application.
If you ticked (ii) Queensland Transport is a
concurrence agency for the application,
The application involves:
CO (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
OO (i) a materiat change of use that is inconsistent with the land use plan approved under. the
wai none of the above
Tl Act for the strategic port land - complete Part tof Form 1
4 Land contiguous to @ State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controtied road: or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.