3.11 Grid Cell Size
A 16-metre hydraulic grid cell size was adopted for the model generally. A one metre hydraulic grid cell
size was adopted for the area of work within the site and a four to eight-metre grid cell size for the
surrounding areas using the TUFLOW Quadtree add on which precisely simulates hydraulics of
stormwater runoff within the area of interest. Refer to Figure 3-1 for the Quadtree extent. The adopted
hydraulic grid cell sizes have been deemed sufficient to accurately represent flood flows and levels
throughout the hydraulic model.
3.12 Tailwater Conditions
A tailwater condition with an average downstream slope of 0.5% has been adopted at the outlet of the
hydraulic model. The downstream boundary of the model is approximately 500 m downstream from the
outlet of the site. This ensures negligible influence from the downstream tailwater condition.
3.13 Hydraulic Structures
Hydraulic structures adopted for this assessment have been modelled as 1D elements in the hydraulic
model. All 1D element locations are shown in Figure 3-3 and Figure 3-4. The existing culvert information
(e.g., size, length, material and invert levels) was based on available survey information. However, the
survey information for the culverts on Eumundi-Noosa Rd and Emu Mountain Rd only included
downstream invert levels. Therefore, the upstream invert levels were estimated by assuming a culvert
grade of approximately 0.5%. If there are any major discrepancies, it is recommended that the culverts
be surveyed and the information provided to Covey Associates for determination. Refer to Table 3-2 for
further details of the existing hydraulic structures. Refer to Table 3-3 for further details on the proposed
hydraulic structures.
The 1D elements included a 30% blockage factor in accordance with QUDM (2017) and a Manning’s n of
0.013 was applied. The hydraulic model did not include on-site detention tanks.
Flood Impact Assessment Page 11 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.