Council archive · source document
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published] · 142008.1704
INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
Part P
Prescribed tidal work
Nature of the prescribed tidal works : : cs a = ]
1. What is the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable box/es)
Nature of use ° Estimated value of T f i ht
(Fick applicable box) | completed works (¢) | «| YP Of aPProval soug!
KK) Private use
i Jetty, pier or wharf .
x ty. P (J Non-private use
(7 Private use
ii Boat ramp or spillwa
0 por splway CJ Non-private use
Private use
mm) Mooring pile 4 Non-private use [X] Development Permit
Private use imi
[1 ) Deck or boardwalk 0 (Preliminary approval
{J Non-private use
{XJ Private use
v) Pontoon
XM {_] Non-private use
Private use
OO wi) Revetment, sea wall or retaining wall O .
(] Non-private use
mI (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
o dock, dockyard, embankment, groyne, pipeline or other | (XX) Private use
underground service etc.) - Provide details below
regatta stairs (J Non-private use
2. |s the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles to the waterway?
<a)
| Yes - Submit, with the application, photos of any constructed neighbouring structures. or information about approved but unconstructed
neighbouring structures.
are : “ a
[Adjoining property « access and evidence of support ,.
3. Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
[No & Yes - Complete 03(a)
3(a) What is the nature of the evidence?
[X] Letters of support from adjoining property owner - Sumit, with the application, the letters of support.
[J Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.