Attachment 7 - Flood Impact Assessment - Covey · 132005.638.06

of 83

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (68.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

        Flood Impact Assessment

        Client:   Noosa Shire Council
        Project: Doonan Landfill
        Location: 561 Noosa-Eumundi Rd, Doonan
                                                                                             covey.com.au




                  M25-0479Rpt           Issue A        Lawrence Mills   Allister Gaffney   January 2026




        Project No 244035 | Ref No M25-0479Rpt – Issue A
        January 2026
dress
Full text of the other 82 pages

Page 2

         Report Review
           Document No.                Revision              Prepared By          Reviewed By            Date Issued

            M25-0479Rpt                 Issue A             Lawrence Mills       Allister Gaffney        January 2026




         Report Review
                     Document                           Revision    Method of                       Issued To
                                                                     Delivery
                      M25-0479Rpt                       Issue A     Electronic                Noosa Shire Council




         © Copyright Covey Associates Pty Ltd (2026).

         This document is the property of Covey Associates Pty Ltd. This document and the information contained
         in it are solely for the use of the authorised recipient and this document may not be used, copies of
         reproduced in whole or part for any purpose other than that for which it was supplied by Covey Associates
         Pty Ltd. Covey Associates Pty Ltd makes no representation, undertakes no duty and accepts no
         responsibility to any third party who may use or rely upon this document or the information contained in
         it.

         COPYRIGHT NOTICE:           Parts of this document contain material originally prepared by:

         This material is the intellectual property and copyright of Covey Associates Pty Ltd.



                               L Mills                                                 A Gaffney
                         Author: Lawrence Mills                                     Review: Allister Gaffney
                        Water Resources Engineer                               Senior Civil Engineer / Team Lead
                               BEng (Civil)                                  Beng (Civil), MEng, RPEng, RPEQ-24345




Flood Impact Assessment                                                                                             Page 1 of 25
Project No 244035| Ref No M25-0479Rpt – Issue A – January 2026

Page 3

          CONTENTS
         1.0    INTRODUCTION                                                4
         2.0    SITE DESCRIPTION                                            4

         2.1           Site Location                                        4

         2.2           Existing Land-use, Topography and Drainage           5

         2.3           Proposed Land-use                                    5
         3.0    FLOOD IMPACT ASSESSMENT                                     7

         3.1           Flood Modelling                                      7

         3.2           Hydrology                                            7

         3.3           Temporal Patterns and Rainfall Intensity             8

         3.4           Rainfall Durations                                   8

         3.5           Rainfall Losses                                      8

         3.6           Pre-Burst Rainfall                                   9

         3.7           Areal Reduction Factor                               9

         3.8           Manning`s Values                                     9

         3.9           Fraction Impervious                                 10

         3.10          Topography                                          10

         3.11          Grid Cell Size                                      11

         3.12          Tailwater Conditions                                11

         3.13          Hydraulic Structures                                11

         3.14          Developed Case Scenario                             14

         3.15          Results                                             15
                       3.15.1 Onsite Impacts                               15
                       3.15.2     Offsite Impacts                          16
         4.0    CONCLUSION                                                 19
         5.0    REFERENCES                                                 20




Flood Impact Assessment                                             Page 2 of 25
Project No 244035| Ref No M25-0479Rpt – Issue A – January 2026

Page 4

         LIST OF FIGURES


         Figure 2-1 – Site Locality (Image Courtesy of Nearmap) ........................................................................ 4
         Figure 2-2 – Proposed Development Masterplan ................................................................................... 5
         Figure 2-3 – Development Site Topography with Surrounding 0.5m Existing Contours ........................ 6
         Figure 3-1 – Model Extent with 1 meter Contours ................................................................................. 8
         Figure 3-2 – Existing Site Topography with 0.5m Contours .................................................................. 10
         Figure 3-3 – Hydraulic Structures Locations - North ............................................................................. 12
         Figure 3-4 – Hydraulic Structures Locations - South ............................................................................. 12
         Figure 3-5 – Water Surface Levels Locations with the 1%AEP CC WSL Extent ..................................... 16
         Figure 3-6 – Offsite Impacts Reporting Locations ................................................................................. 17


         LIST OF TABLES

         Table 2-1 - Development Staging ............................................................................................................ 6
         Table 3-1 - Areal Reduction Factors ........................................................................................................ 9
         Table 3-2 - Existing Hydraulic Structures .............................................................................................. 13
         Table 3-3 - Developed Hydraulic Structures ......................................................................................... 14
         Table 3-4 - Water Surface Levels for Design Events ............................................................................. 16
         Table 3-5 - Peak Afflux for all Stages and Design Events ...................................................................... 17




          List of Appendices

          Appendix A                       SITE PLANS

          Appendix B                       MANNING`S N ROUGHNESS COEFFICIENT MAPS

          Appendix C                       FLOOD MAPS




Flood Impact Assessment                                                                                                                         Page 3 of 25
Project No 244035| Ref No M25-0479Rpt – Issue A – January 2026

Page 5

         1.0      INTRODUCTION
         This Flood Impact Assessment (FIA) has been prepared to quantify the overland flow flood impacts for
         the proposed development at 561 Noosa-Eumundi Rd, Doonan. This assessment has been prepared for
         each development stage outlined as part of the Master Plan. The FIA will ensure appropriate methods
         and designs are implemented to suitably mitigate overland flow risks and/or flood hazards and will
         provide information and guidance to support the outcomes required by Noosa Shire Council (NSC). NSC
         requires that stormwater runoff be appropriately managed prior to discharge from the site.
         The development application is for the Doonan Resource and Recovery Redevelopment and associated
         infrastructure (e.g., roads, carparks, etc.) to support this use. Refer to the site plans in Appendix A for
         further detail. The engineering plans are current at the time of writing this report, if the plans are changed
         it is recommended that the plans be provided to Covey Associates for reassessment.
         This FIA describes the flooding characteristics of the proposed development site under existing and
         proposed conditions to understand what impact, if any, the proposed development may have on the
         existing flooding regime within the site and surrounding properties.

         2.0     SITE DESCRIPTION

         2.1     Site Location

         The site's real property description is Lot 77 SP298776. The total area of the site is approximately 192
         ha. The area of work is approximately 42 ha. Refer to Figure 2-1 for further details.




                                    Figure 2-1 – Site Locality (Image Courtesy of Nearmap)



Flood Impact Assessment                                                                                         Page 4 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 6

         2.2     Existing Land-use, Topography and Drainage

         The site in its existing state is the Noosa Resource Recovery Centre, which is mainly covered with
         maintained bushland in the northern portion of the site and existing buildings and landfill areas in the
         southern portion. The site is surrounded by bushland to the east, west and south. There are residential
         lots and a golf course to the north.

         The site slope is approximately 1.5%, with gradual changes in elevation from 30 m AHD to 16 m AHD. The
         site slopes from south to north and discharges over the northern boundary to the northern road reserve
         before flowing through the golf course. Note that the site also has an external upstream catchment to
         the south, which has been considered in the assessment.

         2.3     Proposed Land-use

         The Masterplan development is inclusive of a Recycle and Transfer Station Centre and associated
         infrastructure, which is replacing the Solid Waste Depot and Reviva Noosa Reuse Shop buildings. Further,
         a proposed HES basin and future stockpile and concrete crushing areas to replace the existing waste areas,
         a future compost facility area, a proposed solar farm, multiple landfill cells and associated infrastructure
         (access road, parking areas, etc.). Refer to Figure 2-2 for the development layout.




                                        Figure 2-2 – Proposed Development Masterplan



Flood Impact Assessment                                                                                       Page 5 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 7

         The proposed development will be implemented in six stages. The components for each stage as shown
         in Figure 2-2 are described in Table 2-1. The stage boundaries are shown in Figure 2-3.

                                                 Table 2-1 - Development Staging

                   Stage                                                 Description

                                                            RRA Expansion Project
                     1               Northern and Eastern Capping (including solar panels) & Compost facility
                     2                                 Resource and Recovery Precinct Project

                     3                                            Expansion cell 1.1 and 1.2

                     4                                              Future landfill cell 3.1

                     5                                              Future landfill cell 3.2

                     6                                   Future landfill cell 3.3 (ultimate case)




                  Figure 2-3 – Development Site Topography with Surrounding 0.5m Existing Contours




Flood Impact Assessment                                                                                         Page 6 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 8

         Earthworks have been proposed to accommodate the development of the site and to facilitate efficient
         drainage. Appropriate drainage infrastructure has been proposed in the design, including overland flow
         swales to discharge local flows from the site and to convey runoff from external catchments around the
         site.

         3.0     FLOOD IMPACT ASSESSMENT

         3.1     Flood Modelling

         Flood modelling of the site was undertaken using TUFLOW, a 1D/2D hydraulic modelling software
         package, to ensure stormwater flows from upstream catchments external to the site can be conveyed
         through the site and to demonstrate that no unacceptable impacts will occur on surrounding properties
         as a result of the proposed development.

         Scenarios modelled as part of this investigation include:
            • Existing Case Scenario – modelling the undeveloped conditions.
            • Developed Case Scenario – modelling the site with an updated Digital Elevation Model (DEM) for
                 each design stage, upgraded hydraulic structure at the road crossing the large clean water drain
                 and updated Manning’s roughness coefficients and soil infiltration rates to represent the
                 proposed development layout.

         Modelling was undertaken for the 50%, 10%, and 1% and 1% climate change Annual Exceedance
         Probability (AEP) events for all existing and developed case scenarios. The current climate events rainfall
         depths were scaled up to consider 1.0 degree of warming up to the year 2025 (relative to 1961-1990
         rainfall depths). The climate change event rainfall depths were scaled up based on 3.6 degrees of
         warming, equivalent to SSP3-7.0 in the year 2100.

         Rare events such as 0.5%, 0.2% and 0.1% AEP storm events have also been modelled for the ultimate
         developed case scenario (Stage 6). The rare events were also scaled up to consider 1.0 degree of warming.

         3.2     Hydrology

         A “Rain on Grid” modelling approach was adopted for this overland flow study and as such, no traditional
         hydrological modelling was required. The total catchment area adopted for this assessment was
         approximately 287 ha. Refer to Figure 3-1 for the overall extent of the 2D flood model and the quadtree
         extent for the model. This is discussed further in Section 3.11.




Flood Impact Assessment                                                                                      Page 7 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 9

                                       Figure 3-1 – Model Extent with 1 meter Contours



         3.3     Temporal Patterns and Rainfall Intensity

         Temporal patterns are based on Australian Rainfall and Runoff (ARR) 2019 Ensemble Storm Temporal
         Patterns and have been sourced directly from ARR data hub. Rainfall intensities are typical for this area
         and have been sourced directly from the Bureau of Meteorology (BOM).

         3.4     Rainfall Durations

         Initially, flood modelling was undertaken for all rainfall durations ranging from 10 minutes to 720 minutes.
         This range of durations was simulated to ensure the critical durations for the catchment were captured.
         From reviewing the results, it was determined that the critical durations experienced at the proposed
         development site and immediately surrounding the site ranged from 20 minutes up to 360 minutes and
         therefore these were the durations adopted for this analysis.

         3.5     Rainfall Losses

         Adopted rainfall losses were sourced from ARR Data Hub. Rainfall losses for this region are as follows:
         •        Initial Losses – 27.2 mm; and
         •        Continuing Losses – 2.8 mm/hr.
         The losses were scaled up to consider 1.0 degree of warming.




Flood Impact Assessment                                                                                       Page 8 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 10

         3.6     Pre-Burst Rainfall

         Rainfall losses adopted for the model are for complete storms. As such, pre-burst depths have been
         subtracted from the adopted initial losses to get the correct storm burst initial losses.
         From a review of the median and 75% pre-burst depths, it was concluded that the median pre-burst
         depths were not appropriate for this investigation, particularly given that the outcome of this
         investigation will determine minimum floor levels for residential properties. As such, adopting the 75%
         pre burst depths was considered more appropriate for this investigation.

         3.7     Areal Reduction Factor

         ARR 2019 guidelines recommend adopting Areal Reduction Factors (ARFs) for catchments greater than 1
         km2. Given that the associated catchment area modelled as part of this simulation is approximately 2.87
         km2, ARFs were adopted for this analysis. Refer to Table 3-1 for adopted ARFs.


                                               Table 3-1 - Areal Reduction Factors
                    Dur                                               AEP (%)
                   (min)          50             10                 1           0.5    0.2       0.1
                     20          0.957          0.955             0.948     0.946     0.944     0.943
                     25          0.962          0.958             0.952     0.951     0.948     0.947
                     30          0.965           0.96             0.955     0.954     0.951     0.95
                     45          0.972          0.969             0.961     0.959     0.956     0.954
                     60          0.976          0.973             0.964     0.962     0.959     0.957
                     90          0.981          0.977             0.966     0.965     0.96      0.958
                    120          0.984           0.98             0.967     0.965     0.961     0.958
                    180          0.987          0.983             0.969     0.966     0.962     0.959
                    270          0.99           0.986             0.975     0.972     0.969     0.966
                    360          0.991          0.989             0.982     0.981     0.978     0.977



         3.8     Manning`s Values

         Manning’s n roughness coefficients have been manually delineated for the entire contributing catchment.
         Refer to Appendix B for the Manning’s Roughness Coefficient Maps. Land uses and corresponding
         Manning’s roughness coefficients for the hydraulic model are as follows:
             • 0.018 – Roads
             • 0.075 – Trees / Bushland
             • 0.050 – Grassland
             • 0.300 – Roof
             • 0.030 – Unsealed road
             • 0.015 – Water body
             • 0.018 – Compost
             • 0.020 – Solar Panels
             • 0.030 – Landfill




Flood Impact Assessment                                                                                  Page 9 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 11

         3.9     Fraction Impervious

         The fraction impervious values adopted for each land use are as follows:
             • Roads – 100%
             • Trees / Bushland - 0%
             • Grassland – 0%
             • Roof– 100%
             • Unsealed road – 50%
             • Water body – 100%
             • Compost – 80%
             • Solar Panels – 100%
             • Landfill – 75%

         3.10    Topography

         The existing surface topography is shown in Figure 3-2. Topography for the full extent of the 2D hydraulic
         model was created using 2015/2023 LIDAR and survey within the development site (grey area on Figure
         3-2).




                                  Figure 3-2 – Existing Site Topography with 0.5m Contours




Flood Impact Assessment                                                                                    Page 10 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 12

         3.11    Grid Cell Size

         A 16-metre hydraulic grid cell size was adopted for the model generally. A one metre hydraulic grid cell
         size was adopted for the area of work within the site and a four to eight-metre grid cell size for the
         surrounding areas using the TUFLOW Quadtree add on which precisely simulates hydraulics of
         stormwater runoff within the area of interest. Refer to Figure 3-1 for the Quadtree extent. The adopted
         hydraulic grid cell sizes have been deemed sufficient to accurately represent flood flows and levels
         throughout the hydraulic model.

         3.12    Tailwater Conditions

         A tailwater condition with an average downstream slope of 0.5% has been adopted at the outlet of the
         hydraulic model. The downstream boundary of the model is approximately 500 m downstream from the
         outlet of the site. This ensures negligible influence from the downstream tailwater condition.

         3.13    Hydraulic Structures

         Hydraulic structures adopted for this assessment have been modelled as 1D elements in the hydraulic
         model. All 1D element locations are shown in Figure 3-3 and Figure 3-4. The existing culvert information
         (e.g., size, length, material and invert levels) was based on available survey information. However, the
         survey information for the culverts on Eumundi-Noosa Rd and Emu Mountain Rd only included
         downstream invert levels. Therefore, the upstream invert levels were estimated by assuming a culvert
         grade of approximately 0.5%. If there are any major discrepancies, it is recommended that the culverts
         be surveyed and the information provided to Covey Associates for determination. Refer to Table 3-2 for
         further details of the existing hydraulic structures. Refer to Table 3-3 for further details on the proposed
         hydraulic structures.

         The 1D elements included a 30% blockage factor in accordance with QUDM (2017) and a Manning’s n of
         0.013 was applied. The hydraulic model did not include on-site detention tanks.




Flood Impact Assessment                                                                                      Page 11 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 13

                                      Figure 3-3 – Hydraulic Structures Locations - North




                                      Figure 3-4 – Hydraulic Structures Locations - South




Flood Impact Assessment                                                                     Page 12 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 14

                                            Table 3-2 - Existing Hydraulic Structures
                                    Type              Upstream
                                                                  Downstream             Size
                                                        Invert                                  No. of
                        ID        C=circular                      Invert Level
                                                        Level                           (mm)    Pipes
                                 R=box culvert                      (m AHD)
                                                       (m AHD)
                       A01              C               15.464       15.262             600       1
                        B1              C               15.538       15.291             600       2
                        C1              C               15.526       15.394             600       1
                        E1              C               14.185       12.849             450       1
                        G1              C               13.393       13.363             500       1
                        G2              C               13.716       13.652             450       1
                        T1              C                20.05       19.86              600       1
                        T2              C               21.384       21.234             525       1
                        T3              C               18.722       18.572             900       2
                        T4              R                18.41       18.262        900 x 300      1
                        T5              C               18.033       17.883             375       1
                        T6              C               17.164       17.014             375       1
                        T7              C                15.15       14.993             375       1
                       T11              C                23.05       22.247             450       2
                       T12              C               23.156       23.589             500       1
                       T13              C                23.84       23.59              375       1
                        H1              R               16.798       16.735       1200 x 400      1
                        R1              C               13.419       13.382             500       1
                        R4              C               13.217       13.089             450       1
                       R41              C               13.645       13.513             450       1
                        R6              R               13.772       13.633             450       1
                        R9              C               14.381       14.28              430       1
                       R10              C               16.362       16.264             600       1
                       R11              C               15.732       15.102             600       1
                       R12              C               15.179       15.11              600       1
                       R13              C                19.34       19.331             650       1
                       R14              C               18.457       18.34              725       1
                       R15              C               17.769       17.679             750       1
                       R16              C               22.959       22.486             135       2
                       R23              C               13.391       12.878             375       1
                        Z1              C               12.932       12.568             450       4
                        Z2              C                12.07       12.005             375       2
                        Z3              C               12.932       12.568             525       2
                        Z4              C                14.01       14.001             500       2
                        P1              C               13.583       12.823             300       1
                        P3              C               13.922       13.594             300       1
                        P2              C               14.219       13.926             225       1
                        P4              C               13.998       13.62              150       1
                        P5              C                 13.6       13.309             300       1
                        P6              C               13.298       12.897             300       1



Flood Impact Assessment                                                                                  Page 13 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026


[OCR of page images]
Table 3-2 - Existing Hydraulic Structures

600
600
600
450
500
450
600
525
900
900 x 300
375
375
375
450
500
375
1200 x 400
500
450
450
450
430
600
600
600
650
725
750
135
375
450
375
525!
500
300
300
225
150
300
300

Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
R
Cc
Cc
Cc
Cc
Cc
Cc
R
Cc
Cc
Cc
R
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc

Pl BP} PTE] PI RPI NI RIN BT REIN RJ RB] Ry Pye] By Py eye] Py Bye] Ry RIM Ry RT By RIN | By Ry RB] RB] Ry RIN] eB

 

 

Flood Impact Assessment Page 13 of 25
Project No 244035 | Ref No M25-0479Rpt — Issue A — January 2026

Page 15

                                           Table 3-3 - Developed Hydraulic Structures
                                  Type                Upstream      Downstream
                                C=circular           Invert Level   Invert Level         Size    No. of
                     ID
                               R=box culvert           (m AHD)        (m AHD)           (mm)     Pipes

                   DEV01              R                 12.310        12.200       2100 x 1500     6


         3.14    Developed Case Scenario

         The changes to the developed case scenario included:
             •      A design TIN to represent finished elevation levels for the proposed development site at each
                    stage of the development. Refer to Figure 2-3 for the developed case topography adopted
                    for each development stage in the model;
             •      Added a set of culverts for the road crossing at the existing clean water drain;
             •      Update the impervious area to represent the proposed development site; and
             •      Updated Manning’s n roughness coefficients and soil infiltration rates based on values shown
                    in the developed model Manning’s maps in Appendix B.




Flood Impact Assessment                                                                                   Page 14 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 16

         3.15    Results

         Results from all modelled scenarios were exported and peak water surface levels have been mapped to
         demonstrate conveyance within the overland flow paths. A comparison between the existing and
         developed peak water surface levels, velocities and hazards was undertaken for all scenarios. The change
         in water surface level was mapped to ensure no unacceptable offsite impacts were experienced and
         ensure risk and flood hazard will be appropriately managed. Refer to the Flood Maps in Appendix C for
         further detail.

         Generally, it was demonstrated that the existing and developed overland flow paths have an adequate
         conveyance of overland flow from upstream external catchments for all simulated events.

         3.15.1 Onsite Impacts
         In the developed scenario, during the 1% AEP climate change event, the water surface level on the
         western internal roadways and drains increased between by up to 300 mm. However, this flow is safely
         conveyed through the site without inundating the proposed buildings. In addition, the hazard (depth x
         velocity) on the internal roads is acceptable (< 0.6 m2/s). This increase is also noted immediately upstream
         of the proposed culverts (DEV01). This is expected as the proposed road crossing the channel will cause
         head loss at this location as the flow enters the culverts. However, the results also demonstrated that the
         road crossing has an immunity up to the 1% AEP climate change event. Similarly, within the drains on the
         eastern side of the site, flows which are contained within the existing drains demonstrated increases of
         up to 250 mm.

         The northern section of the site, downstream of the area of works, contains vegetation and existing
         overland flow paths. Increased in water surface level of 20-50 mm were noted in these areas. However,
         these areas are part of the subject site and are unlikely to be developed, therefore the impacts are not
         deemed an actionable nuisance.

         The water surface levels in the vicinity of the HES basin and proposed buildings have been provided as
         shown in Figure 3-5 and Table 3-4. The levels can be used to set the minimum floor levels as required.




Flood Impact Assessment                                                                                      Page 15 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 17

                                      Table 3-4 - Water Surface Levels for Design Events
                                                                  Point ID / Location
                                           AEP
                                                        A             B         C         D
                                           50%        13.63        13.10      11.92     11.63
                                           10%        13.89        13 .39     12.06     11.75
                                           1%         14.12        13.67      12.21     11.87
                                          1% CC       14.39        14.00      12.35     11.98
                                          0.50%       14.17        13.73      12.23     11.89
                                          0.20%       14.27        13.85      12.29     11.93
                                          0.10%       14.35        13.95      12.33     11.96




                      Figure 3-5 – Water Surface Levels Locations with the 1%AEP CC WSL Extent

         3.15.2 Offsite Impacts

         Offsite impacts were observed to occur at three locations as labelled in Figure 3-6. A summary of the peak
         afflux is shown in Table 3-5.




Flood Impact Assessment                                                                                    Page 16 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 18

                                   Table 3-5 - Peak Afflux for all Stages and Design Events
          Region ID /                                                  Peak Afflux (mm)*
                               AEP
           Location                           Stage 1        Stage 2    Stage 3     Stage 4   Stage 5   Stage 6
                          50%AEP                21             21         43          43        43        75
                          10%AEP                 0              0         58          58        58        105
                1
                          1%AEP                  0              0         51          51        51        125
                          1%AEPCC                0              0         62          62        62        147
                          50%AEP                 6              6         15          15        15        67
                          10%AEP                 0              0          9           9         9        65
                2
                          1%AEP                  1              1         13          13        13        82
                          1%AEPCC                1              1         18          18        18        90
                          50%AEP                12              9         11           5         8        35
                          10%AEP                 5              3          5           0         2        32
                3
                          1%AEP                  5              0          0           0         2        21
                          1%AEPCC                0              0          0           0         0        19

         *Orange highlighting denotes afflux greater than 20mm




                                       Figure 3-6 – Offsite Impacts Reporting Locations

         Increases in water surface level of 20-150 mm were noted within and in the vicinity of the easement
         adjacent the south-western boundary (Location 1). Under the 50%AEP event increases in water surface
         level of 21-75mm occur throughout all development stages within the easement. For 10%, 1% and 1%
         AEP events, the water level increases from Stage 3 onwards, with affluxes ranging from 51mm-147mm
         and the largest increase occurring in the 1%AEPCC event. During these events the largest impacts occur
         in a single isolated point, within the Emu Mountain Road reserve as opposed to the easement itself.




Flood Impact Assessment                                                                                   Page 17 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 19

         There is an existing valley in this area which conveys overland flow through this easement. However, as
         the increase in water surface level is contained within this valley and the valley conveys flow in the existing
         case it is not considered to be an actionable nuisance.

         Increases in peak water surface levels also occurred just outside the south-eastern boundary within
         Walter Hay Drive (Location 2), a Transport and Main Roads (TMR) administered road reserve. Increases
         in water surface levels were relatively minor at this location, not exceeding 18mm, up until Stage 5. The
         impact was greater for Stage 6, with increases in water surface level of up to 82mm. In Stages 1 and 2,
         increases in peak water surface level were slightly more prominent for the 50% AEP whilst in Stage 3-5
         the increase was notably largest for the 1% AEP CC event. No inundation of Walter Hay Drive roadway
         occurs under any scenario and the impacts are contained within the vegetation and existing valley. It is
         expected that under the developed case scenario, the existing valley will continue to convey flows safely
         to the north-west back through the subject site, and would not pose an actionable nuisance.

         Similarly, in the vicinity of the road crossing at Hollett Road (Location 3), increases in water surface levels
         were also relatively minor up until Stage 5, not exceeding 12mm, with larger increases occurring after
         Stage 6. Increases in peak water surface levels ranged between 19-35 mm for the 50%, 10% and 1% AEP
         events. Notably at this location, the maximum increase occurred in the 50% AEP for all design stages as
         opposed to the 1%AEPCC event. In the existing scenario the maximum hazard is 2.26 m2/s, which has a
         hazard classification of H4 and is considered to be unsafe for vehicles and people (AIDR, 2017). In the
         developed case the hazard increases slightly to 2.31 m2/s however it remains in the same hazard category.
         Therefore, the impact is not considered to be an actionable nuisance as the road crossing maintains the
         same hazard category and is not safe to use for the simulated design events.

         Excluding the impacts noted above, the flood mapping demonstrated that there were no other offsite
         increases in peak water surface level, depth, velocity or hazard as a result of the proposed development.
         Further, as the proposed additional impervious areas are much smaller than the overall catchment, the
         minor increase in the fraction impervious has a negligible effect on the overall catchment peak discharges,
         as demonstrated by the flood mapping. Further, as the majority of the impervious areas of the proposed
         development are located closer to the downstream boundary (outlet) the peak discharge will arrive at
         the outlet much sooner than the overall catchment. Therefore, no detention is required for the proposed
         development.

         Based on a review of the results shown in the flood maps in Appendix C, it can be concluded that the
         proposed development will not create a nuisance or interfere with the use or enjoyment of any land
         surrounding the proposed development site.




Flood Impact Assessment                                                                                        Page 18 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 20

         4.0     CONCLUSION
         Covey Associates has been engaged by Noosa Shire Council to provide a Flood Impact Assessment for the
         staged development of the proposed Doonan Landfill redevelopment and its facilities and associated
         infrastructure at 561 Noosa-Eumundi Rd, Doonan.

         Ensemble storm hydraulic (TUFLOW) flood modelling in accordance with ARR 2019 guidelines was
         undertaken for all existing and developed case scenarios for the 50%, 10%, 1% and 1% climate change
         Annual Exceedance Probability (AEP) events. For the ultimate developed case scenario (Stage 6),
         additional modelling was undertaken for the 0.5%, 0.2%, and 0.1% AEP events to determine future
         building floor levels.

         The flood mapping demonstrated that generally the on-site overland flow paths adequately conveyed
         both internal and external catchment flows. Increases in water surface level were noted in the developed
         case scenarios, however, all increases were contained within existing flow paths and at road crossings
         there was no worsening of the existing hazard category for these areas. Further, as a result of the
         proposed development, there is no actionable nuisance due to the change in peak water level, depth,
         velocity and hazard on the surrounding properties for all modelled AEPs.

         Through this assessment, it has been demonstrated that the proposed development and associated
         infrastructure will not result in any actionable nuisance to any of the surrounding properties or
         infrastructure with regards to overland flow. Further, based on the results of this study, on-site detention
         is not required for the development.

         Sufficient consideration of stormwater quantity controls has been demonstrated by:
             •        Compliance with the requirements of the Noosa Plan (2020);
             •        Queensland State Planning Policy (2017); and
             •        Compliance with QUDM (2017).




Flood Impact Assessment                                                                                      Page 19 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 21

         5.0     REFERENCES
         Australian Institute for Disaster Resilience (AIDR) (2017), Australian Disaster Resilience Handbook – Flood
                 Hazard.

         Department of State Development, Infrastructure and Planning (2017), State Planning Policy. Brisbane,
                Queensland.

         Institute of Public Works Engineering Australia, Queensland Division Ltd (2017), Queensland Urban
                  Drainage Manual, Fourth Edition.

         Noosa Shire Council (2020), Noosa Plan




Flood Impact Assessment                                                                                     Page 20 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 22

                                                       APPENDIX A
                                                        SITE PLANS




Flood Impact Assessment                                              Page 21 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 23

                                                                                                                                                                                                                                                                                                                                                        IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                    CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                   AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                      ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                              FUTURE GRAVEL                                                                                                                                                             COMMENCEMENT OF EXCAVATION
                                                                                                                                                                          HARDSTAND, CLEANAWAY
                                                                                                                                                                           VEHICLE PARKING AREA

                                                                                                                                                                                                       CURRENT GREEN
                                                                                                                                                                  PROP                                   WASTE AREA,
                                                                                                                                                                       O
                                                                                                                                                                  HES B SED                             FUTURE SCRAP
                                                                                                                                                      REVIVA           ASIN
                                                                                                                                                      CENTRE                                           METAL STOCKPILE                CURRENT GREEN
                                                                                                                                                                                                            AREA                       WASTE AREA,
                                                                                                                                                                                                                                     FUTURE CONCRETE
                                                                                                  CLEANAWAY                                                                                                                           CRUSHING AREA
                                                                                                    DEPOT
                                                                                                                                                                                                                                                            CURRENT CONCRETE
                                                                                                                                                                                                                                                            CRUSHING AND SCRAP
                                                                                                                                                                                                                                                           METAL STOCKPILE AREA,
                                                                                                   SITE ENTRANCE                                                                                                                                             PROPOSED FUTURE
                                                                                                                                                                                                                                                           COMPOST FACILITY AREA



                                                                                                                                      TRANSFER                                                                                                                                FUTURE
                                                                                                                                      STATION                                                                                                                                LANDFILL
                                                                                                                                      BUILDING                                                                                                                                CELL 3.1

                                                                                                                                                                                 ACCESS ROAD




                                                                                                                                                                                                                                                                                                        EXISTING
                                                                                                                                                                                          PROPOSED SOLAR FARM                                                                                           LANDFILL
                                                                                                                                                                                                                                                                                                         CELL 2.1
                                                                                                           EUMUNDI-NOOSA ROAD




                                                                                                                                                 RU
                                                                                                                                                   TC                                                                           EXISTING
                                                                                                                                                       HR
                                                                                                                                                         OA                                                                     LANDFILL                         EXISTING                     FUTURE
                                                                                                                                                           D
                                                                                                                                                                                                                                 CELL 1.1                        LANDFILL                    LANDFILL
                                                                                                                                                                                                                                                                 CELL 2.2                    CELL 3.2




                                                                                                                                                                                                                                                                                                                                                                       DRIVE
                                                                                                                                                                                                                                                                                                                                                                    R HAY
                                                                                                                                                                                                                                                                                                                                                                      E
                                                                                                                                                                                                                                                                                                                                                                  WALT
                                                                                                                                                                                                                                                                                                                FUTURE                HES BASIN
                                                                                                                                                                                                                                                                                                               LANDFILL
                                                                                                                                                                                                                                            EXPANSION CELL 1.1      EXPAN                                      CELL 3.3
                                                                                                                                                                                                                                                                             SION C
                                                                                                                                                                                                                                                                                   ELL 2.2



                                                                                                                                                                            EMU MOUNTAIN ROAD




                                                                                                                                                                                                                                                                                                                                                         SCALE 1:2000 (A1) - 1:4000 (A3)
                                                                                                                                                                                                                                                                    CLEAN WATER
                                                                                                                                                                                                                                                                   DIVERSION DRAIN                                                                  Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                    Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                    Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                    Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                                                                                    the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                    services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                    contractor prior to commencement of works.

                                                                                                                                                               Approved
Checked -    CJT                                                                                                                                                                                                   Drawing title -                               Project -   DOONAN RESOURCE                         Site -                       Project No.     244035       Sheet No.             C1001
Design -    CJT        Drawn -    KR
                                                                                                                                                                                                                   COMPLETE SITE MASTERPLAN                                  RECOVERY REDEVELOPMENT                  561 EUMUNDI-NOOSA ROAD,      Digital Ref :   C1000 SITE MASTERPLAN    Issue :        B
Scales -    AS SHOWN                               B   22.04.2025   INCLUSION OF CLEANAWAY PARKING HARDSTAND                    KR                             COVEY ASSOCIATES PTY LTD    124 DUPORTH AVENUE                                                    Client -
                                                                                                                                                                                                                                                                             NOOSA SHIRE COUNCIL                     DOONAN                         This Document is copyright and shall not be copied
                                                   A   24.02.2025   PRELIMINARY ISSUE                                           CJT
                                                                                                                                                               ABN 59 137 305 992          PO BOX 16                                                                                                                                                without written approval, nor shall it be used except
Document Stage -       PRELIMINARY                                                                                                                             (07) 5443 7777              MAROOCHYDORE QLD 4558                                                                                                                                    for the Development and the Site Specified.
                                                  Issue Date                      Description                                   By                             [email protected]
       C:\12dS\data\12DSERVER\244035_3605\Design (Covey)\Drawings - Concept Design\Uncontrolled\C1000 SITE MASTERPLAN.dwg                                                                                                                                                                                                                         Plot 3 June 2025 - 4:27 PM

Page 24

                                                       APPENDIX B
                     MANNING`S N ROUGHNESS COEFFICIENT MAPS




Flood Impact Assessment                                             Page 22 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 25

 

covey

Doonan Landfill

Existing Case

Manning's n Roughness Coefficients Map

Legend
Oo Site Boundary

Cadastral Boundary

Manning's n Roughness Coefficients

O
Bo
B
Bo
Oo
Oo
O
Oo
B
O

Default Grassland (n=0.050)
Road Pavement (n=0.018)
Trees and Bushland (n=0.075)
Roof (n=0.300)

Unsealed Road (n=0.030)
Water Body (n=0.015)

Landfill (n=0.030)

Grassland (n=0.050)

Compost (n=0.018)

Solar Panels (n=0.020)

0 100

 

Page 26

 

covey

Doonan Landfill

Developed Case
Manning's n Roughness Coefficients Map

Legend

Oo Site Boundary

Cadastral Boundary
Manning's n Roughness Coefficients
Default Grassland (n=0.050)
Road Pavement (n=0.018)
Trees and Bushland (n=0.075)
Roof (n=0.300)
Unsealed Road (n=0.030)
Water Body (n=0.015)

030)

Grassland (|
Compost (n=0.018)
Solar Panels (n=0.020)

O
Bo
B
Bo
Oo
Oo
O
Oo
B
O

0 100

 

Page 27

                                                       APPENDIX C
                                                      FLOOD MAPS




Flood Impact Assessment                                             Page 23 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Page 28

Landfill

Existing Case Scenario
50% AEP
Water Surface Level Map

Legend

Oo Site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
i <=4
i +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18 - 20
20 - 22
22 - 24
24-26
26 - 28
28 - 30
30 - 32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

BH
v
&

0 100

 

Page 29

Landfill

Existing Case Scenario
10% AEP
Water Surface Level Map

Legend

Oo Site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
i <=4
i +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18 - 20
20 - 22
22 - 24
24-26
26 - 28
28 - 30
30 - 32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

BH
v
&

0 100

 

Page 30

Doonan Landfill

Existing Case Scenario
1% AEP
Water Surface Level Map

Legend

Oo Site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18 - 20
20 - 22
22 - 24
24-26
26 - 28
28 - 30
30 - 32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

BH
v
&

0 100

 

Page 31

Doonan Landfill

Existing Case Scenario
1% AEP Climate Change
Water Surface Level Map

Legend

Oo Site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18 - 20
20 - 22
22 - 24
24-26
26 - 28
28 - 30
30 - 32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

BH
vo
&

0 100

 

Page 32

Doonan Landfill

Developed Case Scenario
Stage 1 - 50% AEP
Water Surface Level Map

| Legend
© site Boundary
Cadastral Boundary
Water Surface Level (mAHD)
i <=4
HB +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 33

Doonan Landfill

Developed Case Scenario
Stage 1 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 34

Doonan Landfill

Developed Case Scenario
Stage 1 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

Emu|Mountain Rd

0 100

 

Page 35

Doonan Landfill

Developed Case Scenario
Stage 1 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 36

Doonan Landfill

Developed Case Scenario
Stage 2 - 50% AEP
Water Surface Level Map

| Legend
© site Boundary
Cadastral Boundary
Water Surface Level (mAHD)
i <=4
HB +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 37

Doonan Landfill

Developed Case Scenario
Stage 2 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 38

Doonan Landfill

Developed Case Scenario
Stage 2 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

Emu|Mountain Rd

0 100

 

Page 39

Doonan Landfill

Developed Case Scenario
Stage 2 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 40

Doonan Landfill

Developed Case Scenario
Stage 3 - 50% AEP
Water Surface Level Map

| Legend
© site Boundary
Cadastral Boundary
Water Surface Level (mAHD)
i <=4
HB +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 41

Doonan Landfill

Developed Case Scenario
Stage 3 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 42

Doonan Landfill

Developed Case Scenario
Stage 3 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 43

Doonan Landfill

Developed Case Scenario
Stage 3 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 44

Doonan Landfill

Developed Case Scenario
Stage 4 - 50% AEP
Water Surface Level Map

| Legend
© site Boundary
Cadastral Boundary
Water Surface Level (mAHD)
i <=4
HB +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 45

Doonan Landfill

Developed Case Scenario
Stage 4 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 46

Doonan Landfill

Developed Case Scenario
Stage 4 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 47

covey

Doonan Landfill

Developed Case Scenario
Stage 4 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 48

Doonan Landfill

Developed Case Scenario
Stage 5 - 50% AEP
Water Surface Level Map

| Legend
© site Boundary
Cadastral Boundary
Water Surface Level (mAHD)
i <=4
HB +-6
i c-s
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 49

Doonan Landfill

Developed Case Scenario
Stage 5 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 50

Doonan Landfill

Developed Case Scenario
Stage 5 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 51

covey

Doonan Landfill

Developed Case Scenario
Stage 5 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 52

Doonan Landfill

Developed Case Scenario
Stage 6 - 50% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 53

Doonan Landfill

Developed Case Scenario
Stage 6 - 10% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 54

covey

Doonan Landfill

Developed Case Scenario
Stage 6 - 1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 55

covey

Doonan Landfill

Developed Case Scenario
Stage 6 - 1% AEP Climate Change
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 56

covey

Doonan Landfill

Developed Case Scenario
Stage 6 - 0.5% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 57

covey

Doonan Landfill

Developed Case Scenario
Stage 6 - 0.2% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 58

covey

Doonan Landfill

Developed Case Scenario
Stage 6 - 0.1% AEP
Water Surface Level Map

Legend

© site Boundary
Cadastral Boundary

 

Water Surface Level (mAHD)
<=4
4-6
6-8
8-10
10-12
12-14
14-16
16-18
18-20
20-22
22 - 24
24-26
26 - 28
28 - 30
30-32
32 - 34
34 - 36
36 - 38
38-40

a
a
a
Oo
O
O
o
oH
a
Oo
O
O
Oo
Oo
O
a
o
a
o

a
vo
é

0 100

 

Page 59

Doonan Landfill

Stage 1 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

Afflux (m)

MB <=-01

-0.1 - -0.05

0.05 - -0.02

-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet

Was Wet Now Dry

 

Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 60

covey

Doonan Landfill

Stage 1 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 61

covey

Doonan Landfill

Stage 1 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 62

covey

Doonan Landfill

Stage 1 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 63

Doonan Landfill

Stage 2 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

Afflux (m)

MB <=-01

-0.1 - -0.05

0.05 - -0.02

-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet

Was Wet Now Dry

 

Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 64

covey

Doonan Landfill

Stage 2 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 65

covey

Doonan Landfill

Stage 2 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 66

covey

Doonan Landfill

Stage 2 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 67

Doonan Landfill

Stage 3 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

Afflux (m)

MB <=-01

-0.1 - -0.05

0.05 - -0.02

-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet

Was Wet Now Dry

 

Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 68

covey

Doonan Landfill

Stage 3 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 69

covey

Doonan Landfill

Stage 3 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 70

covey

Doonan Landfill

Stage 3 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 71

Doonan Landfill

Stage 4 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

Afflux (m)

MB <=-01

-0.1 - -0.05

0.05 - -0.02

-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet

Was Wet Now Dry

 

Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 72

covey

Doonan Landfill

Stage 4 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 73

covey

Doonan Landfill

Stage 4 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 74

covey

Doonan Landfill

Stage 4 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 75

Doonan Landfill

Stage 5 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

Afflux (m)

MB <=-01

-0.1 - -0.05

0.05 - -0.02

-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet

Was Wet Now Dry

 

Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 76

covey

Doonan Landfill

Stage 5 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 77

covey

Doonan Landfill

Stage 5 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 78

covey

Doonan Landfill

Stage 5 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 79

covey

Doonan Landfill

Stage 6 - 50% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 80

covey

Doonan Landfill

Stage 6 - 10% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 81

covey

Doonan Landfill

Stage 6 - 1% AEP
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

Afflux (m)
MB <=-01
-0.1 - -0.05
0.05 - -0.02
-0.02 - 0.02
0.02 - 0.05
0.05 - 0.1
>O1
Was Dry Now Wet
Was Wet Now Dry

0 100

 

Page 82

covey

Doonan Landfill

Stage 6 - 1% AEP Climate Change
Afflux Map

Legend

© site Boundary
Cadastral Boundary

 

>
3
=
x

>
3

2

<=
-0.1 - -0.05

0.05 - -0.02
-0.02 - 0.02

0.02 - 0.05

0.05 - 0.1

>O1

Was Dry Now Wet
Was Wet Now Dry

m

a
Oo
O
O
O
Oo
oH
a
a

0 100

 

Page 83

Flood Impact Assessment                                           Page 24 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Used in these records

About this file

File size
68.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 7 - Flood Impact Assessment - Covey.pdf · 68.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.