Council archive · source document
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published] · 142008.1704
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checkfist, Version 21.3, 9 May 2008
i tie 2. iste 2 dems 12, 14 ard 17, iP Regulation, schedule 1, part 3 table 4, hems 4A and 5
iCOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA : . + |
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[XJ No -Gotoas12 ([_] Yes
IPA, schedule 6. part?
Coastal Protection and M:
WATERWAY BARRIER WORKS; WILD RIVER AREA - oe” . — ° ™— |
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[X] No -Gotoaa13 (_) Yes
IPA, screds i tab
Reguistion. schethde |. pati 3. ta!
table 4, tenis 4A and §
43 patie VON BFGa!
StisA
Sessable Codes). iP Regula sifadule 2. table 2. tom 2eb iP
section 124,
schuntie 3.
ime 4, dem 2, Fishecuss Regul
p Fishorcs 2 a
3 ieald oar are
[DECLARED FISH HABITAT AREA; WILD RIVER AREA...
413 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No -Gotoa4.74
CO Yes
IPA, sche:
Regueation.
4, tom 71PA, schegute 2. pat ssabic eodesi, IP Rexyuleton. schectt:
fs yi
area}.
ate 4. tert 3, Fisheries itegui
005, it
IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA,
4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[xX] No -Gotoasis {_]} Yes
4.45 |s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
IX] No -Gowarr ((] Yes
IPA, schedule 8. part 7. able 1, item ti IP Requistion, schedise 2, (tile 2. lest 37; Wild Rivers Act 2004. sections 12, 134A
iSTATE-CONTROLLED ROAD... —
4.16 ts any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[XJ No - End of section 4 Oo Yes
ee eee
applies when he cppteaton is seeking eval to carry out bul
is work "is ina Tecra fl igh habitat a are y
DECLARED FISH HABITAT AREA & ee
5.1 Is the building work proposed in a declared fish habitat area under the Fisheries Act 1994?
EX] No - End of Sections (] Yes
JPRE APPLICATION REFERRAL AGENCY RESPONSE #2
6.1
REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS 3 [have you satisfied any conditions
IBEEN RECEIVED UNDER IPA S3,2.2 - lista separate . stated i in the! respol se?
1 Resource Entitlement Approval and Concurrence Agency Response ()No [] Yes f& No Conditions
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.