Table 3-5 - Peak Afflux for all Stages and Design Events
Region ID / Peak Afflux (mm)*
AEP
Location Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6
50%AEP 21 21 43 43 43 75
10%AEP 0 0 58 58 58 105
1
1%AEP 0 0 51 51 51 125
1%AEPCC 0 0 62 62 62 147
50%AEP 6 6 15 15 15 67
10%AEP 0 0 9 9 9 65
2
1%AEP 1 1 13 13 13 82
1%AEPCC 1 1 18 18 18 90
50%AEP 12 9 11 5 8 35
10%AEP 5 3 5 0 2 32
3
1%AEP 5 0 0 0 2 21
1%AEPCC 0 0 0 0 0 19
*Orange highlighting denotes afflux greater than 20mm
Figure 3-6 – Offsite Impacts Reporting Locations
Increases in water surface level of 20-150 mm were noted within and in the vicinity of the easement
adjacent the south-western boundary (Location 1). Under the 50%AEP event increases in water surface
level of 21-75mm occur throughout all development stages within the easement. For 10%, 1% and 1%
AEP events, the water level increases from Stage 3 onwards, with affluxes ranging from 51mm-147mm
and the largest increase occurring in the 1%AEPCC event. During these events the largest impacts occur
in a single isolated point, within the Emu Mountain Road reserve as opposed to the easement itself.
Flood Impact Assessment Page 17 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.