Skip to the record
For the highest quality transcripts.

Council archive · source document

08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published] · 142008.1704

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

   

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

asap iy

 

 

 

‘Nature of the works ; * ° ooo. - bse 2k Sa er bog. Ei
1. Nature of work that requires assessment against a planning scheme:
Building work - Complete Table A Operational work - Complete Table B
9
Table B
(i) What is the nature of the operational work?

() Roadworks ([) Stormwater &X) Water infrastructure (L) Sewerage infrastructure

(F] Landscaping ( Earthworks [-] Drainage Works C) Signage

{) Clearing vegetation under the planning scheme {([] Other - Specify below

(ii) What type of approval is being sought? ;vOTE: if you have indicated multiple operational works in questan (i) above andl your answers to ths
question would be different for different operational work, it may be more appropnaie to provide these details in an attachment to ihis form)

{X] Development Permit {[] Preliminary approval (J Both (Specify netow}
(iii) Is the operational work necessary to facilitate the creation of new lots (.e. subdivision)?
No (J Yes - Specify ihe number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

EXNo =] Yes - Complete Table B(a)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)

 

(Mandatory Information oss in Sindh weil secs nda dbus oon,

3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

 

{Confirmation of | ying toa es
* adgement i Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works finchading the
lextent of any cut and fl) &) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
¢ Past A must also be completed for ail 1DAS development applications.
* The applicant is responsibte for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.