                                   Table 3-5 - Peak Afflux for all Stages and Design Events
          Region ID /                                                  Peak Afflux (mm)*
                               AEP
           Location                           Stage 1        Stage 2    Stage 3     Stage 4   Stage 5   Stage 6
                          50%AEP                21             21         43          43        43        75
                          10%AEP                 0              0         58          58        58        105
                1
                          1%AEP                  0              0         51          51        51        125
                          1%AEPCC                0              0         62          62        62        147
                          50%AEP                 6              6         15          15        15        67
                          10%AEP                 0              0          9           9         9        65
                2
                          1%AEP                  1              1         13          13        13        82
                          1%AEPCC                1              1         18          18        18        90
                          50%AEP                12              9         11           5         8        35
                          10%AEP                 5              3          5           0         2        32
                3
                          1%AEP                  5              0          0           0         2        21
                          1%AEPCC                0              0          0           0         0        19

         *Orange highlighting denotes afflux greater than 20mm




                                       Figure 3-6 – Offsite Impacts Reporting Locations

         Increases in water surface level of 20-150 mm were noted within and in the vicinity of the easement
         adjacent the south-western boundary (Location 1). Under the 50%AEP event increases in water surface
         level of 21-75mm occur throughout all development stages within the easement. For 10%, 1% and 1%
         AEP events, the water level increases from Stage 3 onwards, with affluxes ranging from 51mm-147mm
         and the largest increase occurring in the 1%AEPCC event. During these events the largest impacts occur
         in a single isolated point, within the Emu Mountain Road reserve as opposed to the easement itself.




Flood Impact Assessment                                                                                   Page 17 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Used in these records

About this file

File size
68.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 7 - Flood Impact Assessment - Covey.pdf · 68.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.